Exhibit_A_-_Locations_and_Equipment.pdf

PDF 87 KB Posted

Attached to
Anchor Points Inspections, Testing, and Repair
Solicitation number
IFB-27-0458
Issued by
Maricopa County, Phoenix City, Arizona

About this file

Exhibit A is a location and equipment schedule supporting the City of Phoenix's solicitation for anchor points inspections, testing, and repair services across multiple Water Services Department (WSD) facilities in Arizona. The contract encompasses inspection, testing, and repair services for anchor sockets located at wastewater treatment plants, water treatment plants, and lift stations. The scope includes 23rd Avenue WWTP in Phoenix with 16 anchor points across multiple equipment locations; 91st Ave. WWTP in Tolleson with 1,100 anchor points distributed across four clarifier systems; Union Hills WTP in Phoenix with 32 anchor points at backwash retention basins, reservoir areas, and lift stations (LS-64, LS-66, LS-44); and additional lift stations with quantities subject to change. The City retains the right to add, modify, or remove equipment, locations, and related services as needed without contract amendment.

The pricing structure for the contract is based on per-inspection, per-testing, and per-repair rates rather than by individual location, allowing the City flexibility to adjust service locations without affecting the established pricing. The contract term and specific commencement date will be determined by Phoenix City Council approval, with the effective date occurring upon final signature and recording by the City Clerk's department. The solicitation is available through the City of Phoenix's Procurement Portal, with technical support available through the portal or via procurement-support@opengov.com. Location assignments are subject to change throughout the contract term without requiring formal amendment, and the contract will terminate upon completion of the term, exercise of extension options (if applicable), or earlier termination per contract provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A - LOCATIONS AND EQUIPMENT

Anchor sockets requiring inspection and/or repair may be located at the following WSD facilities, including but not limited to wastewater treatment plants, water treatment plants, and lift stations.

SITE LOCATION

ANCHOR POINT

QUANTITY

ANCHOR POINT EQUIPMENT LOCATION

DESCRIPTION

23rd Avenue WWTP 2470 South 22nd Ave.

Phoenix, AZ 85009

Secondary Clarifier Headworks Blow Down Pumps (Vault 2) Influent Pump Station Blow Down (Vault 4) Salt River Outfall Influent Pump Station Inlet Gate

91st Ave. WWTP 5615 South 91st Ave.

Tolleson, AZ 85353

Unified Plant 01 Secondaries Clarifier Plant 3 Secondaries Clarifier Plant 1 Secondaries Clarifier Plant 2B Secondaries Clarifier

Union Hills WTP 2001 E. Deer Valley Rd.

Phoenix, AZ 85024

Backwash Retention Basin Reservoir Area

Lift Stations (LS)

LS-64, LS-66, LS44

(Numbers may vary)

*The City reserves the right to add, modify, or remove equipment, locations, and related services as needed. Pricing structure reflects price per inspection, testing and repair and not location. Location will be subject to change without the need to amend contract.

File details come from the government source that posted it. Updated .