PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Attached to
- Deland Regional Library Play Yard Walkway
- Solicitation number
- 26-B-55JS
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for the Deland Regional Library Play Yard Walkway project in Volusia County, Florida, under Contract No. C-2014 and ITB No. 25-B-##XX. The form requires bidders to disclose all proposed subcontractors and their respective work disciplines, dollar values, and percentages of work allocation for the project. Bidders must list the prime contractor's self-performed work and any subcontractors by discipline (such as electrical, HVAC, plumbing, and landscaping), with provisions for additional subcontractors as needed. The form emphasizes that failure to complete and return it may result in a non-responsive bid, and that any changes to subcontractors during project execution require prior approval from the County Project Manager.
The Deland Regional Library Play Yard Walkway project is a federally assisted construction initiative designed to create an ADA-compliant outdoor playground and open recreational space for children and families. The project is funded in part through a Community Development Block Grant and a Volusia ECHO Grant, and is subject to federal labor standards including the Davis-Bacon Act (prevailing wage requirements) and the Copeland Act (anti-kickback provisions and weekly certified payroll reporting). The prime contractor is responsible for enforcing wage compliance and maintaining supporting documentation throughout the project duration and may be held liable for wage restitution. The form requires that all green-shaded cells be completed with dollar values and work percentages, which must collectively equal 100 percent, while all other cells are automatically calculated. The total bid price submitted on this form must match the Total Bid Price on the associated Bid Form/Bid Price Sheet, and the form will be used to determine local preference in accordance with Section 2.8.D of the solicitation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |