SUMMARY
Tab Instructions: Populate yellow highlighted cell with company name. The remaining cells on this tab auto-populate sub-total figures from the remaining tabs. Costs provided shall represent all labor, materials, software, services, and overhead costs required to provide and maintain a complete and functioning Parking Guidance System as described in the plans, specifications and RFP documents.
| Parking Guidance System | | | |
| Price Proposal Form | | | |
| ENTER COMPANY NAME | x | x | x |
| SUMMARY | |
| PGS HARDWARE AND INFRASTRUCTURE | |
| Parking Garage A | $0.00 |
| Parking Garage B | $0.00 |
| Terminal Top | $0.00 |
| Parking Garage C | $0.00 |
| Roadway and Entry Plaza Signs | $0.00 |
| HARDWARE AND INFRASTRUCTURE SUBTOTAL | $0.00 |
| SERVERS, SOFTWARE, INTEGRATIONS AND INTERFACES | |
| Servers | $0.00 |
| Software | $0.00 |
| Open API Interfaces | $0.00 |
| SERVER, SOFTWARE & API SUBTOTAL | $0.00 |
| SERVICES | |
| Services (Design, Project Management, etc.) | $0.00 |
| SERVICES SUBTOTAL | $0.00 |
| ONSITE SPARE PARTS | |
| Onsite Spare Parts | $0.00 |
| ONSITE SPARE PARTS SUBTOTAL | $0.00 |
| WARRANTY AND LABOR RATES | |
| One-Year Warranty | $0.00 |
| Hourly Rates for One-Year Warranty | $0.00 |
| Hourly Rates for Post-Warranty (Years 2-8) | $0.00 |
| WARRANTY & LABOR RATES SUBTOTAL | $0.00 |
| POST WARRANTY MAINTENANCE FEES | |
| Option #1 Time & Materials Post Warranty Maintenance (Years 2-8) | $0.00 |
| Option #2 All Inclusive Post Warranty Maintenance (Years 2-8) | $0.00 |
| RECURRING FEES | |
| Annual Base Recurring Fees (Years 2-8) | $0.00 |
TOTAL with Option #1 Post Warranty Maintenance $0.00
TOTAL with Option #2 Post Warranty Maintenance $0.00
| PGS OPTIONS | |
| Roadway Static Monument Signs with LED Inserts | $0.00 |
| Entry Plaza Static Monument Signs with LED Inserts | $0.00 |
| Variable Price by Location Software | $0.00 |
| Integration with SKIDATA PARCS for Variable Pricing | $0.00 |
| Import License Plates to Watchlist | $0.00 |
| Occupancy Threshold Integration with SKIDATA PARCS | $0.00 |
| Other:_____________________________________ | $0.00 |
| Other:_____________________________________ | $0.00 |
| ANNUAL RECURRING FEES FOR OPTIONS (Years 2-8) | 0 |
| Variable Price by Location Recurring Fees | $0.00 |
| Other Year 2:_____________________________________ | $0.00 |
| Other Year 2:_____________________________________ | $0.00 |
| Other Year 2:_____________________________________ | $0.00 |
Parking Garage A
| Tab Instructions: Populate yellow highlighted cells with # of units and unit prices for the listed components. Use the "Other:____" rows to add additional components, # of units and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Parking Garage A | | | | |
| Location | Description | # Units* | Unit Cost | Extended Cost |
| Parking Garage A | | | | |
| Helix Signs | 2 | | $0.00 |
| Helix Signs with EV | 1 | | $0.00 |
| Ramp Level Entry Signs - One Direction | 2 | | $0.00 |
| Ramp Level Entry Signs - Two Directions | 1 | | $0.00 |
| Single Directional Level Signs - One Direction | 2 | | $0.00 |
| Single Directional Level Signs - Two Directions | 6 | | $0.00 |
| Two-Sided Directional Level Signs - Three Directions | 2 | | $0.00 |
| Single Aisle Signs | 30 | | $0.00 |
| Two-Sided Aisle Signs | 13 | | $0.00 |
| Covered Spaces: Camera Sensors w/ LED Indicator for 2,541 Spaces | | | $0.00 |
| Uncovered Spaces: Camera Sensors for 890 Spaces | | | $0.00 |
| Additional Infrastructure Required | | |
| Data Consolidators | | $0.00 |
| Conduit | 1 | $0.00 |
| Power Lines | 1 | $0.00 |
| Communication Lines | 1 | $0.00 |
| Network Components | 1 | $0.00 |
| UPS Units | | $0.00 |
| Other:_____________________________________ | | $0.00 |
| Other:_____________________________________ | | $0.00 |
Total $0.00
* For yellow highlighted cells: must include # of units and unit cost, and not one lumps sum.
