This document is a comprehensive electrical power riser and one-line diagram for the South Airport Garage project at Orlando International Airport, prepared by HKS Architects, Inc. for the Greater Orlando Aviation Authority (GOAA). The detailed technical drawing provides a schematic representation of the electrical distribution system, including generator configurations, automatic transfer switches (ATS), transformers, and electrical room layouts across multiple levels of the parking garage. The diagram includes key technical specifications such as voltage ratings, circuit breaker capacities, short circuit values, and priority sequencing for emergency power loads.

The electrical system design incorporates a 500kW generator with a separately derived system, multiple electrical rooms with high-voltage equipment, and a complex load management strategy. The system includes provisions for critical branches, life safety circuits, and emergency power distribution with specific transfer times for different priority loads. Notably, the design includes multiple electrical rooms across different garage levels, transformer specifications from Orlando Utilities Commission (OUC), and detailed metering and monitoring capabilities with data concentration and protocol conversion between Modbus and BACnet systems. The documentation reflects a sophisticated approach to electrical infrastructure planning, emphasizing redundancy, emergency preparedness, and detailed load management for the airport parking facility.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

�� ������������������������ ������!"#"$%&�'()$�*+ *,-./01�*-234-5�677

81179("":0-:;79<4-;;<-,4":;79";779"=/>;77?@/=/,"@5A/B<81:2C@AD!/00'E;FG'0H%#)$;IHA$>;/0)#;II'> ='"'

Garage A Level 1 (R1)

= Electrical wall panels that serve the old garage areas and are located at the same places on each level of Garages A & B.

jennifer.seyfried Text Box jennifer.seyfried Line jennifer.seyfried Text Box jennifer.seyfried Line jennifer.seyfried Text Box Electric jennifer.seyfried Text Box jennifer.seyfried Line jennifer.seyfried Line

Michele Text Box

Michele Text Box

Michele Text Box

Michele Text Box

GARAGE A - LEVEL 4 (P2)

1111 PARKING SPACES

= Electrical wall panel that serves Levels 4-6 in the new garage area.

Another electric panel is located in the same place on Level 2 that serves Levels 1-3 in the new garage area.

Michele Text Box

�� ������������������������ ������!"#"$%&�'())�*+ *,-./01�*-234-5�677

81179("":0-:;79<4-;;<-,4":;79";779"=/>;77?@/=/,"@5A/B<81:2C@AD!/00'E;FG'0H%#)$;IHA$>;/0)#;II'> '"'

Garage B Level 1 (R1) jennifer.seyfried Line jennifer.seyfried Line jennifer.seyfried Text Box jennifer.seyfried Text Box jennifer.seyfried Line jennifer.seyfried Text Box jennifer.seyfried Line jennifer.seyfried

H Y

A T

T

D

R O

P O

F F

SLOW

X X

X

X

X

X

X

X

X

18.1 19 20 21 22 23 24 251817

D

G

F

G

E

G

K.5

G

J

O

M

P

Q

R

L

K

TERMINAL TOP LEVEL 4

NOTE: The 2 electrical rooms circled in blue are stacked and in the same locations on Levels 4-10. The 2 blue boxes near the crossover bridges are available electrical rooms that are only on Level 4.

There are no available electrical rooms on Level 11.

Michele Rectangle

Rectangle

UP

DOWN

DOWN

UP

16 16.5 17 18

18.1

19 20 21 22 23 24 25

E

F

J

G

K.5

M

P

Q

O

H.1

K

L

TERMINAL TOP LEVEL 10

NOTE: The layout of the electrical rooms is slightly different than Levels 4-9.

MAINTENANCE DEPARTEMT – ELECTRICAL

ELEVATORS

C1 C2 C3

C6 C5 C4

C Terminal

ITF BUILDING

ELEVATORS

C7 C8 C9

ENTRANCE

ELECTRICAL

RMS.

SPCN ZCR -01 -

1352- ELECTR.

1349- ELECTR.

1346- ELECTR.

1343-FIRE PUMP

SPCN ZCR -01 –

1514- ELECTR.

1513- ELECTR.

1512- MECH.

SPCN ZSO -01 –

1833-RISER

1834-IDF TENT.

1836-IDF GOAA

1837- MECH.

