Exhibit A - Portable and Fixed Gas Detector List.pdf
PDF 409 KB Posted
- Solicitation number
- RFP-2024-24041
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Statement of Work for on-site calibration and testing of approximately 315 portable and fixed gas detectors at the National Renewable Energy Laboratory (NREL) facilities. The Subcontractor shall perform zero and span calibrations per the manufacturer's instructions, use certified traceable test gas, and label all gas detectors with the inspection date. The Subcontractor shall provide reports within 10 business days detailing the inspection results, any deficiencies identified, and recommendations for corrective actions. The Subcontractor must respond to service requests within 24 hours, complete standard repairs/testing within 10 business days, and shall not exceed the stated contingency funding. The work must be performed in accordance with NREL's environmental, safety, health, and quality requirements. The services will be provided at NREL's South Table Mountain campus in Colorado.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
STATEMENT OF WORK
FOR
On-site Calibration and Testing for Fixed/Portable Gas Detectors
Revision 0
July 31st, 2024
1) Background:
The National Renewable Energy Laboratory (NREL) is a national laboratory owned by the U.S. Department of Energy (DOE). NREL is the only federal laboratory dedicated to research, development, commercialization, and deployment of renewable energy and energy efficiency technologies. NREL is managed and operated for DOE’s Office of Energy Efficiency and Renewable Energy by The Alliance for Sustainable Energy (Alliance), the “M&O Contractor”.
NREL takes pride in its world-class research, talented staff, sustainable campus, and results that positively impact our local, national and global communities. On the NREL sites there are state-of-the-art facilities available to industry entrepreneurs, engineers, scientists, and universities for researching and developing their energy technologies. The National Renewable Energy Laboratory (NREL) consists of three campuses in Colorado, with 65+ buildings that range in age from new construction to 40+ years old. NREL appoints internal Facility Managers to manage multiple buildings throughout all campuses.
The Subcontractor shall provide all personnel, labor, management, tools, equipment, and services necessary to ensure that NREL’s fixed and portable gas detectors are tested and calibrated. The Subcontractor shall ensure that all objectives outlined in this Appendix A – Statement of Work are met in a timely and professional manner.
Many services performed by Subcontractors on-site at NREL are applicable to Service Contract Labor Standards Wage Determinations. Subcontractor shall reference the executed Subcontract Schedule or Purchase Order to confirm SCLS applicability.
2) Description of Work:
a) Variable Services: As-Needed Testing and Calibration
1. Per the manufacturer’s recommendations, perform on-site calibration and testing of approximately 315 portable and fixed gas detectors.
i. Perform Zero calibration per the manufacturer's instructions
ii. Perform Span calibration per the manufacturer's instructions
2. Only use a certified traceable test gas and ensure the test gas is not expired.
Subcontractor shall provide a certificate of analysis for every test gas cylinder.
3. To the extent possible, Subcontractor shall calibrate sensors in environmental conditions that are the same as (or similar to) the actual workplace conditions.
4. Label all gas detectors with the date of inspection.
5. Provide reports within 10 business days of completion of testing/calibration. Reports shall include the following:
i. Record results of all inspections. Include the building, room number, detector type, pass/fail, inspection dates, comments.
ii. Inform NREL TM of all deficiencies identified.
iii. Provide NREL TM with recommendations for corrective actions.
6. Standard Request response time shall be within 24 hours to acknowledge the NREL TM request for service.
i. Initial assessment report and quote to be provided to NREL’s TM within 5 business days of initial request unless otherwise noted by the Technical Monitor.
ii. Repair or testing shall be completed within 10 business days of requested standard as-needed service.
7. The Subcontractor shall not exceed the stated contingency funding as outlined in the Subcontract or Purchase Order.
i. In the event that estimated repairs, parts, or a combination of both meet or exceed 85% of the contingency funding on the Subcontract – the Subcontractor shall notify both the NREL TM and NREL SA of such when providing the quote for those services and parts (within 48 hours of initial request).
ii. Additional funds cannot be awarded without the review and concurrence of the NREL SA listed in the Subcontract.
b) Personnel Requirements
1. Subcontractor Employees (All Staff):
i. All Subcontractor employees shall be trained in and provide current training records on the following:
a. OSHA
ii. The Subcontractor must assure that the employees/subcontractors have sufficient English language speaking skills and/or interpretive services available to successfully communicate with the NREL TM at each site.
2. Supervisor
i. The Subcontractor shall assign at least two (one primary and one backup)
Supervisor with all contact information to be provided to the NREL TM in writing prior to the execution of the Subcontract or within 48 hours of any personnel change via written notice to NREL TM.
ii. Regular employees do NOT qualify as backups for on-site supervisors.
c) Exhibits
1. Exhibit A – Fixed and Portable Gas Detectors
3) NREL Points of Contact:
a) NREL Technical Monitor (TM)
1. The Primary TM for this requirement is Elizabeth Latino, Elizabeth.Latino@nrel.gov,
(303) 598-9745
2. The Secondary TM for this requirement is Matthew Lynch, Matthew.Lynch@nrel.gov,
(303) 598-2772
3. The Primary Subject Matter Expert (SME) for this requirement is Joshua Korosec, Joshua.Korosec@nrel.gov, (303) 598-2795
4. The Secondary SME for this requirement is Michael Wodzianski, Michael.Wodzianski@nrel.gov, (303) 264-4591
5. The Subcontractor is responsible for coordinating all questions, problems, or operational technical matters of this subcontract with the NREL TM.
mailto:Elizabeth.Latino@nrel.gov mailto:Matthew.Lynch@nrel.gov mailto:Joshua.Korosec@nrel.gov mailto:Michael.Wodzianski@nrel.gov
6. In the event the NREL TM is not available at the time of the request, operational questions can be directed to the NREL Work Control Center (WCC) at (303) 384- 7344.
b) Standard Performance Scheduling
1. The point of contact for scheduling on this subcontract is NREL WCC at (303) 384-
7344.
c) NREL ESH&Q Point of Contact(s):
1. The Primary ESH&Q Point of Contact for this requirement is Steve Aldridge, Steven.Aldridge@nrel.gov, (720) 490-0064.
2. The Secondary ESH&Q Point of Contact for this requirement is John Boysen, John.Boysen@nrel.gov, (720) 641-1107.
d) NREL Subcontract Administrator (SA)
1. Contractual questions shall be directed to the SA listed in the Subcontract Schedule or Purchase Order.
4) Environmental, Safety, Health, and Quality (ESH&Q) & Security:
a) All Subcontractor employees are to wear a NREL identification badge on their outer garment, upper portion of their body at all times while on the premises.