Parking Garage B
| Tab Instructions: Populate yellow highlighted cells with # of units and unit prices for the listed components. Use the "Other:____" rows to add additional components, # of units and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Parking Garage B | | | | |
| Location | Description | # Units* | Unit Cost | Extended Cost |
| Parking Garage B | | | | |
| Helix Signs | 2 | | $0.00 |
| Helix Signs with EV | 1 | | $0.00 |
| Ramp Level Entry Signs - One Direction | 1 | | $0.00 |
| Ramp Level Entry Signs - Two Directions | 2 | | $0.00 |
| Single Directional Level Signs - Two Directions | 9 | | $0.00 |
| Two-Sided Directional Level Signs - Three Directions | 2 | | $0.00 |
| Single Aisle Signs | 31 | | $0.00 |
| Two-Sided Aisle Signs | 13 | | $0.00 |
| Covered Spaces: Camera Sensors w/ LED Indicator for 2,424 Spaces | | | $0.00 |
| Uncovered Spaces: Camera Sensors for 890 Spaces | | | $0.00 |
| Additional Infrastructure Required | | |
| Data Consolidators | | $0.00 |
| Conduit | 1 | $0.00 |
| Power Lines | 1 | $0.00 |
| Communication Lines | 1 | $0.00 |
| Network Components | 1 | $0.00 |
| UPS Units | | $0.00 |
| Other:_____________________________________ | | $0.00 |
| Other:_____________________________________ | | $0.00 |
Total $0.00
* For yellow highlighted cells: must include # of units and unit cost, and not one lumps sum.
Terminal Top
| Tab Instructions: Populate yellow highlighted cells with # of units and unit prices for the listed components. Use the "Other:____" rows to add additional components, # of units and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Terminal Top | | | | |
| Location | Description | # Units* | Unit Cost | Extended Cost |
| Terminal Top | | | | |
| Helix Signs | 6 | | $0.00 |
| Single Directional Level Signs - One Direction | 11 | | $0.00 |
| Single Directional Level Signs - Two Directions | 18 | | $0.00 |
| Two-Sided Directional Level Signs - Three Directions | 1 | | $0.00 |
| Single Aisle Signs | 37 | | $0.00 |
| Two-Sided Aisle Signs | 13 | | $0.00 |
| Covered Spaces: Camera Sensors w/ LED Indicator for 1,651 Spaces | | | $0.00 |
| Additional Infrastructure Required | | |
| Data Consolidators | | $0.00 |
| Conduit | 1 | $0.00 |
| Power Lines | 1 | $0.00 |
| Communication Lines | 1 | $0.00 |
| Network Components | 1 | $0.00 |
| UPS Units | | $0.00 |
| Other:_____________________________________ | | $0.00 |
| Other:_____________________________________ | | $0.00 |
Total $0.00
* For yellow highlighted cells: must include # of units and unit cost, and not one lumps sum.
Parking Garage C
| Tab Instructions: Populate yellow highlighted cells with # of units and unit prices for the listed components. Use the "Other:____" rows to add additional components, # of units and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Parking Garage C | | | | |
| Location | Description | # Units* | Unit Cost | Extended Cost |
| Parking Garage C | | | | |
| Helix Signs | 2 | | $0.00 |
| Helix Signs with EV | 1 | | $0.00 |
| Ramp Level Entry Signs - One Direction | 0 | | $0.00 |
| Ramp Level Entry Signs - Two Directions | 0 | | $0.00 |
| Single Directional Level Signs - One Direction | 0 | | $0.00 |
| Single Directional Level Signs - Two Directions | 8 | | $0.00 |
| Two-Sided Directional Level Signs - Three Directions | 0 | | $0.00 |
| Single Aisle Signs | 62 | | $0.00 |
| Two-Sided Aisle Signs | 0 | | $0.00 |
| Covered Spaces: Camera Sensors w/ LED Indicator for 1,761 Spaces | | | $0.00 |
| Uncovered Spaces: Camera Sensors for 637 Spaces | | | $0.00 |
| Additional Infrastructure Required | | |
| Data Consolidators | | $0.00 |
| Conduit | 1 | $0.00 |
| Power Lines | 1 | $0.00 |
| Communication Lines | 1 | $0.00 |
| Network Components | 1 | $0.00 |
| UPS Units | | $0.00 |
| Other:_____________________________________ | | $0.00 |
| Other:_____________________________________ | | $0.00 |
Total $0.00
* For yellow highlighted cells: must include # of units and unit cost, and not one lumps sum.
