Exhibit B is a bid tabulation form for Seminole County Board of County Commissioners' Invitation for Bid Project CC-7045-26/HSM for the Lockwood Boulevard Force Main and Reclaimed Water Main Construction. The project encompasses the construction of a new sewer force main and reclaimed water main in the Carillon service area, addressing capacity deficiencies in the existing gravity sewer main. The work includes furnishing and installation of piping through open cut excavation along an easement between Hagerty High School and residential properties on West Bourne Drive, as well as directional drilling installation along Lockwood Boulevard between West Bourne Drive and the Carillon Master Pump Station. The scope of work includes 21 line items covering mobilization, general conditions, documentation, traffic control, asphalt and concrete removal and replacement, landscaping restoration, force main and reclaimed water main installation in various sizes and installation methods, valve installations, grading, wetwell modifications, and decommissioning of existing infrastructure. The bid form provides columns for unit prices and costs across multiple line items with quantities specified in standard units including lump sum (LS), square yards (SY), linear feet (LF), square feet (SF), and each (EA).
The engineer's estimate for the total project cost is $2,600,000 for the base bid as of January 2026. Bid documents are available through the Seminole County website at https://secure.procurenow.com/portal/seminolefl, with technical drawings and specifications made available upon RSVP submission to Seminole County Purchasing & Contracts personnel. Minority and Women-Owned Business Enterprises (M/WBEs) are encouraged to participate. Prospective bidders are instructed to direct all inquiries exclusively to designated Seminole County contact personnel and are cautioned against contacting other county staff or officials regarding the solicitation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Quantity Unit Unit Price Cost
1 Mobilization and Demobilization (10% of Item No. 5 -21) 1 LS
2 General Conditions (5% of Items 5-21) 1 LS
3 Pre and Post Construction Color Audio-Visual Documentation 1 LS
4 Temporary Traffic Control 1 LS
5 Asphalt Removal and Replacement 1,790 SY
6 Concrete Driveway and Sidewalk Removal and Replacement 75 SY
7 Concrete Curb and Gutter Replacement 26 LF
8 Landscape Restoration, Sodding and Hedges 41,859 SF
9 10-inch PVC Force Main- Open Cut 1,989 LF
10 10-inch HDPE Force Main - HDD 1,797 LF
11 12-inch PVC Reclaimed Water - Open Cut 1,504 LF
12 12-inch HDPE Reclaimed Water - HDD 212 LF
13 Connection to Existing Wet Well - Lockwood Blvd 1 EA
14 10-inch Plug Valve (F&I) 7 EA
15 12-inch Gate Valve (F&I) 1 EA
16 10-inch Tapping Sleeve and Tapping Valve (F&I) 2 EA
17 12-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA
18 Automatic Air/Vacuum Release Valve Assembly (F&I) 6 EA
19 Grading 1 LS
20 Wetwell Top Slab Replacement 1 LS
21 Fill Existing Force Main with Grout and Place Out of Service 180 LF
Engineers Estimate of Probable Construction Cost Lockwood Blvd Force Main Design
Seminole County
Total Estimated Construction Cost - BASE BID
January 2026
100% OPCC
| Unit PriceLS: |
| CostLS: |
| Unit PriceLS_2: |
| CostLS_2: |
| Unit PriceLS_3: |
| CostLS_3: |
| Unit PriceLS_4: |
| CostLS_4: |
| Unit PriceSY: |
| CostSY: |
| Unit PriceSY_2: |
| CostSY_2: |
| Unit PriceLF: |
| CostLF: |
| Unit PriceSF: |
| CostSF: |
| Unit PriceLF_2: |
| CostLF_2: |
| Unit PriceLF_3: |
| CostLF_3: |
| Unit PriceLF_4: |
| CostLF_4: |
| Unit PriceLF_5: |
| CostLF_5: |
| Unit PriceEA: |
| CostEA: |
| Unit PriceEA_2: |
| CostEA_2: |
| Unit PriceEA_3: |
| CostEA_3: |
| Unit PriceEA_4: |
| CostEA_4: |
| Unit PriceEA_5: |
| CostEA_5: |
| Unit PriceEA_6: |
| CostEA_6: |
| Unit PriceLS_5: |
| CostLS_5: |
| Unit PriceLS_6: |
| CostLS_6: |
| Unit PriceLF_6: |
| CostLF_6: |
| CostTotal Estimated Construction Cost BASE BID: |
File details come from the government source that posted it. Updated .