1. Subcontractors will not be allowed on site without badges.
2. All issued badges must be returned immediately to the Site Entrance Building upon termination of the work at NREL.
b) The Subcontractor shall comply with all safety requirements at the following website:
https://www.nrel.gov/about/ehs-construction.html
i. At a minimum, the Service and Maintenance Subcontractor Environment, Safety &
Health Manual is applicable to this SOW.
ii. The Subcontractor shall submit an Environmental, Safety, and Health Risk
Evaluation Worksheet.
iii. The Subcontractor shall provide proper personal protection equipment.
iv. The Subcontractor shall attend a NREL Contractor Safety Orientation meeting with a
NREL Environmental Safety, Health, and Quality (ESH&Q) representative.
5) Working Hours:
NREL regular business hours are 7:00am to 5:00pm., Monday through Friday except NREL recognized holidays. The Subcontractor personnel scheduled to work during non-working hours must notify the NREL TM prior to the start of work to ensure the Site Entrance Building has knowledge of the Subcontractor coming on-site after-hours.
Emergency or as-needed repairs and testing will be available during normal business hours from 7:00 a.m. through 5:00 p.m., Monday through Friday, except NREL recognized holidays.
The days designated as NREL holidays (i.e., New Year’s Day, Martin Luther King Jr. Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Thanksgiving Day, Day after Thanksgiving, and Christmas Day) are not NREL workdays. If a NREL holiday falls on a mailto:Steven.Aldridge@nrel.gov mailto:John.Boysen@nrel.gov https://www.nrel.gov/about/ehs-construction.html
Saturday or Sunday, the preceding Friday or the following Monday may not be a NREL workday. The Friday after Thanksgiving is not a NREL workday.
6) Locations:
a) The Subcontractor shall perform services outlined in this Appendix A – Statement of
Work at the following locations. Future locations may be added or removed via mutually agreed to Subcontract modification completed by the NREL Subcontract Administrator.
1. South Table Mountain Site (STM), 15013 Denver West Pkwy, Golden, CO 80401.
i. ESIF, 15257 Denver West Parkway, Golden, CO 80401. (LEED Platinum)
ii. S&TF, 15253 Denver West Parkway, Golden, CO 80401. (LEED Platinum)
iii. RSF, 15301 Denver West Parkway, Golden, CO 80401. (LEED Platinum)
iv. SERF, 15313 Denver West Parkway, Golden, CO 80401.
v. FTLB, 15523 Denver West Parkway, Golden, CO 80401.
vi. OTF, 15883 Denver West Parkway, Golden, CO 80401.
vii. TTF, 15973 Denver West Parkway, Golden, CO 80401.
viii. IBRF, 16173 Denver West Parkway, Golden, CO 80401. (LEED Gold)
ix. Shipping/Receiving Building, 16253 Denver West Parkway, Golden, CO 80401.
x. ADD ALTERNATE: EMAPS, TBD
xi. ADD ALTERNATE: RAIL, 15503 Denver West Parkway, Golden CO 80401.
xii. ADD ALTERNATE: New Waste Handling Facility
b) Please reference the maps located on the NREL website links below. See Technical Monitor for additional information on locations as necessary.
1. Golden STM Campus: https://www.nrel.gov/about/golden.html
7) Glossary:
a) Definitions:
1. As-Needed – Any service required beyond the regularly scheduled tasks to ensure performance standards are met. May be at the request of the NREL Technical Monitor (TM) or On-Site Supervisor based on each individual situation encountered.
2. NREL – National Renewable Energy Laboratory
3. SOW – Statement of Work
4. TM – Technical Monitor
5. SA – Subcontract Administrator
6. SCLS – Service Contract Labor Standards
7. Toxic Gas - any gas that has a median lethal concentration (LC50) in air of more than 200 ppm but not more than 2000 ppm by volume of gas vapor, or more than 2 mg/L but not more than 20 mg/L of mist, fume, or dust
b) Location Acronyms:
1. STM – South Table Mountain Campus
i. EMAPS – Energy Materials and Processing at Scale Facility
ii. ESIF – Energy Systems Integration Facility
iii. FTLB – Field Test Laboratory Building
iv. IBRF – Integrated Biorefinery Research Facility
v. OTF – Outdoor Test Facility https://www.nrel.gov/about/golden.html
vi. RAIL – Research and Innovation Laboratory
vii. RSF – Research Support Facility
viii. S&TF – Science & Technology Facility
ix. SERF – Solar Energy Research Facility
x. TTF – Thermal Test Facility
xi. WHF – Waste Handling Facility
NREL SITE OPERATIONS Work order No.
Service work sheet for STATIONARY (FIXED) (F) gas detection Date:
Technician(s):
FTLB Building Technician(s):
SNSR ## Sensor Type Sensor Make Sensor Model Sensor Location Calibration Gas and Concentration
Calibration Gas Flow Rate
Pass / Fail Calibration Date / Comments
DAR
101-01 Hydrogen Cyanide OLDHAM iTRANS 2 101 S POD HCN 10 PPM 0.5 LPM pass 3/1/2024 James Stunkel
101-02 Ammonia OLDHAM iTRANS 2 101 S POD NH3 50 PPM 1 LPM pass 3/1/2024 James Stunkel
101-03 LEL/CH4 OLDHAM iTRANS 2 101 S POD H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 James Stunkel