Roadway & Entry Signs
| Tab Instructions: Populate yellow highlighted cells with unit prices for the listed signs. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Roadway & Entry Plaza Signs | | | | |
| Location | Description | # Units | Unit Cost | Extended Cost |
| Roadway Dynamic Signs | | | | |
| Sign #1 JFB Southbound All Terminals | 1 | | $0.00 |
| Sign #2 JFB Southbound Terminal A | 1 | | $0.00 |
| Sign #4 JFB Southbound Terminals B & C | 1 | | $0.00 |
| Sign #7 JFB Northbound All Terminals | 1 | | $0.00 |
| Sign #8 JFB Northbound All Terminals | 1 | | $0.00 |
| Garage Entry Plaza Signs | | | |
| Sign # 3 Terminal A | 1 | $0.00 |
| Sign # 5 Terminal B | 1 | $0.00 |
| Sign # 6 Terminal C | 1 | $0.00 |
| Sign Installation | | | |
| Sign #1 JFB Southbound All Terminals | 1 | $0.00 |
| Sign #2 JFB Southbound Terminal A | 1 | $0.00 |
| Sign #4 JFB Southbound Terminals B & C | 1 | $0.00 |
| Sign #7 JFB Northbound All Terminals | 1 | $0.00 |
| Sign #8 JFB Northbound All Terminals | 1 | $0.00 |
| Sign # 3 Terminal A | 1 | $0.00 |
| Sign # 5 Terminal B | 1 | $0.00 |
| Sign # 6 Terminal C | 1 | $0.00 |
Total $0.00
Servers & Software
| Tab Instructions: Populate yellow highlighted cells with unit prices for the listed hardware, software and API interface components. Use the "Other:____" rows to add additional components and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Software, Integrations, and Interfaces | | | | |
| Location | Description | # Units | Unit Cost | Extended Cost |
| Hardware | | | | |
| Server - Primary | 1 | | $0.00 |
| Server - Secondary | 1 | | $0.00 |
| Server - Test Environment (can be virtual in other servers) | 1 | | $0.00 |
| Total - Hardware | | $0.00 |
| Software | | | |
| Server Software | 1 | $0.00 |
| PGS Application Software | 1 | $0.00 |
| Car Locator Software | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Total - Software | $0.00 |
| API Interfaces | | |
| Occupancy Counts to MCO Website | 1 | $0.00 |
| Occupancy Counts to MCO Mobile App | 1 | $0.00 |
| SKIDATA Space Counts to PGS for Parking Lots | 1 | $0.00 |
| PGS Data to PowerBI | 1 | $0.00 |
| PGS Data to Salesforce | 1 | $0.00 |
Total - API Interfaces $0.00
Services
| Tab Instructions: Populate yellow highlighted cells with unit prices for the listed services. Use the "Other:____" rows to add additional components and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents. | | | | | |
| ERROR:#VALUE! | | | | | |
| Parking Guidance System | | | | | |
| Price Proposal Form | | | | | |
| Services | | | | | |
| Location | Description | # Units | Unit Cost | Extended Cost | |
| Services | | | | | |
| Design Coordination | 1 | | $0.00 | ` |
| Professional Engineer Design Services | 1 | | $0.00 | |
| Mobilization | 1 | | $0.00 | |
| Installation | 1 | | $0.00 | |
| Project Management | 1 | | $0.00 | |
| Bonding | 1 | | $0.00 | |
| Training | 1 | | $0.00 | |
| Acceptance Testing | 1 | | $0.00 | |
| Freight & Storage | 1 | | $0.00 | |
| Other:_____________________________________ | 1 | | $0.00 | |
| Other:_____________________________________ | 1 | | $0.00 | |
| Other:_____________________________________ | 1 | | $0.00 | |
Total $0.00
Onsite Spare Parts
| Tab Instructions: Populate yellow highlighted cells with the part description, # of units, and unit price for each spare part that should be kept onsite to maintain the PGS. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| Onsite Spare Parts | | | | |
| Spare Parts | Description | # Units | Unit Cost | Extended Cost |
| Spare Parts to be Kept Onsite | | | | |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
| | | | $0.00 |
Total $0.00
All PGS Parts List
| Tab Instructions: Populate yellow highlighted cells with the part description, part #, and unit price for all parts needed to maintain the PGS. Add lines as needed. |
| ERROR:#VALUE! |
| Parking Guidance System |
| Price Proposal Form |
| All PGS Parts List | | | |
| Parts | Description | Part # | Unit Cost |
| All Spare Parts to Maintain the PGS (price will be valid for 2 years after system acceptance and a maximum of 3% increase per year for years 3-8) | | | |
Warranty & Labor Rates Tab Instructions: Populate yellow highlighted cells with unit prices for the listed components. Use the "Other:____" rows to add additional components and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents.
