Exhibit_B-Clinton_Service_Reports.pdf

PDF 421 KB Posted

Attached to
cooling tower & closed loop system water treatment
Solicitation number
EV00000722
Issued by
Cleveland County, Oklahoma

About this file

These documents are monthly service reports from Global Water Technology, Inc. for water treatment services at the Oklahoma Veterans Centers Clinton Veterans Center, spanning February through April 2025. The reports detail comprehensive water quality monitoring and maintenance for multiple cooling tower and closed loop systems, including BAC Tower 1, BAC Tower 2, BAC Closed System, Reymsa Cooling Tower, and Reymsa Closed Loop. During monthly site visits, a senior analyst conducted water chemistry testing, measured various parameters like conductivity, pH, alkalinity, hardness, and chlorides, and made chemical feed adjustments to maintain optimal system performance.

The recurring service reports reveal ongoing water treatment challenges, with most systems frequently falling outside recommended ranges for scale and corrosion control. Notably, the technician repeatedly noted that previously added chemistry had caused leaks, preventing further chemical treatments until explicitly instructed otherwise. This situation risks continued corrosion of system piping. The service reports consistently recommend minimizing risk and maximizing efficiency, warning that failure to follow recommendations could increase the facility's risk of contamination, corrosion, scaling, or system failure. The reports also reference ASHRAE Standard 188-2015, suggesting the need for a compliant water management program including proactive biological testing.

View the file

Other files

File Type Posted
Exhibit_C-Lawton_Reports.pdf PDF
AttachmentBStateGeneralTerms.pdf PDF
OMESformCP076.pdf PDF
Water_Testing-RFP.pdf PDF
Exhibit_E-Sulphur_Reports.pdf PDF
Exhibit_A-Ardmore_Service_Report.pdf PDF
Attachment_Price_Sheet.pdf PDF
OMESFormCP004.pdf PDF
Exhibit_D-Norman_Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Make Up BAC Tower 1 BAC Tower 2 BAC Closed System Reymsa Cooling

Tower Reymsa Closed

Loop

Conductivity (as mmhos) 1101 1982 1900 - 2000

1900 - 2000

829 1768 1900 - 2000 pH 8.02 Record

8.82 8 - 9.2

8.71 8 - 9.2

8.6 8 - 8.8

9.1 8 - 9.2

8.57 8 - 8.8

Alkalinity, P (ppm as CaCO3) 0 Record

Record

Record

Record

Alkalinity, M (ppm as CaCO3) 150 320 650 max

650 max

650 max

Chlorides as Cl- 50 90 Record

Record

Record

Hardness, total (ppm as CaCO3) 120 250 1000 max

1000 max

1000 max

PTSA 60.8

70 min

9.1 70 min

79.3 70 min

Nitrite (ppm as NO2) 0 500 min

500 min

Hardness Cycles (Calculated)

2.1

2.25 - 3.75

1.9

2.25 - 3.75

2.6

2.25 - 3.75

Chloride Cycles (Calculated)

1.8

2.25 - 3.75

1.8

2.25 - 3.75

1.8

2.25 - 3.75

Iron (ppm as Fe) 0.79

0.2 max

0.74

0.2 max

Opening Comment The purpose of my visit today was to perform service for all systems. Some adjustments were made to the chemical feed for the tower systems.

Make Up Online The makeup will be tested each service visit to determine is adjustments to the water treatment programs are required. We established a baseline today.

BAC Tower 1 Online Tower one was low on scale inhibitor. The chemical pump has been adjusted to feed more inhibitor.

PTSA

The chemical pump has been adjusted. I will continue to monitor this and make more adjustments as needed.

BAC Tower 2 Online This cooling tower system was highly out of range for proper scale and corrosion protection.

Service Report February Monthly Service

Thursday, February 27, 2025 5:48 PM CST

Oklahoma Veterans Centers Clinton Veterans Center 1701 S. 4th Clinton Oklahoma 73601

(808) 469-8856

Report Number: 199367 Recorded By: Grayson Lavin

(708) 349-9991 glavin@gwt-inc.com

Clinton Veterans Center - Cooling and Loop

Global Water Technology, Inc. - 354 West Armory Drive, South Holland IL 60473 (708) 349-9991

Site Visit Contact:

James Graybill James.Graybill@odva.ok.gov

EXHIBIT B

PTSA

The chemical pump has been adjusted. I will continue to monitor this and make adjustments as needed.

