Exhibit_A_-_Insurance_Requirements_26-B-77IF.pdf

PDF 164 KB Posted

Attached to
Daytona Beach International Airport Taxiway P3 and P4 Improvements
Solicitation number
26-B-77IF
Issued by
Volusia County, Florida

About this file

This is an Insurance Requirements exhibit for the County of Volusia, Florida and the Florida Department of Transportation (FDOT) for construction services to improve Taxiway P3 and P4 at Daytona Beach International Airport. The document specifies comprehensive insurance coverage mandates that all contractors, subcontractors, and independent contractors must maintain throughout the project duration. Required coverages include Workers Compensation with waiver of subrogation, Commercial General Liability with per-occurrence limits of $1,000,000 and general aggregate limits of $5,000,000, Auto Liability with combined single limits of $1,000,000, Contractors Pollution Liability with $1,000,000 occurrence and aggregate limits, and an Installation Floater covering all-risk wind, hail, named storm, and flood damage. All policies must name the County of Volusia and FDOT as additional insureds on a primary and non-contributory basis, include waiver of subrogation provisions, and maintain independent contractor coverage with cross-liability provisions. The County requires 10-day advance notification of any cancellation, policy lapse, renewal, or coverage changes.

The insurance requirements prohibit self-insurance and policy retentions, establishing that excess liability coverage must follow form with the general liability policy and provide sufficient limits to meet the $5,000,000 general aggregate requirement if the primary $1,000,000/$5,000,000 limits cannot be obtained. The Installation Floater must cover the full value of the project excluding mobilization and demobilization costs, demolition and excavation expenses, and payment and performance bond premiums. All certificates of insurance must be submitted to the County of Volusia Purchasing & Contracts Division with a requirement for thirty days' written notice of cancellation. These requirements reflect the project's complexity as a federally-funded FAA Airport Improvement Program project with an estimated construction cost of $4,851,000.

View the file

Other files

File Type Posted
Exhibit_L_-_Sheet_G100_Reissued_04.13.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS_OF_SHEET_G100.pdf PDF
Exhibit_K_-_Geotechnical_Report.pdf PDF
Daytona_Beach_International_Airport_Taxiway_P3_and_P4_Improvements_(Addendum_#2_Revision).pdf PDF
Exhibit_C_-_Draft_Contract_26-B-77IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Exhibit_H_-_FAA_Contract_Provision_Guidelines_Issued_3_17_2026_-_REVISED_04.07.2026_-_REPLACES_ALL_PREVIOUS_VERSIONS.pdf PDF
Daytona_Beach_International_Airport_Taxiway_P3_and_P4_Improvements.pdf PDF
Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_26-B-77IF.xls XLS spreadsheet
Exhibit_J_-_Sales_Tax_Exemption_Procedures_26-B-77IF.pdf PDF
Exhibit_I_-_FEDERAL_CONTRACT_PROVISIONS_(FEMA)_26-B-77IF.pdf PDF
Exhibit_H_-_FAA_Requirements_26-B-77IF.pdf PDF
Exhibit_G_-_Bid_Price_Sheet_26-B-77IF.xlsx XLSX spreadsheet
Exhibit_F_-_Construction_Safety_and_Phasing_Plan.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Construction_Plans.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-77IF.pdf PDF
Exhibit_A_-_Insurance_Requirements_26-B-77IF.pdf PDF
DAB_TW_P3-P4_Plans.pdf PDF
DAB_TW_P3-P4_ProjectManual.pdf PDF
DAB_TW_P3-P4_CSPP.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_.xls XLS spreadsheet
DAB_TW_P3-P4_PriceSheet_(unlocked_for_Inga).xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPE OF INSURANCE

WORKERS COMPENSATION

Waiver of Subrogation in favor of County & FDOT

Florida Statutory Coverage

COMMERCIAL GENERAL LIABILITY

Occurrence Basis Project specific policy limits ISO Form CG 00 01 Required Contractual Liability County & FDOT Additional Insureds for both

Premises & Operations and Products & Completed Operations.

Coverage provided to all Additional Insureds on a primary & non-contributory basis with any other insurance policy(ies) available to or maintained by any or all Additional Insureds.

Waiver of Subrogation in favor of County & FDOT XCU Coverage Independent Contractors 10 day notification to County of cancellation, notice of cancellation, lapse, renewal, or policy coverage change.

Self-Insurance Prohibited Policy Retentions Prohibited

EACH OCCURRENCE $ 1,000,000

GENERAL AGGREGATE $ 5,000,000

Premises-Operations $ 1,000,000

Products & Completed Ops $ 1,000,000

Personal & Adv Inj. $ 1,000,000

Fire Damage $

AUTO LIABILITY

Any Auto Contractor, its subcontractors & independent contractors shall name County & FDOT Additional Insureds

Subcontractors & independent contractors shall maintain same policy limits, terms, conditions required of general contractor Waiver of Subrogation in favor of County & FDOT Primary & Non-contributory with any insurance or self-insurance maintained by additional insureds.

Combined Single Limit $ 1,000,000

Note: If contractor does not have “Coverage Symbol 1: Any Auto”, Contractor is limited to use of covered autos only.

EXCESS LIABILITY

Follow-form General Liability County & FDOT Additional Insureds Waiver of Subrogation in favor of County & FDOT Primary & Non-contributory with any insurance or self-insurance maintained by additional insureds.

If CGL $1,000,000/Occurrence, $5,000,000/ General Aggregate policy limits requirement cannot be obtained, Excess policy shall be purchased with sufficient limits to meet the $5,000,000 General Aggregate requirement.

Note: If County & FDOT cannot be added as additional insureds, then policy shall be endorsed to provide additional insured status for each if required on the primary policy.

CONTRACTORS POLLUTION LIABILITY

County & FDOT Additional Insureds.

Waiver of Subrogation in favor of County & FDOT Primary & Non-contributory with any insurance or self-insurance maintained by additional insureds.

$1,000,000 Occurrence/Aggregate

INSTALLATION FLOATER

County as Additional Loss Payee All-Risk Wind, Hail, Named Storm Flood required if projected located in FEMA Special Flood Hazard Area.

Value of Project Excluding Cost of:

Mobilization/Demobilization

Demolition/Excavation

Payment/Performance Bond

CANCELLATION: Thirty (30) days written notice of cancellation is required to the Certificate Holder:

Certificate Holder:

County of Volusia Purchasing & Contracts Division 123 W. Indiana Avenue, Room 302 DeLand, FL 32720

ATTN: Inga Fegley

Risk Management Division

File details come from the government source that posted it. Updated .