| Parking Guidance System |
| Price Proposal Form |
| Warranty and Labor Rates | | | | | |
| Description | | # Units | Unit Cost | Extended Cost | Comments |
| Warranty | | | | | |
| One-Year Warranty | 1 | | $0.00 | |
| Total - Warranty | | $0.00 |
| Hourly Rates for 12 Month Warranty | | | |
| Hardware Technician | | 1 | $0.00 |
| Network Engineer | | 1 | $0.00 |
| Server Engineer | | 1 | $0.00 |
| Software Engineer | | 1 | $0.00 |
| Database Engineer | | 1 | $0.00 |
| Other:_____________________________________ | | 1 | $0.00 |
| Other:_____________________________________ | | 1 | $0.00 |
| Other:_____________________________________ | | 1 | $0.00 |
| Total - Hourly Rates Warranty | | $0.00 |
| Hourly Rates for Post Warranty Maintenance | | | |
| Hardware Technician Year 2 | | 1 | $0.00 |
| Hardware Technician Year 3 | | 1 | $0.00 |
| Hardware Technician Year 4 | | 1 | $0.00 |
| Hardware Technician Year 5 | | 1 | $0.00 |
| Hardware Technician Year 6 | | 1 | $0.00 |
| Hardware Technician Year 7 | | 1 | $0.00 |
| Hardware Technician Year 8 | | 1 | $0.00 |
| Network Engineer Year 2 | | 1 | $0.00 |
| Network Engineer Year 3 | | 1 | $0.00 |
| Network Engineer Year 4 | | 1 | $0.00 |
| Network Engineer Year 5 | | 1 | $0.00 |
| Network Engineer Year 6 | | 1 | $0.00 |
| Network Engineer Year 7 | | 1 | $0.00 |
| Network Engineer Year 8 | | 1 | $0.00 |
| Server Engineer Year 2 | | 1 | $0.00 |
| Server Engineer Year 3 | | 1 | $0.00 |
| Server Engineer Year 4 | | 1 | $0.00 |
| Server Engineer Year 5 | | 1 | $0.00 |
| Server Engineer Year 6 | | 1 | $0.00 |
| Server Engineer Year 7 | | 1 | $0.00 |
| Server Engineer Year 8 | | 1 | $0.00 |
| Software Engineer Year 2 | | 1 | $0.00 |
| Software Engineer Year 3 | | 1 | $0.00 |
| Software Engineer Year 4 | | 1 | $0.00 |
| Software Engineer Year 5 | | 1 | $0.00 |
| Software Engineer Year 6 | | 1 | $0.00 |
| Software Engineer Year 7 | | 1 | $0.00 |
| Software Engineer Year 8 | | 1 | $0.00 |
| Database Engineer Year 2 | | 1 | $0.00 |
| Database Engineer Year 3 | | 1 | $0.00 |
| Database Engineer Year 4 | | 1 | $0.00 |
| Database Engineer Year 5 | | 1 | $0.00 |
| Database Engineer Year 6 | | 1 | $0.00 |
| Database Engineer Year 7 | | 1 | $0.00 |
| Database Engineer Year 8 | | 1 | $0.00 |
| Other Year 2:_____________________________________ | | 1 | $0.00 |
| Other Year 3:_____________________________________ | | 1 | $0.00 |
| Other Year 4:_____________________________________ | | 1 | $0.00 |
| Other Year 5:_____________________________________ | | 1 | $0.00 |
| Other Year 6:_____________________________________ | | 1 | $0.00 |
| Other Year 7:_____________________________________ | | 1 | $0.00 |
| Other Year 8:_____________________________________ | | 1 | $0.00 |
| Total - Hourly Rates Post Warranty | | $0.00 |
Post Warranty Option #1 Tab Instructions: Populate yellow highlighted cells with minimum time charged per trip and trip fees. The estimated trips are used for evaluation purposes only. The hourly rates are from the 'Warranty and Labor Rates' Tab.