1838- ELECT.

SPCN ZSO -01 -

1685- MECH

OUC XFMRS

1.GTFEMSB1

2.336H212P 3.336H213P

1ST LEVEL C1

CAT 500KW – S6926

ZONE 615

LUIS MONTOYO- ELECTRICAL CONTRACTS COORDINATOR REVISED 05082023

UP

D O W

N EXIT

U P

RM. 1514

SGEMSB1

SGEH1DP2

SGEH1C

SGEQH1C

SGEXL1DP1

SGEQH1DP2

SGEQLID

ATS C4,C5,C6

ATS C7,C8,C9

RM. 1349

SGH1DP1

SGH1DP2

SGH1DP3

SGH1A

SGL1A

RM. 1346

SGECH1DP1

SGEQH1DP1

SGEXH1DP1

SGEH1DP1

SGEQHIA

SGEH1A

SGEL1A

ATS-SGE1

ATS-SGEC1

ATS-SGEQ1

ATS-SGEX1

RM. 1352

SGEXH1DP2

SGEXLIA

UPS-SG1A

RM. 1836

SGEXL1C

SGL1D

RM. 1838

SGEH1B

SGH1B

SGEQH1B

SGEQL1C

SGL1C

RM. 1834

SGEXL1D

RM. 1673

SGEXL1B

SGL1B

SGEQL1B

1ST PHASE

2ND PHASE

OUC 3351403P

10618 JEFF FUQUA

RM. 1513

SGNMSB1

SGH1DP4

SGH1C

SGL1DP1

SGL1F

SGEMSB1

OUC-148560

336H206P

OUC 154364

METER 10400

JEFF FUQUA BLVD

NOTE: Available electrical rooms are circled in blue.

Most have only high-voltage.

C GARAGEC GARAGE

MAINTENANCE DEPARTEMT – ELECTRICAL

ELEVATORS

C1 C2 C3

C6 C5 C4

ITF BUILDING

ELEVATORS

C7 C8 C9

ENTRANCE

SPCN ZCR -

ELECT. RM. 3511

SGEQL3B

SGEQL3C

SGEQL3D

SGL3B

3rd LEVEL C3 C Terminal

LUIS MONTOYO- ELECTRICAL CONTRACTS COORDINATOR REVISED 05082023

UP

DOWN

SPCN ZSO -

ELECT. RM. 3682

SGEQH3A

SGEQL3A

SGEH3A

SGH3A

SGL3A

SGEL3A

1ST PHASE

2ND PHASE

LUIS MONTOYO– ELECTRICAL CONTRACTS COORDINATOR 10/16/2019

LUIS MONTOYO– ELECTRICAL CONTRACTS COORDINATOR LUIS MONTOYO

R1

R2

P1

P2

P3

DPAHA

West end Center East end

Electrical rm.

01-1591

Electrical rm. 01-1073

West End

R1

R1

R2

P1

P2

P3

1LA

2LA

3LA

4LA

5LA

5LB

4LB

3LB

2LB

1LB

ANE QTA bldg. Dollar/Thrifty bldg.

LA HA

DPHA

H1PGA

1LPGA

LPPB

HB LB

HPGB

L2GBE-2

L2GBW-2

L4GBW-2

H2GBW2

H4GBW2 H4GBE2

H2GBE2

BDTH

BDTL BDTLA

Panel A BVBH BVBL BVBLB

R1

R1

RAC-B RAC-B2

P4

6LA 6LB P4

1MA1 1MA2

DPGB

LPUB

GPB

BPB1 BPB1

NSGPGA

L4GBE-2

LPGB

DPA

DPA

Elevators

B1-B4 ATS

Elevators

B5-B8 ATS

LC LD

HC HL

ESBPGA ESBPGA

DISC.