101-04 Nitrogen Dioxide OLDHAM iTRANS 2 101 S POD NO2 5PPM 0.5 LPM pass 3/1/2024 James Stunkel
101-05 Carbon Monoxide OLDHAM iTRANS 2 101 S POD CO 100 PPM 0.5 LPM pass 3/1/2024 James Stunkel
101-06 Nitrogen Dioxide OLDHAM iTRANS 2 101 N POD NO2 5PPM 0.5 LPM pass 3/1/2024 James Stunkel
101-07 Carbon Monoxide OLDHAM iTRANS 2 101 N POD CO 100 PPM 0.5 LPM pass 3/1/2024 James Stunkel
101-08 LEL/CH4 OLDHAM iTRANS 2 101 N POD H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 James Stunkel
101-09 Hydrogen Cyanide OLDHAM iTRANS 2 101 N POD HCN 10 PPM 0.5 LPM pass 3/1/2024 James Stunkel
101-10 Ammonia OLDHAM iTRANS 2 101 N POD NH3 50 PPM 1 LPM pass 3/1/2024 James Stunkel
101-11 LEL/H2 HONEYWELL XCD-RTD 101 BETWEEN PODS H2 500PPM 0.5LPM Not Testing 3/1/2024 James Stunkel
104A-01 Carbon Monoxide OLDHAM iTRANS 2 104A CO 100 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104A-02 Hydrogen Sulfide OLDHAM iTRANS 2 104A H2S 25 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104B-01 Carbon Monoxide OLDHAM iTRANS 2 104B CO 100 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104B-02 Hydrogen Sulfide OLDHAM iTRANS 2 104B H2S 25 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104B-03 LEL/C5H12 OLDHAM iTRANS 2 104B H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Kellene Orton
104B-04 LEL/CH4 OLDHAM iTRANS 2 104B H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Kellene Orton
104C-01 Carbon Monoxide OLDHAM iTRANS 2 104C CO 100 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104C-02 Hydrogen Sulfide OLDHAM iTRANS 2 104C H2S 25 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104C-03 LEL/C5H12 OLDHAM iTRANS 2 104C H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Kellene Orton
104C-04 Hydrogen Sulfide OLDHAM iTRANS 2 104C H2S 25 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104MEZ-01 LEL/C5H12 OLDHAM iTRANS 2 104M H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Kellene Orton
104MEZ-02 Carbon Monoxide OLDHAM iTRANS 2 104M CO 100 PPM 0.5 LPM pass 3/1/2024 Kellene Orton
104MEZ-03 LEL/CH4 OLDHAM iTRANS 2 104M H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Kellene Orton
105-01 Carbon Monoxide OLDHAM iTRANS 2 105 CO 100 PPM 0.5 LPM pass 3/1/2024 Jessica Olstad
105-02 LEL/CH4 OLDHAM iTRANS 2 105 H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Jessica Olstad
105-03 Hydrogen Sulfide OLDHAM iTRANS 2 105 H2S 25 PPM 0.5 LPM pass 3/1/2024 Jessica Olstad
105-04 Carbon Monoxide OLDHAM iTRANS 2 105 CO 100 PPM 0.5 LPM pass 3/1/2024 Jessica Olstad
Technician(s):
FTLB Building Technician(s):
SNSR ## Sensor Type Sensor Make Sensor Model Sensor Location Calibration Gas and Concentration
Calibration Gas Flow Rate
Pass / Fail Calibration Date / Comments
DAR
105-05 LEL/CH4 OLDHAM iTRANS 2 105 H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Jessica Olstad
105-06 Carbon Monoxide OLDHAM iTRANS 2 105 CO 100 PPM 0.5 LPM pass 3/1/2024 Jessica Olstad
105-07 LEL/CH4 OLDHAM iTRANS 2 105 H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Jessica Olstad
105-08 Carbon Monoxide OLDHAM iTRANS 2 105 CO 100 PPM 0.5 LPM pass 3/1/3024 Jessica Olstad
105-09 LEL/CH4 OLDHAM iTRANS 2 105 H2 2% VOL (50%LEL) 0.5 LPM pass 3/1/2024 Jessica Olstad
105-10 LEL/H2 HONEYWELL XCD-RTD 105 H2 500PPM 0.5LPM Not Testing Mar-24 Jessica Olstad
113-01 LEL/H2 HONEYWELL XCD-RTD 113 MANIFOLD H2 500PPM 0.5LPM Not Testing Mar-24 Jeremy Basard
113-02 Carbon Monoxide HONEYWELL XCD-RTD 113 AMBIENT CO 100 PPM 0.5LPM pass Mar-24 Jeremy Basard
113-03 Carbon Monoxide HONEYWELL XCD-RTD 113 MANIFOLD CO 100 PPM 0.5LPM pass Mar-24 Jeremy Basard
113-04 LEL/H2 HONEYWELL XCD-RTD 113 HOOD #1 H2 500PPM 0.5LPM Not testing Mar-24 Jeremy Basard
113-05 LEL/H2 HONEYWELL XCD-RTD 113 HOOD #2 H2 500PPM 0.5LPM Not testing Mar-24 Jeremy Basard
113-06 LEL/H2 HONEYWELL XCD-RTD 113 HOOD #3 H2 500PPM 0.5LPM not testing Mar-24 Jeremy Basard
113-07 LEL/H2 HONEYWELL XCD-RTD 113 ROLL-IN #1 H2 500PPM 0.5LPM not testing Mar-24 Jeremy Basard
113-08 LEL/H2 HONEYWELL XCD-RTD 113 ROLL-IN #2 H2 500PPM 0.5LPM not testing Mar-24 Jeremy Basard
113-09 Carbon Monoxide HONEYWELL XCD-RTD 113 HOOD #1 CO 100 PPM 0.5LPM pass Mar-24 Jeremy Basard
113-10 Carbon Monoxide HONEYWELL XCD-RTD 113 HOOD #2 CO 100 PPM 0.5LPM pass Mar-24 Jeremy Basard
113-11 Carbon Monoxide HONEYWELL XCD-RTD 113 HOOD #3 CO 100 PPM 0.5LPM pass Mar-24 Jeremy Basard
113-12 Carbon Monoxide HONEYWELL XCD-RTD 113 ROLL-IN #1 CO 100 PPM 0.5LPM pass Mar-24 Jeremy Basard
117-01 Oxygen ALPHA OMEGA 1000-R 117 O2 18% 0.5 LPM pass Mar-24 David Mulder
118-01-01 Oxygen ALPHA OMEGA 1000-R 118-01 O2 18% 0.5 LPM pass Mar-24 David Mulder
115- 01 Oxygen ALPHA OMEGA 1300 115 O2 18% 0.5 LPM Pass Mar-24 Jeremy Basard
119H-01 Oxygen ALPHA OMEGA 1000 119H O2 18% 0.5 LPM pass Mar-24 Josie
120-01 Oxygen ALPHA OMEGA 1300 120 O2 18% 0.5 LPM pass Mar-24 Bennett Addison
120-02 Oxygen Alpha Omega 1300 115 O2 18% 0.5 LPM Pass Mar-24 Bennett Addison
120-03 Oxygen ALPHA OMEGA 1300 120 O2 18% 0.5 LPM pass Mar-24 Bennett Addison