| Parking Guidance System |
| Price Proposal Form |
| Post Warranty Maintenance Option #1 Time and Materials | | | | | | | |
| Description | | | Hardware Technician | Network Engineer | Server Engineer | Software Engineer | Database Engineer |
| Labor (# of trips are estimated for evaluation purposes only) | | | | | | | |
| Annual number of service calls per year - minimum time charged | | 12 | 6 | 3 | 2 | 2 |
| Minimum time charged per trip/service call (in minutes) | | | | | | |
| Labor with Hourly Rate Year 2 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 3 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 4 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 5 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 6 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 7 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 8 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | Subtotal - Labor (minimum time) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total - Labor (minimum time) $0.00
| Annual number of service calls per year - 3 hours each | | 12 | 6 | 3 | 2 | 2 |
| Labor with Hourly Rate Year 2 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 3 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 4 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 5 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 6 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 7 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor with Hourly Rate Year 8 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotal - Labor (3 hours each) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total - Labor (3 hours each) | $0.00 |
| Trip Fees (# of trips are estimated for evaluation purposes only) | | |
Includes all costs such as time, mileage, fuel
| Number of trips per year | Trip Fee | 12 | 6 | 3 | 2 | 2 |
| Trip Service Fee Year 2 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trip Service Fee Year 3 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trip Service Fee Year 4 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trip Service Fee Year 5 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trip Service Fee Year 6 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trip Service Fee Year 7 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trip Service Fee Year 8 | | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotal - Trip Fees | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total - Trip Fees $0.00
| Annual Parts (Estimated for Evaluation Purposes Only) | | | | # Units | Unit Cost | Extended Cost |
| Cameras for covered spaces (3% of total cameras) | | | 0 | $0.00 | $0.00 |
| Cameras for uncovered spaces (5% of total cameras) | | | 0 | $0.00 | $0.00 |
| Helix signs (12 signs total) | | | 1 | $0.00 | $0.00 |
| Single directional level signs - two directions (5% of total) | | | 2 | $0.00 | $0.00 |
| Single aisle signs (5% of total) | | | 8 | $0.00 | $0.00 |
| Data consolidators (2 per car park) | | ` | 8 | $0.00 | $0.00 |
| | Annual Total - Parts | | | | $0.00 |
| | Total - Parts for Years 2-8 | | | | $0.00 |
Grand Total - Post Warranty Maintenance Option #1 $0.00
Post Warranty Option #2 Tab Instructions: Populate yellow highlighted cells with unit prices for the listed components to satisfy the requirements of the plans, specifications and RFP documents.
| Parking Guidance System |
| Price Proposal Form |
| Post Warranty Maintenance Option #2 All Inclusive | | | | | |
| Description | | # Units | Unit Cost | Extended Cost | Comments |
| Option #2 Post Warranty Maintenance All Inclusive | | | | | |
| Post-Warranty Maintenance Year 2 | 1 | | $0.00 | |
| Post-Warranty Maintenance Year 3 | 1 | | $0.00 | |
| Post-Warranty Maintenance Year 4 | 1 | | $0.00 | |
| Post-Warranty Maintenance Year 5 | 1 | | $0.00 | |
| Post-Warranty Maintenance Year 6 | 1 | | $0.00 | |
| Post-Warranty Maintenance Year 7 | 1 | | $0.00 | |
| Post-Warranty Maintenance Year 8 | 1 | | $0.00 | |
Total - Post Warranty Maintenance Option #2 $0.00
Base Recuring Fees Tab Instructions: Populate yellow highlighted cells with unit prices for the listed components. Use the "Other:____" rows to add additional annual recurring fees and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents.