ESBPGA

ATS

HPAE EDPA

EL1GAE

EH1GAE

EH4GAE

EL4GAE EL4GAW

EH4GAW

EH1GAW

EM1GA

PANEL AL

A SIDE

TICKET

SPITTER

2AWLE 2AELE

OUC

3311105P

OUC

3311106P

150KVA

EL1GAW

EL3GAE

West end West end

To EDPA To EDPA

A PARKING GARAGE ONE LINE DIAGRAM

NATIONAL

RENTAL CAR

AW

To EDPA

DA

AE To EM1GA

EAST PENTHOUSE WEST PENTHOUSE

LUIS MONTOYO– ELECTRICAL CONTRACTS COORDINATOR B GARAGE ONE 09/30/2019

LUIS MONTOYO– ELECTRICAL CONTRACTS COORDINATOR B GARAGE ONE LUIS MONTOYO

R2

P1

P2

P3

DPBHA

West end Center East end

Electrical room

01-1074

West End

R1

R1

R2

P1

P2

P3

1LA

2LA

3LA

4LA

5LA

5LB

4LB

3LB

2LB

1LB

ANE QTA bldg. Dollar/Thrifty bldg.

Avis/Budget bldg.

BLC BLB

BHB BHA ANEB

H1PGB

1LPGB

LPPB

BPB3 BPB4

HPGB

L2GBE-2

L2GBW-2

L4GBW-2

H2GBW2

H4GBW2

H4GBE2

H2GBE2

BDTH

BDTL BDTLA

Panel A

BVBH

BVBL BVBLB

R1

RAC-B RAC-B2

P4

6LA

6LB

P4

1MB1 1MB2

DPGB

LPUB

GPB

BPB1

NSGPGB

L4GBE-2

LPGB

DPB

DPB1

Elevators

B1-B4 ATS

Elevators

B5-B8 ATS

OUC

3321101P

OUC

3321102P

ESBPGB

DISC.

ESBPGB

ATS

ESBPGB

BOARD

EDPB HPBE

XFMR

DISC.

EL3G

BW

EL1T

CBE

EM1

GB

Electrical room 01-1077

West End

Electrical rm.

01-1073

West End

EL4GBW

EL1GBW

EH2GBW-2

EH4GBW-2 EH4GBE-2

EH2GBE-2

EL1GBE

EL4GBE EH4GBE

EH1GBE EH1GBW

E

EH4GBW

E

DB

ELPHGBW

(BW)

ELPHGBW

(BW)

NATIONAL

RENTAR

EAST PENTHOUSE WEST PENTHOUSE

GARAGE ONE-LINE RISER DIAGRAM

ATS-SGEC1

800A

4 POLE

ATS-SGEQ1

400A

4 POLE

ATS-SGEX1

400A

4 POLE

225A

ENCL.

C.B.

(35,000 AIC)

(9,523 SCA)

NEMA 1

WIREWAY

G

800A

GEN-SG1

277/480V, 3P, 4W

500KW, 80%PF

EL-1A

(75HP

95FLA)

UPS-SG1

GFR

SPD

75 KVA

T-SG3A

#2

SGL3A

75 KVA

T-SGEX1B

#2

SGEXL1B

SGEXL2D SGEXL5B

OUC XFMR

OUC-S5

12.47kV PRI.

2000kVA 5.5%Z

480V/277V 3-PH, 4W

DEMAND

LOAD 603A

NOM. 120KVA

480V 3PH, 3W + G

INPUT & OUTPUT,

30MIN RUN TIME

100 100

75 KVA

T-SG1A

#2

SGL1ASGH1A

30 KVA

T-SGE1A

#6

SGEH1A SGEL1A

75 KVA

T-SGEX1A

#2

SGEXL1A

SGEXL2A SGEXL2E

100 225A

100 100

100 100

50 50

150 50

200AR

NFAF

EPO

EPO

ST

EPO

200HP

FIRE PUMP

8 7

#3/0

N G

(AIC 18,000)

(SCA 5,437)

(AIC 10,000)

(AIC 10,000)

(SCA 3,273)

(AIC 10,000)

(SCA 2,849)

(AIC 10,000)

(SCA 2,849)

(AIC 10,000)

(SCA 2,849)

(AIC 18,000)

(SCA 13,098)

(AIC 18,000)

(SCA 12,862)

(AIC 18,000)

(SCA 9,667)

(AIC 10,000)

(SCA 955)

(AIC 10,000)

(SCA 3,266)

(AIC 10,000)

(SCA 3,266)

(AIC 10,000)

(SCA 3,266)

KEY NOTES:

GENERATOR IS A SEPARATELY DERIVED SYSTEM WITH NEUTRAL TO GROUND BOND.

