Exhibit_B-_Bid_Form.pdf
PDF 550 KB Posted
- Solicitation number
- CC-7045-26/HSM
- Issued by
- Seminole County, Florida
About this file
This is a Bid Form (Exhibit B) for the Seminole County Board of County Commissioners' Invitation for Bid (IFB) Project CC-7045-26/HSM for Lockwood Boulevard Force Main and Reclaim Water Main Construction in Sanford, Florida. The project encompasses the furnishing and installation of approximately 5,502 linear feet of new water and sewer infrastructure, including 10-inch PVC and HDPE force main piping (3,786 linear feet total) and 12-inch PVC and HDPE reclaimed water main piping (1,716 linear feet total), along with associated valves, fittings, appurtenances, and site work. Installation will occur through open-cut trenching along an easement between Hagerty High School and West Bourne Drive residences and horizontal directional drilling along Lockwood Boulevard to the Carillon Master Pump Station. Additional scope items include asphalt and concrete removal and replacement (1,510 square yards of asphalt, 20 square yards of concrete sidewalk, 55 square yards of concrete driveway, and 26 linear feet of curb and gutter), landscape restoration and sodding (41,859 square feet), temporary traffic control, off-duty uniformed police officer services (15 days), clearing and tree removal (30 trees), tree replacement (30 trees), and pre- and post-construction documentation. Mandatory pre-proposal meeting attendance is required on February 20, 2026 at 9:00 AM at Carillon Community Park in Oviedo, Florida, with electronic bids due by March 18, 2026 at 2:00 PM through https://secure.procurenow.com/portal/seminolefl. Substantial completion is required within 150 calendar days and final completion within 180 days thereafter, with liquidated damages of $250.00 per day for delays beyond substantial completion and $62.50 per day for delays beyond final completion.
The contract will be awarded on a fixed lump-sum basis to the lowest responsive and responsible bidder, with an engineer's estimate of $2,600,000. Bidders must submit bid security equal to five percent of the total bid amount in the form of a certified check, cashier's check, or bid bond. Upon award, the successful contractor must execute a Performance Bond, Payment Bond, and one-year Warranty Bond from surety companies authorized by the U.S. Treasury Department and Florida. Contractors must be fully licensed and certified in Florida, comply with Chapter 440 Workers' Compensation requirements, and perform at least 51 percent of total work measured by equipment and labor costs within their own organization. Comprehensive insurance requirements include Workers' Compensation with statutory limits and $1,000,000 employers' liability coverage, Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate, Business Automobile Liability of $1,000,000 combined single limit, Excess/Umbrella Liability of $2,000,000 per occurrence, Pollution Liability of $1,000,000 per occurrence/$2,000,000 aggregate, and Professional Liability of $1,000,000 per claim/$2,000,000 aggregate. Minority and Women-Owned Business Enterprises (M/WBEs) are encouraged to participate. Contractors must comply with E-Verify employment verification requirements and all federal requirements if the project is funded through FEMA disaster relief grants, including Davis-Bacon and prevailing wage standards. Bids will remain firm for 90 days following bid opening, and the County reserves the right to reject any or all bids.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Description Quantity Unit Unit Price Cost 1 Mobilization and Demobilization (10% of Item No. 6 -27) 1 LS
2 General Conditions (5% of Item No. 6 -27) 1 LS
3 Pre and Post Construction Color Audio-Visual Documentation 1 LS
4 Temporary Traffic Control 1 LS
5 Off-Duty Uniformed Police Officer 15 DY
6 Asphalt Removal and Replacement 1,510 SY
7 Concrete Sidewalk Removal and Replacement 20 SY
8 Concrete Driveway Removal and Replacement 55 SY
9 Concrete Curb and Gutter Replacement 26 LF
10 Landscape Restoration, Sodding and Hedges 41,859 SF
11 10-inch PVC Force Main- Open Cut 1,989 LF
12 10-inch HDPE Force Main - HDD 1,797 LF 13 12-inch PVC Reclaimed Water - Open Cut 1,504 LF 14 12-inch HDPE Reclaimed Water - HDD 212 LF 15 Connection to Existing Wet Well - Lockwood Blvd 1 EA
16 10-inch Plug Valve (F&I) 9 EA
17 10-inch Gate Valve (F&I) 1 EA
18 12-inch Gate Valve (F&I) 1 EA
19 8-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA
20 12-inch x 10-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA 21 24-inch x 12-inch Tapping Sleeve and Tapping Valve (F&I) 1 EA 22 Automatic Air/Vacuum Release Valve Assembly (F&I) 7 EA 23 Grading 1 LS 24 Wetwell Top Slab Replacement 1 LS 25 Field Locates at Point of Connections 2 EA 26 Clearing and Tree Removal 30 EA 27 Tree Replacement 30 EA
Total Construction Cost - BASE BID
Seminole County Lockwood Blvd Force Main Design
Bid Form March 2026
EXHIBIT B
Bid Form
| Unit PriceLS: |
| CostLS: |
| Unit PriceLS_2: |
| CostLS_2: |
| Unit PriceLS_3: |
| CostLS_3: |
| Unit PriceLS_4: |
| CostLS_4: |
| Unit PriceDY: |
| CostDY: |
| Unit PriceSY: |
| CostSY: |
| Unit PriceSY_2: |
| CostSY_2: |
| Unit PriceSY_3: |
| CostSY_3: |
| Unit PriceLF: |
| CostLF: |
| Unit PriceSF: |
| CostSF: |
| Unit PriceLF_2: |
| CostLF_2: |
| Unit PriceLF_3: |
| CostLF_3: |
| Unit PriceLF_4: |
| CostLF_4: |
| Unit PriceLF_5: |
| CostLF_5: |
| Unit PriceEA: |
| CostEA: |
| Unit PriceEA_2: |
| CostEA_2: |
| Unit PriceEA_3: |
| CostEA_3: |
| Unit PriceEA_4: |
| CostEA_4: |
| Unit PriceEA_5: |
| CostEA_5: |
| Unit PriceEA_6: |
| CostEA_6: |
| Unit PriceEA_7: |
| CostEA_7: |
| Unit PriceEA_8: |
| CostEA_8: |
| Unit PriceLS_5: |
| CostLS_5: |
| Unit PriceLS_6: |
| CostLS_6: |
| Unit PriceEA_9: |
| CostEA_9: |
| Unit PriceEA_10: |
| CostEA_10: |
| Unit PriceEA_11: |
| CostEA_11: |
| CostTotal Construction Cost BASE BID: |
File details come from the government source that posted it. Updated .