Exhibit_B.pdf

PDF 495 KB Posted

Attached to
Lockwood Boulevard Force Main and Reclaim Water Main Construction
Solicitation number
CC-7045-26/HSM
Issued by
Seminole County, Florida

About this file

Exhibit B is a bid schedule for the Seminole County Board of County Commissioners' Invitation for Bid for Project CC-7045-26/HSM, the Lockwood Boulevard Force Main and Reclaimed Water Main Construction. The project encompasses the furnishing and installation of approximately 5,502 linear feet of new water and sewer infrastructure in the Carillon service area of Sanford, Florida, including 10-inch PVC and HDPE force main piping, 12-inch PVC and HDPE reclaimed water main piping, and associated valves and appurtenances. The scope includes asphalt and concrete removal and replacement (1,790 square yards and 75 square yards respectively), concrete curb and gutter replacement (26 linear feet), landscape restoration and sodding (41,859 square feet), open-cut and horizontal directional drilling installations for both force and reclaimed water mains, valve and tapping sleeve installations, wetwell modifications, and grout-filling of existing infrastructure. Mandatory pre-proposal meeting attendance is required on February 20, 2026 at 9:00 AM at Carillon Community Park in Oviedo, Florida, with electronic bid submissions due by March 18, 2026 at 2:00 PM through the Seminole County procurement portal. Technical drawings and specifications are released upon RSVP submission, with a question submission deadline of March 5, 2026 at 5:00 PM. Substantial completion is required within 150 calendar days and final completion within 180 days thereafter.

The contract will be awarded on a fixed lump-sum basis to the lowest responsive and responsible bidder, with an engineer's estimate of $2,600,000 for the base bid. Bidders must submit bid security equal to five percent of the total bid amount. Upon award, the successful contractor must execute Performance, Payment, and one-year Warranty Bonds from Treasury-authorized surety companies. Contractors must be fully licensed and certified in Florida, comply with Chapter 440 Workers' Compensation requirements, and perform at least 51 percent of total work within their own organization. Comprehensive insurance is required, including Workers' Compensation with $1,000,000 employers' liability coverage, $1,000,000 per occurrence/$2,000,000 aggregate Commercial General Liability with Explosion and Collapse coverage, $1,000,000 combined single limit Business Automobile Liability, $2,000,000 per occurrence Excess/Umbrella Liability, and $1,000,000 per occurrence/$2,000,000 aggregate Pollution and Professional Liability coverage. Liquidated damages are assessed at $250.00 per day for delays beyond substantial completion and $62.50 per day for delays beyond final completion. The contractor must comply with E-Verify employment verification and, if project funding includes FEMA disaster relief grants, Davis-Bacon wage requirements and prevailing wage standards. Minority and Women-Owned Business Enterprises are encouraged to participate in this solicitation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. Description Quantity Unit Unit Price Cost

1 Mobilization and Demobilization (10% of Item No. 5 -21) 1 LS

2 General Conditions (5% of Items 5-21) 1 LS

3 Pre and Post Construction Color Audio-Visual Documentation 1 LS

4 Temporary Traffic Control 1 LS

5 Asphalt Removal and Replacement 1,790 SY

6 Concrete Driveway and Sidewalk Removal and Replacement 75 SY

7 Concrete Curb and Gutter Replacement 26 LF

8 Landscape Restoration, Sodding and Hedges 41,859 SF

9 10-inch PVC Force Main- Open Cut 1,989 LF

10 10-inch HDPE Force Main - HDD 1,797 LF

11 12-inch PVC Reclaimed Water - Open Cut 1,504 LF

12 12-inch HDPE Reclaimed Water - HDD 212 LF

13 Connection to Existing Wet Well - Lockwood Blvd 1 EA

14 10-inch Plug Valve (F&I) 7 EA

15 12-inch Gate Valve (F&I) 1 EA

16 10-inch Tapping Sleeve and Tapping Valve (F&I) 2 EA

17 12-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA

18 Automatic Air/Vacuum Release Valve Assembly (F&I) 6 EA

19 Grading 1 LS

20 Wetwell Top Slab Replacement 1 LS

21 Fill Existing Force Main with Grout and Place Out of Service 180 LF

Engineers Estimate of Probable Construction Cost Lockwood Blvd Force Main Design

Seminole County

Total Estimated Construction Cost - BASE BID

January 2026

100% OPCC

Unit PriceLS:
CostLS:
Unit PriceLS_2:
CostLS_2:
Unit PriceLS_3:
CostLS_3:
Unit PriceLS_4:
CostLS_4:
Unit PriceSY:
CostSY:
Unit PriceSY_2:
CostSY_2:
Unit PriceLF:
CostLF:
Unit PriceSF:
CostSF:
Unit PriceLF_2:
CostLF_2:
Unit PriceLF_3:
CostLF_3:
Unit PriceLF_4:
CostLF_4:
Unit PriceLF_5:
CostLF_5:
Unit PriceEA:
CostEA:
Unit PriceEA_2:
CostEA_2:
Unit PriceEA_3:
CostEA_3:
Unit PriceEA_4:
CostEA_4:
Unit PriceEA_5:
CostEA_5:
Unit PriceEA_6:
CostEA_6:
Unit PriceLS_5:
CostLS_5:
Unit PriceLS_6:
CostLS_6:
Unit PriceLF_6:
CostLF_6:
CostTotal Estimated Construction Cost BASE BID:

File details come from the government source that posted it. Updated .