BAC Closed System Online We were told that chemistry was previously added and leaks presented themselves. GWT will not add any chemistry until we are told to do so. Corrosion of the system piping will continue without chemical protection.

Reymsa Cooling Tower Online This tower was within range for proper scale and corrosion control.

Reymsa Closed Loop Online We were told that chemistry was previously added and leaks presented themselves. GWT will not add any chemistry until we are told to do so. Corrosion of the system piping will continue without chemical protection.

Closing Comment Thank you for reading through today's report. If you have any questions or concerns, please feel free to reach out to me.

Thank you, Grayson Lavin - Senior Analyst, Water & Energy Services Glavin@gwt-inc.com

(281) 731-0650

Service Report February Monthly Service

Thursday, February 27, 2025 5:48 PM CST

Oklahoma Veterans Centers Clinton Veterans Center 1701 S. 4th Clinton Oklahoma 73601

(808) 469-8856

Report Number: 199367 Recorded By: Grayson Lavin

(708) 349-9991 glavin@gwt-inc.com

Clinton Veterans Center - Cooling and Loop

The above recommendations are designed to minimize risk and maximize efficiency. Failure to adhere to recommendations may put your system and facility at an increased risk of contamination, corrosion, scaling or system failure. Notify your rep of any current or upcoming system changes. GWT advises facilities falling under the scope of ASHRAE Standard 188-2015 and subsequent revisions to assemble a compliant water management program including proactive biological testing (Legionella).

Global Water Technology, Inc. - 354 West Armory Drive, South Holland IL 60473 (708) 349-9991

Tower Reymsa Closed

Loop

Conductivity (as mmhos) 1187 1985 1900 - 2000

1900 - 2000

889 1929 1900 - 2000

Conductivity Controller 1893 Record

Record

Record pH 7.88

8.59 8 - 9.2

8.53 8 - 9.2

8.8 8 - 8.8

8.36 8 - 9.2

8.68 8 - 8.8

Alkalinity, P (ppm as CaCO3) 0 Record

Record

Record

Alkalinity, M (ppm as CaCO3) 160 380 650 max

650 max

Chlorides as Cl- 60 100

Record

Hardness, total (ppm as CaCO3) 240 520 1000 max

1000 max

PTSA 60

70 min

70 min

59.7

Nitrite (ppm as NO2) 0 500 min

500 min

Hardness Cycles (Calculated)

2.2

2.25 - 3.75

2.0

2.25 - 3.75

1.7

2.25 - 3.75

Chloride Cycles (Calculated)

1.7

2.25 - 3.75

1.3

2.25 - 3.75

1.3

Iron (ppm as Fe) 0.81

0.2 max

0.68

0.2 max

Make Up Online The makeup will be tested each service visit to determine is adjustments to the water treatment programs are required.

BAC Tower 1 Online Tower one was low on scale inhibitor. The chemical pump has been adjusted to feed more inhibitor.

PTSA

The chemical pump has been adjusted. I will continue to monitor this and make more adjustments as needed.

BAC Tower 2 Online This cooling tower system was within range for proper scale and corrosion protection.

BAC Closed System Online We were told that chemistry was previously added and leaks presented themselves. GWT will not add any

Service Report March Monthly Service

Friday, March 14, 2025 2:08 PM CDT

Oklahoma Veterans Centers Clinton Veterans Center 1701 S. 4th Clinton Oklahoma 73601

(808) 469-8856

Report Number: 203107 Recorded By: Grayson Lavin

(708) 349-9991 glavin@gwt-inc.com

Clinton Veterans Center - Cooling and Loop chemistry until we are told to do so. Corrosion of the system piping will continue without chemical protection.

Reymsa Cooling Tower Online This tower out of range for proper scale and corrosion control.

PTSA

We increased the feed rate on the inhibitor chemical pump. We will continue to monitor this and make adjustments as needed.

Reymsa Closed Loop Online We were told that chemistry was previously added and leaks presented themselves. GWT will not add any chemistry until we are told to do so. Corrosion of the system piping will continue without chemical protection.