PROVIDE NEMA 1 WIRE BOX WITH BOLT OB COVER GUTTER FOR EMERGENCY CIRCUIT BREAKERS. SIZE PER NEC. LENGTH AS REQUIRED.

CONNECT TO GROUND LOOP CONDUCTOR. REFER TO GROUND RISER DIAGRAM.

BUSSED NEUTRAL TO GROUND BOND BY EQUIPMENT MANUFACTURER EQUAL TO 12.5% OF LINE SIDE CONDUCTORS. CONNECT GROUND

CONDUCTOR TO PRIMARY GROUND BUS. REFER TO GROUND RISER DIAGRAM.

PROVIDE NEMA 1 WIRE BOX WITH BOLT ON COVER. SIZE BOX PER NEC. LENGTH AS REQUIRED.

SERVICE ENTRANCE LISTED FIRE PUMP CONTROLLER BY DIV 21. ELECTRICAL CONNECTIONS BY DIV 26.

PROVIDE 3/4" DEDICATED CONDUIT WITH CONTROL WIRING FROM THE FIRE PUMP CONTROLLER TO THE GENERATOR. CONTROL WIRING

PER GENERATOR AND CONTROLLER SPECIFICATIONS.

PROVIDE 1" CONDUIT WITH CONTROL WIRING FROM THE AUTOMATIC TRANSFER SWITCHES (ATS) TO THE GENERATOR. CONTROL WIRING

PER GENERATOR AND ATS SPECIFICATIONS.

PROVIDE 120V SHUNT TRIP CIRCUIT WIRED TO WEATHER PROOF, MUSHROOM HEAD, EMERGENCY STOP BUTTON STATION. THE BUTTON SHALL BE RED IN COLOR AND PUSH IN, TWIST TO RELEASE TYPE. REFER TO PLAN DRAWINGS FOR LOCATION.

PROVIDE 2 EMERGENCY POWER OFF BUTTON STATIONS PER GENERATOR SPECIFICATIONS. ONE SHALL BE LOCATED AT THE GENERATOR AND THE OTHER SHALL BE AT THE SERVICE ENTRANCE OF THE GARAGE. REFER TO PLAN DRAWINGS FOR GARAGE MOUNTED LOCATION.

DISCONNECT AND TRANSFORMER PROVIDED BY ORLANDO UTILITIES COMMISSION (OUC). COORDINATE INSTALLATION WITH OUC.

ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR THE BALANCE OF THE INSTALLATION INCLUDING BUT NOT LIMITED TO PADS AND

PRIMARY CONDUIT.

PROVIDE UPS WITH INTERNAL AND EXTERNAL MAINTENANCE BYPASS. CONFIRM MODEL AND RUNTIME WITH GOAA IT DEPARTMENT.

PRIORITY 1 ATS. LOAD SHEDDING PROHIBITED.

PRIORITY 2 & 3 ATS LOAD SHEDDING SHALL BE PROGRAMMED TO TRANSFER BACK TO UTILITY IN CASE OF A GENERATOR OVERLOAD.

SGEXL7A

(AIC 10,000)

(SCA 3,266)

SGEXL5A

(AIC 10,000)

(SCA 3,266)

SGEXL5C

(AIC 10,000)

(SCA 3,266)

50 60

SGEXL5D

(AIC 10,000)

(SCA 2,849)

SGEXL2C

(AIC 10,000)

(SCA 2,849)

RUNTIME

FUEL REQUIRED

TANK SIZE

25.7 GAL/HR

FUEL REQUIREMENTS:

HOURS

GALLONS

CONSUMPTION RATE (3/4 LOAD)

GALLONS

SEPARATELY

DERIVED SYSTEM

SGEXL2B

(AIC 10,000)

(SCA 3,266)

PACKAGED MINI POWER ZONE

FOR GEN AUX CIRCUITS

PROVIDED AS PART OF THE

GENERATOR

30KVA, 3 PHASE 480V TO

120/208V

ONE-LINE NOTES:

1. THE ONE LINE DIAGRAM IS A SCHEMATIC REPRESENTATION OF THE ELECTRICAL DISTRIBUTION SYSTEM. REFER TO PLAN DRAWINGS FOR LOCATION OF ELECTRICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO SWITCHBOARDS, PANELBOARDS, GENERATORS, DISCONNECTS, TRANSFORMERS, ETC.