121-01 Carbon Monoxide HONEYWELL E3SA 121 CO 100 PPM 0.5 LPM pass Mar-24 Jianping Yu
121-02 LEL/H2 HONEYWELL E3SA 121 H2 2% VOL (50%LEL) 0.5 LPM pass Mar-24 Jianping Yu
121-03 LEL/H2 HONEYWELL XCD-RTD 121 H2 500PPM 0.5LPM Not Testing Mar-24 Jianping Yu
Technician(s):
FTLB Building Technician(s):
SNSR ## Sensor Type Sensor Make Sensor Model Sensor Location Calibration Gas and Concentration
Calibration Gas Flow Rate
Pass / Fail Calibration Date / Comments
DAR
121-04 Carbon Monoxide HONEYWELL XCD-RTD 121 CO 100 PPM 0.5LPM Pass Mar-24 Jianping Yu
127-01 Oxygen OLDHAM iTRANS 2 127 N 99.9% / O2 20.9% VOL 0.5 LPM Pass Mar-24 Matt Oliver
127-02 LEL/C5H12 OLDHAM iTRANS 2 127 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Matt Oliver
127-03 Hydrogen Sulfide OLDHAM iTRANS 2 127 H2S 25 PPM 0.5 LPM pass Mar-24 Matt Oliver
127-04 Carbon Monoxide OLDHAM iTRANS 2 127 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
127-05 Carbon Monoxide OLDHAM iTRANS 2 127 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
127-06 LEL/CH4 OLDHAM iTRANS 2 127 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Matt Oliver
131-01 Carbon Monoxide OLDHAM iTRANS 2 131 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
131-02 Carbon Monoxide OLDHAM iTRANS 2 131 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
131-03 Carbon Monoxide OLDHAM iTRANS 2 131 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
131-04 LEL/CH4 OLDHAM iTRANS 2 131 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Matt Oliver
131-05 Carbon Monoxide OLDHAM iTRANS 2 131 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
131-06 LEL/CH4 OLDHAM iTRANS 2 131 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Matt Oliver
131-07 LEV/C5H12 OLDHAM iTRANS 2 131 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Matt Oliver
131-08 Carbon Monoxide OLDHAM iTRANS 2 131 CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
131-09 LEL/H2 HONEYWELL XCD-RTD 131 (FOR LAB 127) H2 500PPM 0.5LPM Fail Mar-24 Matt Oliver
131MEZ-01 Carbon Monoxide OLDHAM iTRANS 2 131 MEZ CO 100 PPM 0.5 LPM Pass Mar-24 Matt Oliver
131MEZ-02 LEL/C5H12 OLDHAM iTRANS 2 131 MEZ H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Matt Oliver
131MEZ-03 Carbon Monoxide OLDHAM iTRANS 2 131 MEZ CO 100 PPM 0.5 LPM Pass 3/1/2024 Matt Oliver
131MEZ-04 LEL/C5H12 OLDHAM iTRANS 2 131 MEZ H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Matt Oliver
131MEZ-05 LEV/CH4 OLDHAM iTRANS 2 131 MEZ H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Matt Oliver
134-01 Oxygen ALPHA OMEGA 1000 134 O2 18% 0.5 LPM pass 3/1/2024 William Michener
150-01 Oxygen HONEYWELL E3SA 150 N 99.9% / O2 20.9% VOL 0.5 LPM Pass 3/1/2024 Steven Rowland
150-02 Carbon Monoxide OLDHAM iTRANS 2 150 CO 100 PPM 0.5 LPM Pass 3/1/2024 Steven Rowland
150-03 LEL/CH4 OLDHAM iTRANS 2 150 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Steven Rowland
150-04 LEL/H2 HONEYWELL MIDAS 150 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Steven Rowland
150-05 LEL/CH4 OLDHAM iTRANS 2 150 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Steven Rowland
150-06 LEL/H2 HONEYWELL XCD-RTD 150 H2 500PPM 0.5LPM Fail 3/1/2024 Steven Rowland
Technician(s):
FTLB Building Technician(s):
SNSR ## Sensor Type Sensor Make Sensor Model Sensor Location Calibration Gas and Concentration
Calibration Gas Flow Rate
Pass / Fail Calibration Date / Comments
DAR
150-07 Carbon Monoxide HONEYWELL XCD-RTD 150 CO 100 PPM 0.5LPM Pass 3/1/2024 Steven Rowland
155-01 Carbon Monoxide OLDHAM iTRANS 2 155 CO 100 PPM 0.5 LPM Pass 3/1/2024 Scott Palmer
155-02 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-03 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass Mar-24 Scott Palmer
155-04 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-05 Carbon Monoxide OLDHAM iTRANS 2 155 CO 100 PPM 0.5 LPM Pass 3/1/2024 Scott Palmer
155-06 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-07 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-08 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-09 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-10 LEL/CH4 OLDHAM iTRANS 2 155 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Scott Palmer
155-11 LEL/H2 HONEYWELL XCD-RTD 155 H2 500PPM 0.5LPM Fail 3/1/2024 Scott Palmer
173-01 LEL/H2 HONEYWELL E3SA 173 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Jianping Yu
173-02 Carbon Monoxide HONEYWELL E3SA 173 CO 100 PPM 0.5 LPM Pass 3/1/2024 Jianping Yu
175-01 LEL/H2 HONEYWELL E3SA 175 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 David Mulder
175-02 Carbon Monoxide HONEYWELL E3SA 175 CO 100 PPM 0.5 LPM Pass 3/1/2024 David Mulder
201-01 Carbon Monoxide OLDHAM iTRANS 2 201 CO 100 PPM 0.5 LPM Pass 3/1/2024 Matt Oliver
201-01 LEL/C5H12 OLDHAM iTRANS 2 201 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Matt Oliver
204-01 Oxygen HONEYWELL E3SA 204 N 99.9% / O2 20.9% VOL 0.5 LPM Pass 3/1/2024 Rianna Martinez