| Parking Guidance System |
| Price Proposal Form |
| Annual Base Recurring Fees | | | | | |
| Description | | # Units | Unit Cost | Extended Cost | Comments |
| Annual Base Recurring Fees (Years 2-8) | | | | | |
| Annual Software License Fee Year 2 | 1 | | $0.00 | |
| Annual Software License Fee Year 3 | 1 | | $0.00 | |
| Annual Software License Fee Year 4 | 1 | | $0.00 | |
| Annual Software License Fee Year 5 | 1 | | $0.00 | |
| Annual Software License Fee Year 6 | 1 | | $0.00 | |
| Annual Software License Fee Year 7 | 1 | | $0.00 | |
| Annual Software License Fee Year 8 | 1 | | $0.00 | |
Total - Annual Software License $0.00
| Other Year 2:_____________________________________ | 1 | $0.00 |
| Year 3 | 1 | $0.00 |
| Year 4 | 1 | $0.00 |
| Year 5 | 1 | $0.00 |
| Year 6 | 1 | $0.00 |
| Year 7 | 1 | $0.00 |
| Year 8 | 1 | $0.00 |
Total - Other $0.00
| Other Year 2:_____________________________________ | 1 | $0.00 |
| Year 3 | 1 | $0.00 |
| Year 4 | 1 | $0.00 |
| Year 5 | 1 | $0.00 |
| Year 6 | 1 | $0.00 |
| Year 7 | 1 | $0.00 |
| Year 8 | 1 | $0.00 |
Total - Other $0.00
| Other Year 2:_____________________________________ | 1 | $0.00 |
| Year 3 | 1 | $0.00 |
| Year 4 | 1 | $0.00 |
| Year 5 | 1 | $0.00 |
| Year 6 | 1 | $0.00 |
| Year 7 | 1 | $0.00 |
| Year 8 | 1 | $0.00 |
Total - Other $0.00
Total - Base Annual Recurring Fees $0.00
Options & Recurring Fees Tab Instructions: Populate yellow highlighted cells with quantities and unit prices for the listed components. Use the "Other:____" rows to add additional components, quantities and unit prices required by your proposed solution to satisfy the requirements of the plans, specifications and RFP documents.
| Parking Guidance System |
| Price Proposal Form |
| Options & Recurring Fees for Options | | | | |
| Location | Description | # Units | Unit Cost | Extended Cost |
| Roadway Static Monument Signs with LED Inserts | | | | |
| Sign #1 JFB Southbound All Terminals | 1 | | $0.00 |
| Sign #2 JFB Southbound Terminal A | 1 | | $0.00 |
| Sign #4 JFB Southbound Terminals B & C | 1 | | $0.00 |
| Sign #7 JFB Northbound All Terminals | 1 | | $0.00 |
| Sign #8 JFB Northbound All Terminals | 1 | | $0.00 |
Total - Roadway Static Monument Signs $0.00
| Entry Plaza Static Monument Signs with LED Inserts | | | |
| Sign # 3 Terminal A | 1 | $0.00 |
| Sign # 5 Terminal B | 1 | $0.00 |
| Sign # 6 Terminal C | 1 | $0.00 |
Total - Entry Plaza Static Monument Signs $0.00
| Other Options | | | |
| Variable Price by Location Software | 1 | $0.00 |
| Integration with SKIDATA PARCS for Variable Pricing | 1 | $0.00 |
| Import License Plates to Watchlist | 1 | $0.00 |
| Occupancy Threshold Integration with SKIDATA PARCS | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Other:_____________________________________ | 1 | $0.00 |
| Annual Recurring Fees for Options (Years 2-8) | | | |
| Annual Variable Price by Location Software Year 2 | 1 | $0.00 |
| Annual Variable Price by Location Software Year 3 | 1 | $0.00 |
| Annual Variable Price by Location Software Year 4 | 1 | $0.00 |
| Annual Variable Price by Location Software Year 5 | 1 | $0.00 |
| Annual Variable Price by Location Software Year 6 | 1 | $0.00 |
| Annual Variable Price by Location Software Year 7 | 1 | $0.00 |
| Annual Variable Price by Location Software Year 8 | 1 | $0.00 |
Total - Variable Price by Location $0.00
| Other Year 2:_____________________________________ | 1 | $0.00 |
| Year 3 | 1 | $0.00 |
| Year 4 | 1 | $0.00 |
| Year 5 | 1 | $0.00 |
| Year 6 | 1 | $0.00 |
| Year 7 | 1 | $0.00 |
| Year 8 | 1 | $0.00 |
Total - Recurring Fees for Option $0.00
| Other Year 2:_____________________________________ | 1 | $0.00 |
| Year 3 | 1 | $0.00 |
| Year 4 | 1 | $0.00 |
| Year 5 | 1 | $0.00 |
| Year 6 | 1 | $0.00 |
| Year 7 | 1 | $0.00 |
| Year 8 | 1 | $0.00 |
Total - Recurring Fees for Option $0.00
| Other Year 2:_____________________________________ | 1 | $0.00 |
| Year 3 | 1 | $0.00 |
| Year 4 | 1 | $0.00 |
| Year 5 | 1 | $0.00 |
| Year 6 | 1 | $0.00 |
| Year 7 | 1 | $0.00 |
| Year 8 | 1 | $0.00 |
Total - Recurring Fees for Option $0.00 image2.png