2. TAKEOFFS OF CABLE LENGTHS SHALL BE TAKEN FROM PLAN DRAWINGS.

3. SHORT CIRCUIT VALUES HAVE BEEN CALCULATED BASED ON ASSUMED UTILITY TRANSFORMER SIZE CONNECTED TO AN INFINITE BUS. THIS IS A CONSERVATIVE ESTIMATE AND ACTUAL VALUES MAY BE LESS

THEN LISTED.

4. AIC AND WSR OF ELECTRICAL EQUIPMENT SHALL MATCH ONE LINE DIAGRAM. NO SERIES RATINGS ARE

PERMITTED.

5. VERIFY BOTH THE ONE-LINE DIAGRAM AND PANEL SCHEDULES PRIOR TO BIDDING. REPORT ANY

DISCREPANCIES TO THE ENGINEER OF RECORD.

6. REFER TO GROUND RISER DIAGRAM FOR DETAILS ON THE GROUNDING / BONDING OF THE ELECTRICAL

DISTRIBUTION SYSTEM.

7. ALL BRANCH CIRCUIT PANELS SHALL HAVE SELF PROTECTING SURGE SUPPRESSORS DIRECTLY

CONNECTED TO THE BUS UON.

FUTURE FUTURE

DEMAND

LOAD 2138A

FUTURE FUTURE

7.5HP

AHU-1

VFD

BOND NEUTRAL TO GROUND

ON THE TRANSFORMER SERVICE

SIDE. 1/0 CONDUCTOR WITH FACTORY

INSTALLED N-G BOND.

TO OUC PRIMARY CKT

141414

DATA CONCENTRATOR/

PROTOCOL CONVERTER

DC/PC

MODBUS

BACNET

TO BAS

METERING NOTES:

CIRCUIT BREAKER WITH BUILT IN METERING

CAPABILITY OR STAND ALONE METER. REFER TO

SPECIFICATION SECTION 26713 FOR

REQUIREMENTS.

PROVIDE DATA CONCENTRATOR AND PROTOCOL

CONVERTER. DATA CONCENTRATOR SHALL

RECORD AND AGGREGATE METER POINTS.

PROTOCOL CONVERTER SHALL CONVERT POINTS

FROM MODBUS TO BACNET. CONTRACTOR TO

PROVIDE A LIST OF MAPPING ADDRESSES FOR

THE BACNET SIDE OF THE CONVERTER.

COORDINATE PHYSICAL LAYER WITH BUILDING

AUTOMATION CONTRACTOR.

A

B

MA

MA

MA

MA

B

3/0

N G

3/0

N G

3/0

N G

1 1 1

FIRE PUMP CONTROLLER

400A

PANEL NOTES:

PREFIX.

E

EC

EQ

EX

DEFINITION

LIFE SAFETY

CRITICAL BRANCH

EQUIPMENT BRANCH

LEGALLY REQUIRED

4AWG

N

G

3 SETS OF

4-500KCMIL, 1-

250KCMIL GND,2

3 SETS OF

4-500KCMIL, 1-

250KCMIL GND, 4"C.

INDICATES CONCRETE-

ENCASED CONDUIT (TYP.)

800A

ENCL.

C.B.

400A

ENCL.

C.B.

400A

ENCL.

C.B.

400A

ENCL.

C.B.

SPARE

SPD

FUTURE

SPD

200A

ELEV.

CNTRLR.

ELEV.

CNTRLR.

ELEV.

CNTRLR.

200A 200A

3#1/0, 1#6

GND, 2"C.

3#1/0, 1#6

GND, 2"C.

EL-1B

(75HP

95FLA)

EL-1C

(75HP

95FLA)

LOCATED AT

ELEV.

CONTROLLER

(TYP. 3)

COOPER BUSSMAN POWER MODULE SWITCH, 200A, WITH 120V SHUNT TRIP, FIRE SAFETY INTERFACE RELAY, FIRE ALARM VOLTAGE MONITORING RELAY, KEY TO TEST SWITCH, OR APPROVED EQUAL.