204-02 LEL/H2 HONEYWELL XCD-RTD 204 H2 500PPM 0.5 LPM Fail Rianna Martinez
204-03 LEL/H2 HONEYWELL XCD-RTD 204 H2 500PPM 0.5LPM Fail Rianna Martinez
205-01 Oxygen HONEYWELL E3SA 205 N 99.9% / O2 20.9% VOL 0.5 LPM Pass 3/1/2024 Vladimir Lunin
235-01 Carbon Monoxide HONEYWELL E3SA 235 CO 100 PPM 0.5 LPM Pass 3/1/2022 Wade Braunecker
235-02 LEL/H2 HONEYWELL E3SA 235 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Wade Braunecker
248-01 Carbon Monoxide HONEYWELL E3SA 248 CO 100 PPM 0.5 LPM Pass 3/1/2024 Wei Wang
248-02 LEL/H2 HONEYWELL E3SA 248 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Wei Wang
248-03 Carbon Monoxide HONEYWELL E3SA 248 CO 100 PPM 0.5 LPM Pass 3/1/2024 Wei Wang
248-04 LEL/H2 HONEYWELL E3SA 248 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Wei Wang
Technician(s):
FTLB Building Technician(s):
SNSR ## Sensor Type Sensor Make Sensor Model Sensor Location Calibration Gas and Concentration
Calibration Gas Flow Rate
Pass / Fail Calibration Date / Comments
DAR
251-01 Carbon Monoxide HONEYWELL E3SA 251 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-02 LEL/H2 HONEYWELL E3SA 251 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-03 Carbon Monoxide HONEYWELL E3SA 251 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-04 LEL/H2 HONEYWELL E3SA 251 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-05 Carbon Monoxide HONEYWELL E3SA 251 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-06 LEL/H2 HONEYWELL E3SA 251 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-07 Carbon Monoxide HONEYWELL E3SA 251 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-08 LEL/H2 HONEYWELL E3SA 251 H2 2% VOL (50%LEL) 0.5 LPM Not In Service 3/1/2024 Nicholas Katsiotis
251-09 Carbon Monoxide HONEYWELL E3SA 251 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-10 LEL/H2 HONEYWELL E3SA 251 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
251-11 LEL/H2 HONEYWELL XCD-RTD 251 H2 500PPM 0.5LPM Not testing 3/1/2024 Nicholas Katsiotis
252-01 Carbon Monoxide OLDHAM iTRANS 2 252 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
252-02 Ammonia OLDHAM iTRANS 2 252 NH3 50 PPM 1 LPM Pass 3/1/2024 Nicholas Katsiotis
252-03 Hydrogen Sulfide OLDHAM iTRANS 2 252 H2S 25 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
252-04 Carbon Monoxide HONEYWELL E3SA 252 CO 100 PPM 0.5 LPM Pass 3/1/2024 Nicholas Katsiotis
269-01 Hydrogen Sulfide OLDHAM iTRANS 2 269 H2S 25 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-02 LEL/CH4 OLDHAM iTRANS 2 269 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-03 Carbon Monoxide OLDHAM iTRANS 2 269 CO 100 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-04 LEL/CH4 OLDHAM iTRANS 2 269 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-05 Carbon Monoxide OLDHAM iTRANS 2 269 CO 100 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-06 Hydrogen Sulfide OLDHAM iTRANS 2 269 H2S 25 PPM 0.5 LPM Pass Mar-24 Dan Dupuis
269-07 LEL/CH4 OLDHAM iTRANS 2 269 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-08 Carbon Monoxide OLDHAM iTRANS 2 269 CO 100 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-09 Ammonia OLDHAM iTRANS 2 269 NH3 50 PPM 1 LPM Pass 3/1/2024 Dan Dupuis
269-10 LEL/CH4 OLDHAM iTRANS 2 269 H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-11 Carbon Monoxide OLDHAM iTRANS 2 269 CO 100 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
269-12 Ammonia OLDHAM iTRANS 2 269 NH3 50 PPM 1 LPM Pass 3/1/2024 Dan Dupuis
269GASPAD-01 Carbon Monoxide OLDHAM iTRANS 2 269 GAS PAD CO 100 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
269GASPAD-02 LEL/CH4 OLDHAM iTRANS 2 269 GAS PAD H2 2% VOL (50%LEL) 0.5 LPM Pass 3/1/2024 Dan Dupuis
Technician(s):
FTLB Building Technician(s):
SNSR ## Sensor Type Sensor Make Sensor Model Sensor Location Calibration Gas and Concentration
Calibration Gas Flow Rate
Pass / Fail Calibration Date / Comments
DAR
269GASPAD-03 Ammonia OLDHAM iTRANS 2 269 GAS PAD NH3 50 PPM 1 LPM Pass 3/1/2024 Dan Dupuis 269GASPAD-04 Hydrogen Sulfide OLDHAM iTRANS 2 269 GAS PAD H2S 25 PPM 0.5 LPM Pass 3/1/2024 Dan Dupuis
C102-01 Carbon Monoxide MACURCO CM-6 C102 CO 200 PPM 0.5 LPM Pass 3/1/2024 Mike Wodzianski C102-02 Carbon Monoxide MACURCO CM-6 C102 CO 200 PPM 0.5 LPM Pass 3/1/2024 Mike Wodzianski C102-03 Carbon Monoxide MACURCO CM-6 C102 CO 200 PPM 0.5 LPM Pass 3/1/2024 Mike Wodzianski
C103-02-01 Carbon Monoxide MACURCO CM-6 C103-02 CO 200 PPM 0.5 LPM Pass 3/1/2024 Mike Wodzianski C106-01 Carbon Monoxide MACURCO CM-6 C105 CO 200 PPM 0.5 LPM Pass 3/1/2024 Mike Wodzianski
Service work sheet for PORTABLE (P) gas detection Date:
Technician(s):
FTLB Building Technician(s):
P SNSR ## Sensor Type Sensor Make Sensor Model Sensor Serial No. Sensor Location
Calibration Gas and Concentration Pass / Fail Calibration Date / Comments
DAR
P 103-01 4 GAS DRAGER X AM 2000 ERED-0286 103 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass 3/1/2024 James Stunkel
