Exhibit A2_Prelim Scope Summary.pdf
PDF 64 KB Posted
- Attached to
- Roofing Architect/Consulting Services
- Solicitation number
- 2526 009
- Issued by
- Mesa County, Colorado
About this file
This document is Exhibit A2 - Preliminary Scope Summary for a roofing system installation project across multiple school district buildings. The scope of work involves installing new roofing systems on sixteen buildings, with varying replacement percentages ranging from 25% to 100% of total square footage. The project encompasses elementary and middle school buildings, totaling 660,761 square feet of roofing. Of the sixteen buildings, four have existing solar systems (Dual Immersion Academy Main Building, Rocky Mountain Elementary, Bookcliff Middle School Main Building), while the remaining twelve do not have solar installations.
The buildings range in size from 8,631 square feet (Appleton Main Building) to 107,328 square feet (Bookcliff Middle School Main Building), with most schools requiring 100% roof replacement. The project involves partial roof replacements for some buildings, including Dual Immersion Academy Main Building (50%), Dual Immersion Academy Riverside East (25%), Orchard Ave Elementary (25%), Appleton Main Building (35%), and Fruitvale Elementary (45%). The comprehensive scope suggests a district-wide infrastructure improvement initiative focused on upgrading and maintaining school facility roofing systems, with careful consideration of existing solar installations.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A2 – PRELIMINARY SCOPE SUMMARY
PRELIMINARY SCOPE OF WORK
The scope of work consists of the installation of new roofing systems on sixteen (16) buildings throughout the District. The roofing systems are of different types and varying ages/conditions. For buildings with existing solar systems, see Exhibit A2.3 for solar system information. The approximate roofing square footage at each of the buildings is as follows:
BUILDING NAME APPROXIMATE
SQUARE FOOTAGE
PERCENTAGE OF
ROOF BEING
REPLACED
EXISTING
SOLAR
Dual Immersion Academy
– Main Building
17, 016 sf 50% of total SF Solar
Dual Immersion Academy
– Riverside East
8,964 sf 25% of total SF No Solar
Wingate Elementary 48,060 sf 100% No Solar
Orchard Ave Elementary 20,183 sf 25% of total SF No Solar
Appleton Main Building 8,631 sf 35% of total SF No Solar
Fruitvale Elementary 25,454 sf 45% of total SF No Solar
Shelledy Elementary 58,386 sf 100% No Solar
Taylor Elementary 48,264 sf 100% No Solar
Rimrock Elementary 56,200 sf 100% No Solar
Rocky Mountain Elementary
51,624 sf 100% Solar
Mesa View Elementary 47,323 sf 100% No Solar
Loma Elementary 33,474 sf 100% No Solar
Pear Park Elementary 63,555 sf 100% No Solar
Bookcliff Middle School – Main Building
107,328 sf 100% Solar
Bookcliff Middle School – DIA Main Building
9,602 sf 100% No Solar
Thunder Mountain Elementary
56,697 sf 100% No Solar
TOTAL 660,761SF