Lockwood Boulevard Force Main and Reclaim Water Main Construction
Solicitation number
CC-7045-26/HSM
Issued by
Seminole County, Florida

About this file

This is a bid form (Exhibit B) for Seminole County Board of County Commissioners' Invitation for Bid (IFB) Project CC-7045-26/HSM for Lockwood Boulevard Force Main and Reclaimed Water Main Construction in Sanford, Florida. The project encompasses construction services including approximately 5,502 linear feet of new water and sewer infrastructure comprising 10-inch PVC and HDPE force main piping (3,786 linear feet total), 12-inch PVC and HDPE reclaimed water main piping (1,716 linear feet total), and associated valves and appurtenances. The scope also includes asphalt and concrete removal and replacement (1,510 square yards of asphalt; 20 square yards concrete sidewalk; 55 square yards concrete driveway; 26 linear feet of curb and gutter), landscape restoration and sodding (41,859 square feet), tree removal and replacement (45 trees each), temporary traffic control, pre- and post-construction documentation, and off-duty uniformed police officers (15 days). Mandatory pre-proposal meeting attendance is required on February 20, 2026 at 9:00 AM at Carillon Community Park in Oviedo, Florida, with electronic bid submission deadline of March 18, 2026 at 2:00 PM through https://secure.procurenow.com/portal/seminolefl. Question submission deadline is March 5, 2026 at 5:00 PM. Substantial completion is required within 150 calendar days and final completion within 180 days thereafter, with liquidated damages of $250.00 per day for delays beyond substantial completion.

The contract will be awarded to the lowest responsive and responsible bidder on a fixed lump-sum basis with an engineer's estimate of $2,600,000. Bidders must submit bid security equal to five percent of the total bid amount in the form of certified check, cashier's check, or bid bond. Upon award, the successful contractor must execute Performance Bond, Payment Bond, and one-year Warranty Bond from Treasury Department and Florida-authorized surety companies. Contractors must be fully licensed and certified in Florida, comply with Chapter 440 Workers' Compensation requirements, and perform at least 51 percent of total work by equipment and labor costs within their own organization. Insurance requirements include Workers' Compensation with statutory limits and $1,000,000 employers' liability, Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Business Automobile Liability of $1,000,000 combined single limit, Excess/Umbrella Liability of $2,000,000 per occurrence, Pollution Liability of $1,000,000 per occurrence/$2,000,000 aggregate, and Professional Liability of $1,000,000 per claim/$2,000,000 aggregate. Minority and Women-Owned Business Enterprises (M/WBEs) are encouraged to participate. If funded through FEMA disaster relief grants, Davis-Bacon wage requirements and prevailing wage standards apply. Bids remain firm for 90 days following bid opening.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item No. Description Quantity Unit Unit Price Cost 1 Mobilization and Demobilization (10% of Item No. 6 -27) 1 LS

2 General Conditions (5% of Item No. 6 -27) 1 LS

3 Pre and Post Construction Color Audio-Visual Documentation 1 LS

4 Temporary Traffic Control 1 LS

5 Off-Duty Uniformed Police Officer 15 DY

6 Asphalt Removal and Replacement 1,510 SY

7 Concrete Sidewalk Removal and Replacement 20 SY

8 Concrete Driveway Removal and Replacement 55 SY

9 Concrete Curb and Gutter Replacement 26 LF

10 Landscape Restoration, Sodding and Hedges 41,859 SF

11 10-inch PVC Force Main- Open Cut 1,989 LF

12 10-inch HDPE Force Main - HDD 1,797 LF 13 12-inch PVC Reclaimed Water - Open Cut 1,504 LF 14 12-inch HDPE Reclaimed Water - HDD 212 LF 15 Connection to Existing Wet Well - Lockwood Blvd 1 EA

16 10-inch Plug Valve (F&I) 7 EA

17 10-inch Gate Valve (F&I) 1 EA

18 12-inch Gate Valve (F&I) 1 EA

19 8-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA

20 12-inch x 10-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA 21 24-inch x 12-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA 22 Automatic Air/Vacuum Release Valve Assembly (F&I) 6 EA 23 Grading 1 LS 24 Wetwell Top Slab Replacement 1 LS 25 Field Locates at Point of Connections 2 EA 26 Clearing and Tree Removal 45 EA 27 Tree Replacement 45 EA

Total Construction Cost - BASE BID

Seminole County Lockwood Blvd Force Main Design

Bid Form March 2026

EXHIBIT B

OPCC Addendum 1

Unit PriceLS:
CostLS:
Unit PriceLS_2:
CostLS_2:
Unit PriceLS_3:
CostLS_3:
Unit PriceLS_4:
CostLS_4:
Unit PriceDY:
CostDY:
Unit PriceSY:
CostSY:
Unit PriceSY_2:
CostSY_2:
Unit PriceSY_3:
CostSY_3:
Unit PriceLF:
CostLF:
Unit PriceSF:
CostSF:
Unit PriceLF_2:
CostLF_2:
Unit PriceLF_3:
CostLF_3:
Unit PriceLF_4:
CostLF_4:
Unit PriceLF_5:
CostLF_5:
Unit PriceEA:
CostEA:
Unit PriceEA_2:
CostEA_2:
Unit PriceEA_3:
CostEA_3:
Unit PriceEA_4:
CostEA_4:
Unit PriceEA_5:
CostEA_5:
Unit PriceEA_6:
CostEA_6:
Unit PriceEA_7:
CostEA_7:
Unit PriceEA_8:
CostEA_8:
Unit PriceLS_5:
CostLS_5:
Unit PriceLS_6:
CostLS_6:
Unit PriceEA_9:
CostEA_9:
Unit PriceEA_10:
CostEA_10:
Unit PriceEA_11:
CostEA_11:
Total Construction Cost BASE BID:

File details come from the government source that posted it. Updated .