Exhibit_A_,_Insurance_Requirements-_26-B-55JS_.pdf

PDF 148 KB Posted

Attached to
Deland Regional Library Play Yard Walkway
Solicitation number
26-B-55JS
Issued by
Volusia County, Florida

About this file

This is an Insurance Requirements exhibit for Invitation for Bid (ITB) No. 26-B-55JS issued by Volusia County, Florida for the Deland Regional Library Play Yard Walkway construction project. The project involves construction of site improvements and a minor building renovation to create an ADA-compliant outdoor playground facility at 130 East Howry Avenue in DeLand, Florida. The scope includes demolition of approximately 6,700 square feet of existing concrete and asphalt paving, construction of a 5-inch thick reinforced concrete playground slab (approximately 4,800 square feet), installation of 6-foot high aluminum fencing with gates, a 42-inch high aluminum guardrail, new concrete sidewalks, landscape restoration with Bahia sod, and replacement of a hollow metal steel door with a new aluminum/glass storefront door. A non-mandatory pre-bid meeting is scheduled for March 12, 2026 at 9:00 a.m., with written questions due by March 19, 2026 at 11:59 p.m. and responses provided by April 2, 2026 at 3:00 p.m. Bids are due April 2, 2026, with substantial completion required within 150 days and final completion within 180 days of the Notice to Proceed. The estimated construction cost is $250,000, and liquidated damages of $250 per day are assessed for delays beyond the substantial completion date.

The contract requires the prime contractor to obtain comprehensive insurance coverage including Workers Compensation with Florida statutory coverage and waiver of subrogation; Commercial General Liability with minimum limits of $1,000,000 per occurrence and $2,000,000 general aggregate with the County named as additional insured; Auto Liability with combined single limits of $1,000,000; and Installation Floater coverage on an all-risk basis covering the full value of materials and installation costs. Additionally, the prime contractor must provide a bid bond equal to 5 percent of the bid amount and, upon award, secure payment and performance bonds equal to 100 percent of the contract price. The project is funded in part by Community Development Block Grant and Volusia ECHO Grant funding and is subject to federal compliance requirements including Davis-Bacon Act prevailing wage requirements, Copeland Act anti-kickback provisions, Section 3 provisions requiring at least 25 percent of total labor hours be performed by Section 3 workers, and Build America, Buy America (BABA) certification requirements. All bids must remain firm for 120 days after opening, and the contract will be awarded to the lowest responsive and responsible bidder.

View the file

Other files

File Type Posted
Deland_Regional_Library_Play_Yard_Walkway_(Addendum_#1_Revision).pdf PDF
Deland_Regional_Library_Play_Yard_Walkway.pdf PDF
Exhibit_K,_SPECIAL_CONDITIONS_AND_CONSTRUCTION_SIGN-Deland_Library_Play_Yard_Walkway_.pdf PDF
Exhibit_J,_CDBG_Supplemental_Conditions_for_Federal_Projects,_26-B-55JS,_VIEW.pdf PDF
Exhibit_E,_DeLand_Regional_Library_Project_Manual_26-B-55JS.pdf PDF
Exhibit_D,_Construction_Plans_DeLand_Library_Play_Yard_CD_26-B-55JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS,_26-B-55JS,_.pdf PDF
Exhibit_G,_BID_FORM.xlsx XLSX spreadsheet
Exhibit_C,_Draft_Construction_Contract,_26-B-55JS.pdf PDF
Exhibit_A_,_Insurance_Requirements-_26-B-55JS_.pdf PDF
Exhibit_B,_PRIME-SUB_FORM_for_Contractors_26-B-55JS_.xls XLS spreadsheet
Exhibit_I,_Section_3_Information_&_Forms,_26-B-55JS,_REQUIRED_TO_SUBITTED.pdf PDF
Exhibit_F,_BABA_Information_&_Forms,_24-B-55JS_REQUIRED_TO_SUBMITT.pdf PDF
PC4097_DeLand_Library_Play_Yard_CD_10.22.25.pdf PDF
SPECIAL_CONDITIONS_AND_CONSTRUCTION_SIGN-Deland_Library_Play_Yard_Walkway.pdf PDF
Grant-ATP_Package.pdf PDF
PC4097_DeLand_Regional_Library_Project_Manual_10.22.25.pdf PDF
0_Required_Solicitation_Text.pdf PDF
3.0_MWBE_Information_&_Form.pdf PDF
Deland_Regional_Library_Play_Yard_Walkway_-_Prebid_Attendees.docx DOCX document
5.0_BABA_Information_&_Forms.pdf PDF
2.0_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
2.1_WH347_Certified_Payroll_Form_Updated_January_2025.pdf PDF
4.0_Section_3_Information_&_Forms.pdf PDF
1.0_CDBG_Supplemental_Conditions.pdf PDF
6.0_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
2.2_WD_Heavy_FL20250137_12.12.25.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPE OF INSURANCE

WORKERS COMPENSATION

Waiver of Subrogation Florida Statutory Coverage

COMMERCIAL GENERAL LIABILITY

Occurrence Basis Contractual Liability Waiver of Subrogation Primary and non-contributory County Additional Insured (Utilizing both ISO forms

CG 20 37 for products & completed ops and CG 20 38 for premises & operations)

Independent Contractors

EACH OCCURRENCE $ 1,000,000

GENERAL AGGREGATE $ 2,000,000

Premises-Operations $ 1,000,000

Products & Completed Ops $ 1,000,000

Personal & Adv Inj. $ 1,000,000

Fire Damage $

AUTO LIABILITY

Any Auto Contractor, its subcontractors & independent contractors shall name County as Additional Insured Subcontractors & independent contractors shall maintain same policy limits, terms, conditions required of general contractor

Combined Single Limit $ 1,000,000

Bodily Injury (Per person) $

Bodily Injury (Per accident) $

Property Damage (Per Accident) $

Note: If contractor does not have “Coverage Symbol 1: Any Auto”, contractor is limited to use of covered autos only.

INSTALLATION FLOATER

County Additional Loss Payee All-Risk Wind, Named Storm, & Hail

Value of materials and installation costs.

CANCELLATION: Thirty (30) days written notice of cancellation is required to the Certificate Holder:

Certificate Holder:

County of Volusia Purchasing & Contracts Division 123 W. Indiana Avenue, Room 302 DeLand, FL 32720

ATTN: Jalene Serwanski

Risk Management Division