P 104A-01 4 GAS DRAGER X AM 2500 ARMM-0067 104A H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Kellene McKinney
P 104A-02 4 GAS DRAGER X AM 2500 ARMM-0074 104A H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Out of service Mar-24 Kellene McKinney
P 104B-01 4 GAS DRAGER X AM 2000 ERDN-0479 104B H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Dan Dupuis
P 104B-02 4 GAS DRAGER X AM 2000 EREA-0189 104B H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Dan Dupuis
P 105-01 4 GAS DRAGER X AM 2500 ARFD-1192 105 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Jessica Olstad
P 105-02 4 GAS DRAGER X AM 2500 ARFD-1197 105 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Jessica Olstad
P 120-01 O2 DRAGER PAC 7000 ARKB-3038 120 O2 17% Pass Mar-24 Renee Happs
P 121-01 4 GAS DRAGER X AM 2500 ARKE-3442 121 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Jianping Yu
P 131-01 CO DRAGER Pac 5500 ERFN-0646 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-02 CO DRAGER Pac 5500 ERHH-1506 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-03 CO DRAGER Pac 5500 ERFN-0636 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-04 CO DRAGER Pac 5500 ERHH-1512 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-05 CO DRAGER Pac 5500 ERFN-0640 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-06 CO DRAGER Pac 5500 ERHH-1513 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-07 CO DRAGER Pac 5500 ERFN-0642 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-08 CO DRAGER Pac 5500 ERFN-0649 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-09 CO DRAGER Pac 5500 ERFN-0870 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-10 CO DRAGER Pac 5500 ERFN-0863 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-11 CO DRAGER Pac 5500 ERHH-1521 131 CO 100PPM Pass Mar-24 Matt Oliver
P 131-12 CO DRAGER Pac 5500 ERHF-0024 131 CO 100PPM Pass Mar-24 Matt Oliver
P 147-01 4 GAS DRAGER X AM 2000 ERDN-0476 147 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Stephen Tifft
P 155-01 4 Gas DRAGER X AM 2000 ARRD-0013 155 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Scott Palmer
P 155-02 4 GAS DRAGER X AM 2500 ARMM-0100 155 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Scott Palmer
P RESOPS-01 4 GAS DRAGER X AM 2500 ARKF-1625 205 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-02 4 GAS DRAGER X AM 2500 ARKF-1604 118-03 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-03 4 GAS DRAGER X AM 2500 ARKF- 2532 180-7A H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-04 4 GAS DRAGER X AM 2500 ARME-0176 167-01 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-05 4 GAS DRAGER X AM 2500 ARME-0156 168 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-06 4 GAS DRAGER X AM 2500 ARME-0197 167 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-07 4 GAS DRAGER X AM 2500 ARME-0210 IBRF 290 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
Service work sheet for PORTABLE (P) gas detection Date:
Technician(s):
FTLB Building Technician(s):
P SNSR ## Sensor Type Sensor Make Sensor Model Sensor Serial No. Sensor Location
Calibration Gas and Concentration Pass / Fail Calibration Date / Comments
DAR
P RESOPS-08 4 GAS DRAGER X AM 2500 ARKE-3451 IBRF 290 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-09 4 GAS DRAGER X AM 2500 ARKF-1643 105 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-10 4 GAS DRAGER X AM 2500 ARKF-1605 155 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P RESOPS-11 4 GAS DRAGER X AM 2500 ARKE-3440 IBRF 290 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Athanasia Kendl
P 269-01 4 GAS DRAGER X AM 2500 ARLE-3841 269 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Dan Dupuis
P 269-02 4 GAS DRAGER X AM 2500 ARLE-3801 269 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Dan Dupuis
P 269-03 4 GAS DRAGER X AM 2500 ERDN-0478 269 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Dan Dupuis
P 269-04 4 GAS DRAGER X AM 2500 ERDH-1152 269 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Dan Dupuis
P SITEOPS-01 4 GAS DRAGER X AM 5000 ARFM-0084 C103 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Joshua Korosec
P SITEOPS-02 4 GAS DRAGER X AM 5000 ARFE-0681 C103 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% Pass Mar-24 Joshua Korosec p P-21 CO Drager PAC 5500 ERHH1498 131 Co 100PPM pass Mar-24 Matt Oliver p Farrell 4 Gas Drager XAM5000 DRPJ0122 168 H2S 25PPM, CO 100PPM, CH4 50%LEL, O2 17% pass Mar-24 ???
ESIF ECO SENSORS FOR LABS
LAB: SENSOR: NOTE: ORIGINAL INSTALLATION AT ESIF
C221 NO2 XTRALIS ECO SENSORS
C221 CO 17 S54334-Z20-A1 HYDROGEN 0-2000 PPM, CALIBRATION SCALE RANGE 1000PPM
C221 O2 OUT OF SERVICE 5 S54334-Z22-A1 CARBON MONOXIDE 0-500 PPM, CALIBRATION SCALE RANGE 100 PPM C220 NO2 OUT OF SERVICE 4 S54334-Z21-A1 OXYGEN 0-25%, CALIBRATION SCALE RANGE 21% C220 CO OUT OF SERVICE 2 S54334-Z26-A1 NITROGEN DIOXIDE 0-10 PPM, CALIBRATION SCALE RANGE 5 PPM
C220 O2 OUT OF SERVICE 1 S54334-Z23-A1 AMMONIA 0-100 PPM