Closing Comment Thank you for reading through today's report. If you have any questions or concerns, please feel free to reach out to me.

Thank you, Grayson Lavin - Senior Analyst, Water & Energy Services Glavin@gwt-inc.com

(281) 731-0650

Service Report March Monthly Service

Friday, March 14, 2025 2:08 PM CDT

Oklahoma Veterans Centers Clinton Veterans Center 1701 S. 4th Clinton Oklahoma 73601

(808) 469-8856

Report Number: 203107 Recorded By: Grayson Lavin

(708) 349-9991 glavin@gwt-inc.com

Clinton Veterans Center - Cooling and Loop

The above recommendations are designed to minimize risk and maximize efficiency. Failure to adhere to recommendations may put your system and facility at an increased risk of contamination, corrosion, scaling or system failure. Notify your rep of any current or upcoming system changes. GWT advises facilities falling under the scope of ASHRAE Standard 188-2015 and subsequent revisions to assemble a compliant water management program including proactive biological testing (Legionella).

Tower Reymsa Closed

Loop

Conductivity (as mmhos) 982 1999 1900 - 2000

1900 - 2000

794 1967 1900 - 2000 pH 7.93 Record

8.81 8 - 9.2

8.66 8 - 9.2

8.72 8 - 8.8

8.84 8 - 9.2

8.46 8 - 8.8

Alkalinity, P (ppm as CaCO3) 0 Record

Record

Record

Alkalinity, M (ppm as CaCO3) 160 360

650 max

Chlorides as Cl- 60 70

Hardness, total (ppm as CaCO3) 200 550

1000 max

PTSA 26

70 min

Hardness Cycles

2.8

2.25 - 3.75

2.5

2.25 - 3.75

1.9

Chloride Cycles

1.2

2.25 - 3.75

1.0

Iron (ppm as Fe) 0.89

0.2 max

0.72

0.2 max

Make Up Online The makeup will be tested each service visit to determine is adjustments to the water treatment programs are required.

BAC Tower 1 Online Tower 1 is low on inhibitor. I will order chemical to replace the existing inhibitor.

BAC Tower 2 Online Tower 2 is low on inhibitor. I will order chemical to replace the existing inhibitor.

BAC Closed System Online We were told that chemistry was previously added and leaks presented themselves. GWT will not add any chemistry until we are told to do so. Corrosion of the system piping will continue without chemical protection.

Reymsa Cooling Tower Online This tower out of range for proper scale and corrosion control. I primed the pump and adjusted the feed rate. I will continue to monitor this and make adjustments as needed.

Service Report April Monthly Service

Friday, April 18, 2025 7:32 AM CDT

Oklahoma Veterans Centers Clinton Veterans Center 1701 S. 4th Clinton Oklahoma 73601

(808) 469-8856

Report Number: 212939 Recorded By: Grayson Lavin

(708) 349-9991 glavin@gwt-inc.com

Clinton Veterans Center - Cooling and Loop

Reymsa Closed Loop Online We were told that chemistry was previously added and leaks presented themselves. GWT will not add any chemistry until we are told to do so. Corrosion of the system piping will continue without chemical protection.

Closing Comment Thank you for reading through today's report. If you have any questions or concerns, please feel free to reach out to me.

Best regards, Grayson Lavin - Senior Analyst, Water & Energy Services Glavin@gwt-inc.com

(281) 731-0650

Service Report April Monthly Service

Friday, April 18, 2025 7:32 AM CDT

Oklahoma Veterans Centers Clinton Veterans Center 1701 S. 4th Clinton Oklahoma 73601

(808) 469-8856

Report Number: 212939 Recorded By: Grayson Lavin

(708) 349-9991 glavin@gwt-inc.com

Clinton Veterans Center - Cooling and Loop

The above recommendations are designed to minimize risk and maximize efficiency. Failure to adhere to recommendations may put your system and facility at an increased risk of contamination, corrosion, scaling or system failure. Notify your rep of any current or upcoming system changes. GWT advises facilities falling under the scope of ASHRAE Standard 188-2015 and subsequent revisions to assemble a compliant water management program including proactive biological testing (Legionella).

File details come from the government source that posted it. Updated .