15 2

15 15

100 150

4# 2, #6

G N

D

1- 1/

2" C

MA

SPD

3#4/0, 1#4

GND,

2-1/2"C.

SPD

3#3/0, 1#4

GND,

2-1/2"C.

FUTURE

FUTURE

125 125

SPD

MAJOR LOADS ARE INDICATED ON ONE-LINE DIAGRAM FOR PANEL. REFER TO PANEL SCHEDULE FOR

ADDITIONAL BREAKERS FOR MINOR LOADS, SPARES, AND SPACE REQUIREMENTS.

4#1/0, 1#6 GND,

2"C.

4#6, 1#8 GND,

1-1/4"C.

4-250KCMIL,

1#2 GND,

3"C.

4-250KCMIL,

1#2 GND,

3"C.

4-250KCMIL,

1#2 GND,

3"C.

800MA

400 800

SPD

FUTURE

ST 500MA

SPD

400 400 400

SPD

ST

MA

2 SETS OF

4-350KCMIL, 4"C.

2 2 SETS OF

4-350KCMIL, 4"C.

2 SETS OF

4-600KCMIL, 4"C.

3-500KCMIL,

1#2/0 GND

4"C.

3-500KCMIL,

1#2/0 GND

4"C.

NON-SEPARATELY

DERIVED SYSTEM

4 4

CONCRETE-

ENCASED UP TO

BLDG SLAB

ATS-SGE1

225A

4-POLE

4#4/0, 1#2 GND,

2-1/2"C.

4# 3/

0, #6 G

N D

2"

C

3# 1, #6

G N

D

2" C

3#1, 1#6

GND, 2"C.

4#1, 1#2 GND,

2"C.

4-600KCMIL, 1-

250KCMIL GND, 4"C.

2 SETS OF

4-600KCMIL, 1-

250KCMIL GND, 4"C.

2 SETS OF

4-600KCMIL, 1#1/0

GND, 4"C.

4-600KCMIL, 1

#2 GND, 4"C.

3# 1, #6

G N

D , 2

"C

3# 1, #6

G N

D , 2

"C

3#1, 1#2 GND,

1-1/2"C.

3#1, 1#1 GND,

1-1/2"C.

4# 2, #6

G N

D

2" C

2 SETS OF

4-600KCMIL, 1#1/0

GND, 4"C.

4-600KCMIL,

1#2 GND, 4"C.

4# 3/

0, #4 G

N D

2-

1/ 2"

C

3#1, 1#6

GND, 2"C.

SGEL3A

4#2, 1#6 GND,

2"C.

3# 1, #6

G N

D

2" C

4-

0K C

M

IL

, 1 #2

G N

D , 4

"C

S

E T

S O

F 4-

0K

C M

IL

, 1

#1 /0

G N

D , 4

"C

4-

0K C

M

IL

, 1 #2

G N

D , 4

"C

ADDED CONNECTING LINES BETWEEN EQUIPMENT4

4#4/0, 1-250KCMIL

GND, 3"C.

4#4/0, 1#2 GND,

2-1/2"C.

100 100

FUTURE

400 400 5

FUTURE

FUTURE

SGEQH1A

SPD

SGL1B

(AIC 10,000)

125A

4#6, 1#6 GND,

1-1/4"C.

3#8, 1#10 GND,

1"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

4#6, 1#8 GND,

1-1/4"C.

SGEQH3A

30 KVA

T-SGEQ1B

#6

SGEQL1B

(AIC 10,000)

(SCA 955)

SGEQL3A

4#2, 1#6 GND,

2"C.

16 16

4-

0K C

M

IL

, 1 #2

G N

D , 4

"C

4#1, 1#2

GND, 2"C.

3-

0K C

M

IL

, 1 #1

G N

D , 4

"C

3-600KCMIL, 1

#1 GND, 4"C. 5

SGH3A

4#2, 1#6 GND,

2"C.

100A

SGEH3A

(AIC 18,000)

4#6, 1#6 GND,

1-1/4"C.

4#3/0, 1#6

GND, 2"C.

SPD

SPD

SPD

3#8, 1#10 GND,

1"C.

GENERATOR PRIORTY SEQUENCE

LOAD DESCRIPTION PRIORITY

ALLOWABLE

MAX. TRANSFER

TIME

ATS-SGE1/ SGEH1DP1 1 10 SEC.