C332 H2 1 S54334-Z24-A1 HYDROGEN SULFIDE 1-100 PPM , CALIBRATION SCALE RANGE 25 PPM C331 H2 C330 H2 C329 H2
C329 CO
C339 H2 C339 H2 C339 H2 C339 H2 C339 H2 C339 H2 C325 H2 C325 H2
C325 O2 OUT OF SERVICE
C325 CO OUT OF SERVICE
C324 H2 C323 H2
C323 H2S OUT OF SERVICE
C323 CO OUT OF SERVICE
C323 O2 OUT OF SERVICE
C323 NH3 OUT OF SERVICE
C321 H2 C319 H2 C317 H2
ESIF GAS CABINET DETECTION ATI SENSORS
C312-05 H2 25 % LEL T# C12-17-1993 S#D10-17-3181
C312-08 H2 50 %LEL T# C12-17-1992 S# D10-17-3180
C312-09 CO 100% LEL T# B12-16-0604-OE S# C10-16-1213
C313-04 CO 100% LEL GAS BOTTLE STOREAGE LABEL MISSING
C313-06 CO2 OUT OF SERVICE T# B12-15-0976-OE S# C10-15-1595
C313-07 CO 100% LEL T# B12-16-0605-OE S# C10-16-1214
C313-08 CO 50% LEL NO LABEL
C313-09 H2 25% LEL T# C12-17-1987 S#D10-17-3175
C315-02 H2 25% LEL T# C12-17-1989 S# D10-17-3177
C315-04 GAS BOTTLE STOREAGE NOW T# C12-17-1990 S# D10-17-3178
C312-03 GAS BOTTLE STOREAGE NOW T# C12-17-1991 S# D10-17-3179
ESIF GAS DETECTION SENSORS OTHER THAN ECO
LAB: Sensor:
C331 CO HONEYWELL SENSEPOINT XCD
C312 O2 ALPHA OMEGA INSTRUMENTS SERIES 1000
Generated by jkorosec Page 1 of 4
Input Points List
Sites: NREL
Date: July 16, 2024 14:10 Generated by: jkorosec
Object ID Name Calibration Sensor Type Description
NREL
30303.AI6 SERF E007 ZN3 O2 SNSR
(O2-1)
0.1 MIDAS O2 SENSOR AIC new sensor 8/20 good
to 8/23 ss
30304.AI1306 SERF E015 OXYGEN LVL
AI (O2-8)
0 MIDAS O2 SENSOR AIC
30305.AI5 SERF E0C5 ZN1 O2 SNSR
(O2-2)
0 MIDAS O2 SENSOR AIC new sensor 8/20 good to 8/23 ss
30305.AI6 SERF E005 ZN2 O2 SNSR
(O2-3)
-3 ALPHA OMEGA O2
SENSOR AIC
THIS IS A OMEGA
CONTROLLER WILL
RESET BY IT'S SELF -3
calibration to match controller calibrated in lab E004
31100.AI5 SERF W125 H2 SNSR
(H2-1)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31100.AI6 SERF W125 H2 SNSR
(H2-2)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31100.AI7 SERF W125 H2 SNSR
(H2-3)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31200.AI2 SERF W128 H2 SNSR
(H2-4)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31200.AI3 SERF W128 H2 SNSR
(H2-5)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31200.AI4 SERF W128 H2 SNSR
(H2-6)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31200.AI5 SERF W128 H2 SNSR
(H2-7)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31200.AI6 SERF W128 H2 SNSR
(H2-8)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31300.AI2 SERF W129 H2 SNSR
(H2-9)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31300.AI3 SERF W129 H2 SNSR
(H2-10)
0 Hydrogen 4-20mA
0-100 %LEL AIC
Generated by jkorosec Page 2 of 4
NREL
31300.AI4 SERF W129 H2 SNSR
(H2-11) 0 Hydrogen 4-20mA
0-100 %LEL AIC
31300.AI5 SERF W129 H2 SNSR
(H2-12)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31400.AI2 SERF W1C3 W H2 SNSR
(H2-13)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31400.AI3 SERF W1C3 E H2 SNSR
(H2-14)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31500.AI2 SERF W2C3 H2 SNSR
(H2-15)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31500.AI3 SERF W2C3 H2 SNSR
(H2-16)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31500.AI4 SERF W2C3 H2 SNSR
(H2-17)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31500.AI5 SERF W2C3 H2 SNSR
(H2-18)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31500.AI6 SERF W2C3 H2 SNSR
(H2-19)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31500.AI7 SERF W206 H2 SNSR
(H2-20)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31700.AI2 SERF W211 H2 SNSR
(H2-21)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31700.AI3 SERF W211 H2 SNSR
(H2-22)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31700.AI4 SERF W209 H2 SNSR
(H2-23)
0 Hydrogen 4-20mA
0-100 %LEL AIC
SENSOR IS IN VMB
CABINET #1 SENSOR
31700.AI5 SERF W209 H2 SNSR
(H2-24)
0 Hydrogen 4-20mA
0-100 %LEL AIC
AMBIENT ABOVE TOOL
NEXT TO FUMEHOOD #2
SENSOR
31700.AI6 SERF W209 O2 SNSR
(O2-4)
-0.2 Oxygen 4-20mA 0-25%
O2 AIC
Generated by jkorosec Page 3 of 4
NREL
31700.AI7 SERF W209 O2 SNSR
(O2-5) 0 Oxygen 4-20mA 0-25%
O2 AIC
cal was at -0.130 10/2016 but unit was in hand adjusted calibration to+ 0.800 10/2016 ss cartridge expiring and occationally drops to 0% in Delta, while reading 20.9% on local display.
Overridden until replaced, second O2 sensor in room functioning as backup.
12/23/2017 JLR
31800.AI2 SERF W213 H2 SNSR
(H2-25)
0 Hydrogen 4-20mA
0-100 %LEL AIC
inside east duct work on mfc exhaust
31800.AI3 SERF W213 H2 SNSR
(H2-26)
0 Hydrogen 4-20mA
0-100 %LEL AIC
hanging in front of east mfc enclosure ambient point
31800.AI4 SERF W213 H2 SNSR
(H2-27)
0 Hydrogen 4-20mA
0-100 %LEL AIC
half way between west mfc cabinet and e system for ambbient between two systems
31800.AI5 SERF W213 H2 SNSR
(H2-28)
0 Hydrogen 4-20mA
0-100 %LEL AIC
inside duct work on west mfc exhaust duct
31800.AI6 SERF W213 H2 SNSR
(H2-29)
0 Hydrogen 4-20mA
0-100 %LEL AIC
near e system loadk lock door for maintenance on system when opened.
31900.AI1102 SERF W212 H2 SNSR
