Exhibit A2_Prelim Scope Summary.pdf

PDF 64 KB Posted

Attached to
Roofing Architect/Consulting Services
Solicitation number
2526 009
Issued by
Mesa County, Colorado

About this file

This document is Exhibit A2 - Preliminary Scope Summary for a roofing system installation project across multiple school district buildings. The scope of work involves installing new roofing systems on sixteen buildings, with varying replacement percentages ranging from 25% to 100% of total square footage. The project encompasses elementary and middle school buildings, totaling 660,761 square feet of roofing. Of the sixteen buildings, four have existing solar systems (Dual Immersion Academy Main Building, Rocky Mountain Elementary, Bookcliff Middle School Main Building), while the remaining twelve do not have solar installations.

The buildings range in size from 8,631 square feet (Appleton Main Building) to 107,328 square feet (Bookcliff Middle School Main Building), with most schools requiring 100% roof replacement. The project involves partial roof replacements for some buildings, including Dual Immersion Academy Main Building (50%), Dual Immersion Academy Riverside East (25%), Orchard Ave Elementary (25%), Appleton Main Building (35%), and Fruitvale Elementary (45%). The comprehensive scope suggests a district-wide infrastructure improvement initiative focused on upgrading and maintaining school facility roofing systems, with careful consideration of existing solar installations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A2 – PRELIMINARY SCOPE SUMMARY

PRELIMINARY SCOPE OF WORK

The scope of work consists of the installation of new roofing systems on sixteen (16) buildings throughout the District. The roofing systems are of different types and varying ages/conditions. For buildings with existing solar systems, see Exhibit A2.3 for solar system information. The approximate roofing square footage at each of the buildings is as follows:

BUILDING NAME APPROXIMATE

SQUARE FOOTAGE

PERCENTAGE OF

ROOF BEING

REPLACED

EXISTING

SOLAR

Dual Immersion Academy

– Main Building

17, 016 sf 50% of total SF Solar

Dual Immersion Academy

– Riverside East

8,964 sf 25% of total SF No Solar

Wingate Elementary 48,060 sf 100% No Solar

Orchard Ave Elementary 20,183 sf 25% of total SF No Solar

Appleton Main Building 8,631 sf 35% of total SF No Solar

Fruitvale Elementary 25,454 sf 45% of total SF No Solar

Shelledy Elementary 58,386 sf 100% No Solar

Taylor Elementary 48,264 sf 100% No Solar

Rimrock Elementary 56,200 sf 100% No Solar

Rocky Mountain Elementary

51,624 sf 100% Solar

Mesa View Elementary 47,323 sf 100% No Solar

Loma Elementary 33,474 sf 100% No Solar

Pear Park Elementary 63,555 sf 100% No Solar

Bookcliff Middle School – Main Building

107,328 sf 100% Solar

Bookcliff Middle School – DIA Main Building

9,602 sf 100% No Solar

Thunder Mountain Elementary

56,697 sf 100% No Solar

TOTAL 660,761SF

File details come from the government source that posted it. Updated .