Exhibit_A-SOW.pdf
PDF 68 KB Posted
- Attached to
- AUTOMATIC SLIDING DOOR PROJECT - PR259012
- Solicitation number
- 0000035709
- Issued by
- Tulare County, California
About this file
This Scope of Work (SOW) document is for the Porterville Developmental Center's Automatic Sliding Door Project (PR2), detailing a comprehensive door replacement initiative. The project involves removing and replacing 6 existing sliding door systems located in various areas of the Administration building and east wing, including the main lobby, administrative areas, Room 41 hallway, and second-floor locations. The new door systems will feature motion sensor openers, key card HID reader access, panic lock down capabilities integrated with the PBX office, flush panic hardware, and clear tempered glass. Each door system will be heavy-duty, designed for continuous day and night operation, and include a key-controlled power switch to disarm and power down the doors.
The contractor will be required to perform work with minimal disruption to facility staff, maintaining strict safety protocols and compliance with industrial safety regulations. The State will be the sole judge of work acceptability, with any unacceptable work requiring immediate correction at the contractor's expense. Contractors must maintain an active telephone line, report to Plant Operations for badge verification, and adhere to specific operational guidelines, including removing any personnel deemed incompetent or disorderly by the Project Representative. The project emphasizes workplace safety, minimal facility routine interference, and professional conduct throughout the door replacement process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Automatic_Sliding_Door_Project.pdf | ||
| Exhibit_B-Budget.pdf | ||
| HIPAA_Business_Associate_Assurances_FINAL_2017_12.pdf | ||
| PM423.pdf | ||
| Sexual_Harassment.pdf | ||
| Exhibit_D_IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Automatic Sliding Door Project
PR2
Exhibit A
SCOPE OF WORK
1. General Scope
Contractor to provide all materials, tools, and labor to remove and replace 6 existing sliding door system with active leaf breakout located in the Administration building and second floor east wing. Sliding doors to be replaced with same size of sliding and stationary side light door system and depth of frame. Door system to include motion sensor opener on interior of door to exit room or building, exterior opener will be tied into existing key card HID reader to open doors. Panic lock down is required to be tied into the PBX office and will lock all exterior doors installed. ALL rollers and mechanical hardware will be heavy duty and made to withstand working day and night operation. Door system to include flush panic hardware for emergency exiting and a key controlled power switch to disarm and power down door. Glass should be clear tempered glass.
2. Project Representative
The Project Representative during the term of the Agreement will be:
Porterville Developmental Center Name Phone Email
Vendor/Contractor Name Phone Email
3. Contractor Requirements
Contractor shall maintain an active telephone to be contacted by the PDC Project Representative between the hours of 8:00 a.m. and 4:00 p.m., Monday through Friday. The technician must report to Plant Operations to sign in to be given an I.D. badge that must be always worn while performing services. The PDC Project Representative shall inform the Contractor of any necessary problems by telephone.
4. Work Area Safety
All work is to be performed in areas used daily by facility staff. Contractor will take suitable measures to control all material and equipment to produce a
Automatic Sliding Door Project
PR2
minimum of interference in facility routine. All work shall be performed in a safe and prudent manner.
5. Acceptance
Completed work will be to the entire satisfaction of the State and the State shall be the sole judge as to its acceptability. Any work not acceptable to the State, shall be immediately, at Contractor’s own expense, refashioned to an acceptable level.
6. Accident Prevention
Precaution shall be always exercised for the protection of persons (including employees) and property. These shall include, but not be limited to, the installation of adequate safety guards and protective devices for all equipment and machinery, whether used in the performance of work or permanently installed as part of the work. Contractor shall comply with all applicable laws relating to safety precautions, including the safety regulations of the Division of Industrial Safety, Department of Industrial Regulations of the state.
7. Worksite Operations
Contractor shall so perform all work as to offer the least possible obstruction and inconvenience to staff and shall have under construction no greater amount of work than can be completed promptly and properly with due regard to the rights of staff and the public. Any person the PDC Project Representative may deem incompetent or disorderly shall be promptly removed from the facility and not be allowed to return for the duration of the agreement.
8. Door Locations
1. East and west side of main lobby – 2 sliding door systems
2. Middle of Admin East side near lab – 1 sliding door system
3. Room 41 hallway – 1 sliding door system
4. Middle, west side of Admin near QA department – 1 sliding door system
5. Entry to Unit A/B building – 1 sliding door system
6. Second floor of Admin, E2 wing – 1 sliding door system