FIRE PUMP 1 60 SEC.

2 2 MIN.

ATS-SGEC1/ SGEC1DP1

ATS-SGEX1/ SGEX1DP1

ATS-SGEQ1/SGEQ1DP1 3 10 MIN.

BATTERY

CABINET UPS CABINET

BY-PASS

CABINET

200A

200A

200A

350A

175A

175A

175A

175A

G G G

4#2, 1#6 GND,

2"C.

30 KVA

T-SGEQ3A

#6

3#8, 1#10 GND,

1"C.

SGL3A1

4#2,1#6 GND,

2"C.

100A

(AIC 10,000)

Wayne Edward Allred, P.E.

Florida License #45800

Seal

WS-100

SOUTH AIRPORT

GARAGE

HKS Architects, Inc.

225 East Robinson St., Suite 405 Orlando, Florida 32801 407-648-9956

#AA F000119

D A

T E

T

E M

P L A

T E

V E

R S

IO

N

GREATER ORLANDO AVIATION AUTHORITY

Drawing Scale:

Issue Date:

Checked By:

Drawn By:

Designed By:

Project No.:

Drawing Title:

Key Plan

Revisions

Garage and Landscape Architects:

Baker Barrios Architects 189 South Orange Ave., Suite 1700 Orlando, Florida 32801 407-926-3000

#AA 0002981

#LC 26000427

Prime Architect:

Civil Engineering:

Atkins North America, Inc.

482 South Keller Rd.

Orlando, Florida 32810 407-647-7275

Garage Structural Engineering:

Walker Parking Consultants 4904 Eisenhower Boulevard, Suite 150 Tampa, Florida 33634 813-888-5800

APM / ITF / PDL

CEP / NTS Structural Engineering:

Walter P. Moore Engineers & Consultants 300 South Orange Ave., Suite 875 Orlando, Florida 32801 407-418-2218

Mechanical, Plumbing & Fire Protection:

Matern Professional Engineering, Inc.

130 Candace Drive Maitland, Florida 32751 407-740-5020

Electrical & Low Voltage Systems:

TLC Engineering for Architecture, Inc.

255 South Orange Ave., Suite 1600 Orlando, Florida 32801 407-841-9050

COA 15 TLC NO: 113001

ORLANDO

INTERNATIONAL

AIRPORT

BID DOCUMENTS

TO THE BEST OF THE ARCHITECT’S AND ENGINEER’S KNOWLEDGE,

THESE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE

MINIMUM BUILDING CODES AND THE APPLICABLE FIRE-SAFETY

STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN

ACCORDANCE WITH FBC SECTION 110.3.7 AND CHAPTER 633 OF THE

FLORIDA STATUTES.

/8

/2

:4

:1

P M

12" = 1'-0"

E-4.00.00

POWER RISER

DIAGRAM

07/30/14

120339.01

AJL

MES

WTJ

12" = 1'-0"

ONE-LINE RISER DIAGRAM

NO. DATE DESCRIPTION

1 3/06/2015 Permit Responses

2 5/12/2015 Permit Responses

3 7/17/2015 Permit Responses

4 08/28/2015 Permit Responses

5 09/15/2015 GMP5 BP-S104 BULLETIN 8

6 10/09/2015 GMP5 BP-S014 BULLETIN 9

7 11/18/2015 GMP5 BP-S104 DSI #02

8 05/31/2016 GMP5BP-S104 RFI 0208

9 06/22/2016 GMP5 BP-S104 RFI 0228

10 06/08/2017 GMP5 BP-S104 BULLETIN 25

11 06/08/2017 GMP5 BP-S104 RFI 0228R1

C GARAGE

Terminal Top Garage Electrical Drawings.pdf
Sheets and Views
d196964f-0981-4fbf-ab03-fec38deccc25-Layout1
XLS05_TTP_Civ.pdf
Sheets and Views
bb42fd82-4806-41c9-9da6-18a7e97cd4ad-Layout1
XLS10_TTP_Civ.pdf
Sheets and Views
9ae4c1b9-486a-4b02-a32a-73fc3dd36430-Layout1
Untitled
Untitled
Untitled

File details come from the government source that posted it. Updated .