(H2-30)
0 Hydrogen 4-20mA
0-100 %LEL AIC
31900.AI1103 SERF W212 H2 SNSR
(H2-31)
0.2 Hydrogen 4-20mA
0-100 %LEL AIC
31900.AI1104 SERF W212 H2 SNSR
(H2-32)
0.1 Hydrogen 4-20mA
0-100 %LEL AIC
31900.AI1201 SERF W212 H2 SNSR
(H2-33)
0.2 Hydrogen 4-20mA
0-100 %LEL AIC
31900.AI1302 SERF W212 O3 SNSR
(O3-2)
0 Ozone O3 4-20mA 0-700 ppb AIC
31900.AI1303 SERF W212 O3 SNSR
(O3-3)
0 Ozone O3 4-20mA 0-700 ppb AIC
31900.AI1304 SERF W212 O3 SNSR
(O3-4)
0 Ozone O3 4-20mA 0-700 ppb AIC
32500.AI1101 SERF C1C2 H2 SNSR
(H2-38)
0 Hydrogen 4-20mA
0-100 %LEL AIC
Generated by jkorosec Page 4 of 4
NREL
32500.AI1102 SERF C1C2 H2 SNSR
(H2-39) 0 Hydrogen 4-20mA
0-100 %LEL AIC
32500.AI1103 SERF H124 H2 SNSR
(H2-40)
0 Hydrogen 4-20mA
0-100 %LEL AIC
33600.AI12 SERF E1C3 O2 SNSR
(O2-6)
0.1 MIDAS O2 SENSOR AIC new sensor 8/20 good
to 8/23 ss
33700.AI12 SERF E2C3 O2 SNSR
(O2-7)
0.1 MIDAS O2 SENSOR AIC new sensor 8/20 good
to 8/23 ss
36400.AI1101 SERF E216 H2 SNSR
(H2-34)
0 H2 AIC
36400.AI1102 SERF E216 NH3 SNSR
(NH3-1)
0 H2 AIC
36400.AI1103 SERF E216 H2 SNSR
(H2-35)
0 H2 AIC
36400.AI1104 SERF E216 NH3 SNSR
(NH3-2)
0 H2 AIC
36400.AI1105 SERF E216 H2 SNSR
(H2-36)
0 H2 AIC
36400.AI1106 SERF E216 NH3 SNSR
(NH3-3)
0 H2 AIC
36400.AI1107 SERF E216 H2 SNSR
(H2-37)
0 H2 AIC
36400.AI1108 SERF E216 NH3 SNSR
(NH3-4)
0 H2 AIC
Total : 55 Objects
Generated by jkorosec Page 1 of 3
Input Points List
Sites: NREL
Date: July 16, 2024 14:14 Generated by: jkorosec
NREL
37400.AI1101 STF 213 BAY2 H2 SNSR
(H2-1)
0 H2 AIC
37400.AI1102 STF 213 BAY3 H2 SNSR
(H2-2)
0 H2 AIC
37400.AI1103 STF 213 BAY3 H2 SNSR
(H2-3)
0 H2 AIC
37400.AI1104 STF 213 BAY4 H2 SNSR
(H2-4)
0 H2 AIC
37400.AI1201 STF 213 BAY5 H2 SNSR
(H2-5)
0.5 H2 AIC
37400.AI1203 STF 200C3 BAY4 H2
SNSR (H2-6)
0 H2 AIC
37400.AI1301 STF 203A HVPE1 H2
SNSR (H2-8)
0.5 H2 AIC 7400.AI1301 HVPE
TOOL EAST ENCLOSURE
H2 SENSOR #8
37400.AI1302 STF 203A HVPE1 H2
SNSR (H2-9)
0.5 H2 AIC 7400.AI1302 HVPE
TOOL WEST ENCLOSURE
H2 SENSOR #9
37400.AI1303 STF 203A HVPE1 H2
SNSR (H2-10)
0.5 H2 AIC 7400.AI1303 HVPE
TOOL BUBBLERS
CABINET ENCLOSURE H2
SENSOR #10
37400.AI1304 STF 214 CLN RM H2
SNSR (H2-11)
0 H2 AIC
37400.AI1401 STF 214 CLN RM H2
SNSR (H2-12)
0 H2 AIC
37400.AI1402 STF 214 CLN RM H2
SNSR (H2-13)
0 H2 AIC
37400.AI1403 STF 214 CLN RM H2
SNSR (H2-14)
0 H2 AIC
37400.AI1404 STF 214 CLN RM H2
SNSR (H2-15)
Generated by jkorosec Page 2 of 3
NREL
37400.AI2101 STF 200C3 204 W H2
SNSOR (H2-16)
0 H2 AIC
37400.AI2102 STF 200C3 204 E H2
SNSR (H2-17)
0 H2 AIC
37400.AI2103 STF 200C3 203B W H2
SNSR (H2-18)
0 H2 AIC LOCATED OUT SIDE
203B LAB IN CENTER
BUMP OUT IN CORRIDOR
AMBIENT POINT
37400.AI2104 STF 200C3 203B E H2
SNSR (H2-19)
0.5 H2 AIC LOCATED OUT SIDE
203B LAB CENTER
CORRIDOR EASTERN
BUMP OUT CLOSER TO
203A LAB AMBIENT
POINT
37400.AI2201 STF 203A HVPE1 H2
SNSR (H2-20)
0 H2 AIC 7400.AI2201 HVPE
TOOL SCRUBBER H2
SENSOR #7 LOCATED
ABOVE MDA PANEL IN
LAB 203 THIS UNITS
READS LEL SCRUBBER
CABINET WEST SIDE
WHITE CABINET
37400.AI2202 STF 200C3 BAY1 H2
SNSR (H2-21)
0 H2 AIC
37400.AI2203 STF 200C3 BAY3 H2
SNSR (H2-22)
0 H2 AIC
37400.AI2301 STF 214 CLN RM H2
SNSR (H2-23)
0 H2 AIC
37400.AI2302 STF 214 CLN RM H2
SNSR (H2-24)
0 H2 AIC
37400.AI2303 STF 214 CLN RM CH4
SNSR (CH4-1)
0 H2 AIC
37400.AI2304 STF 214 CLN RM CH4
SNSR (CH4-2)
0 H2 AIC
37400.AI4302 STF 203A HVPE1 H2
SNSR (H2-25)
0.5 STF H2 ppm AIC 7400.AI4302 HVPE
TOOL WEST ENCLOSURE
H2 SENSOR #1 LOCATED
ABOVE MDA PANEL IN
LAB 203 THIS UNITS
READS PPM CONTROLS
EAST REACTOR IN EAST
ENCLOSURE
37400.AI4303 STF 203B H2 SNSR
(H2-26)
0.5 H2 AIC LOCATED IN 203B EAST
SIDE ON CABLE TRAY
AMBIENT
Generated by jkorosec Page 3 of 3
NREL
37400.AI4304 STF 203B H2 SNSR
(H2-27)
0.5 H2 AIC LOCATED IN 203B
CENTER OF LAB ON
CABLE TRAY AMBIENT
37400.AI4401 STF 203B H2 SNSR
(H2-28)
0.5 H2 AIC LOCATED IN 203B
CENTER OF LAB ON
CABLE TRAY AMBIENT
37400.AI4402 STF 203A HVPE1 H2
SNSR (H2-29)
0.5 H2 AIC 7400.AI4302 HVPE
TOOL AMBIENT H2
SENSOR #5 LOCATED
ABOVE MDA PANEL IN
LAB 203 THIS UNITS
READS LEL LOCATED IN
FRONT OF TOOL
AMBIENT POINT
37400.AI4403 STF 204 H2 SNSR
(H2-30)
0.5 H2 AIC
37400.AI4404 STF 200C3 BAY3 CH4
SNSR (CH4-3)
0.5 H2 AIC 200C3-1 located in
corridor outside bay 3 listed as methane
37400.AI5201 STF 203A HVPE3 H2
SNSR (H2-31)
0 H2 AIC
37400.AI5202 STF 203A HVPE3 H2
SNSR (H2-32)
0 H2 AIC
37400.AI5203 STF 203A HVPE3 H2
SNSR (H2-33)
0 H2 AIC
37400.AI5204 STF 203A HVPE3 H2
SNSR (H2-34)
0 H2 AIC
37400.AI5205 STF 203A HVPE3 H2
SNSR (H2-35)
0 H2 AIC
37400.AI5206 STF 203A HVPE2 H2
SNSR (H2-36)
0 H2 AIC
37400.AI5207 STF 203A HVPE2 H2
SNSR (H2-37)
0 H2 AIC
37400.AI5208 STF 203A HVPE2 H2
SNSR (H2-38)
0 H2 AIC
37400.AI5301 STF 203A HVPE2 H2
SNSR (H2-39)
0 H2 AIC
37400.AI5302 STF 203A HVPE2 H2
SNSR (H2-40)
Total : 42 Objects
| Attachment 1 - SOW - On-site Calibration and Testing for Gas Detectors |
| Attachement 1 - Exhibit A - Portable and Fixed Gas Detectors |
| FIXED GAS |
| PORTABLE GAS |
File details come from the government source that posted it. Updated .