This Exhibit A is a Comprehensive Maintenance Plan (CMP) for Uninterruptible Power Supply (UPS) systems at the United States Embassy in Rome, Italy. The document details preventive maintenance requirements for nine UPS units located across multiple embassy buildings and residences, including the MSB ISC server room, boiler room, transformer room, AV room, embassy power building, USUN building, Villa Taverna, and Grazioli Residence. The UPS systems are primarily manufactured by Eaton, with one Metalyst unit, and include both parallel and single configurations.
The maintenance plan specifies semi-annual and annual preventive maintenance schedules, safety protocols, and contractor responsibilities. Key requirements include providing emergency UPS support within 24 hours, submitting detailed maintenance checklists and reports, using appropriate personal protective equipment, following manufacturer instructions, and supplying original equipment manufacturer spare parts. The contractor must provide troubleshooting manuals, complete maintenance checklists, test and calibration reports, and a narrative summary of findings. Battery replacement is required for two battery types: 12V 9AH and 12V 80AH. The maintenance plan aims to ensure the readiness and proper operation of the UPS systems through comprehensive preventive maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit D - Annual Preventive Maintenance.pdf | ||
| RFQ - 191T7025Q0009.docx | DOCX document | |
| SF-1442 - 191T7025Q0009.docx | DOCX document | |
| Cover Letter - 191T7025Q0009.pdf | ||
| Exhibit C - Semi-Annual Preventive Maintenance.pdf | ||
| Exhibit B - Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A - COMPREHENSIVE MAINTENANCE PLAN
UNINTERRUPTIBLE POWER SUPPLY (S)
I. GENERAL INFORMATION:
The United States Embassy Rome in Italy requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Uninterruptable Power
Supply(s).
II. PROJECT REQUIREMENTS:
The Contractor shall perform preventive maintenance as described in this COMPREHENSIVE
MAINTENANCE PLAN (CMP). The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.
DESCRIPTION OF EQUIPMENT:
The attached equipment list provides details of the equipment to be maintained.
III. GENERAL REQUIREMENTS:
The Contractor shall provide the labor, tools, and materials required to perform all preventive maintenance as outlined in this SOW. Embassy staff have service manuals for uninterruptable power supply on-site. The contractor shall confirm government provided manuals are complete and current and provide the Contracting Officer’s Representative (COR) a listing of any missing or out of date manuals.
IV. SCOPE OF WORK – UPS PREVENTIVE MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use appropriate safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post COR and Occupation Safety and Health Officer (POSHO) immediately. Material Safety
Data Sheets (MSDS) for HAZMAT shall be provided by the Contractor. Copies shall be provided to the COR for approval.
The systems and components to be maintained include UPS module (s), fans, external battery module
(EBM), batteries, circuit breakers, electronic module (s), wiring and auxiliary devices. The attached equipment list provides details.
1. The contractor shall provide the COR with a list of necessary parts and materials.
2. The contractor shall provide emergency assistance for UPS support, priced at an hourly rate, within 24 hrs of being contacted by the COR.
3. The Contractor shall provide the labor, test equipment, tools and materials required to perform all preventive maintenance as outlined in this SOW. Embassy staff may have service manuals for switchgears on-site.
If any discrepancies are found with the uninterruptable power supply(s) that are not covered under this scope of work then the contractor shall provide the following:
1. Detailed report noting the discrepancy found.
2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.
3. The contractor shall provide emergency assistance for UPS support within 24 hours of being contacted by the COR.
4. Price quote for repair labor.
At a minimum, the following work must be done:
SAFETY & SPECIAL INSTRUCTIONS:
1. Use appropriate personal protective equipment (PPE) when performing work
2. Check all work areas, tools, and equipment to ensure unsafe conditions are eliminated or guarded against.
3. Follow site safety procedures.
4. Schedule maintenance with operating personnel and affected offices (security).
5. Follow approved lockout/tag out procedures.
6. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.
7. Review and follow the manufacturer’s instructions.
8. Record results in the equipment history log.
9. Remove lockout/tag out in accordance with appropriate procedures.
10. Report all incidents and near miss incidents to COR and assist as requested in the investigation and corrective action.
At a minimum, the Contractor shall comply with the following:
Notes:
• Contractor shall submit to the COR for review, work sheet/checklist that will be used for performing maintenance service.
• A discrepancy report shall be submitted to the COR immediately upon discovery of any condition that could result in equipment failure.
• Test and inspection report shall be submitted to the COR within three days of completing work.
SCHEDULED MAINTENANCE SERVICES
The purpose of this CMP is to ensure the UPS for this facility are maintained according to manufacturer’s recommendations to ensure the readiness and proper operation of the system.
Before carrying out any kind of service and/or maintenance, disconnect the batteries, verify that no current is present, and no hazardous voltage exists in the capacitor or bus capacitor terminals.
A. Semi-Annual Schedule:
Exhibit C - Semi-Annual Preventive Maintenance
B. Annual Schedule:
Exhibit D - Annual Preventive Maintenance
C. Additional:
The contractor shall supply to post:
• Troubleshooting and repair manuals for UPS (s)
• Discrepancy reports and costs as described in paragraph IV
• Completed maintenance checklist for each uninterruptable power supply
• Applicable test and calibration reports
• Narrative summary of all checks findings, and conditions. Include all input and output voltage, amperage, and frequency readings.
• In case of need for spare parts, these shall be Original Equipment Manufacturer.
UNSCHEDULED AND EMERGENCY MAINTENANCE SERVICES
SPECIALIZED TECHNICIAN
The contractor shall provide fixed hourly rates per labor category which will be used to establish firm fixed price task order.
Each task order shall be issued in advance and priced by multiplying the hourly rates by the number of hours required and adding material cost.
BATTERY REPLACEMENT
The contractor shall provide high quality batteries supply for each UPS as listed below.
BATTERY TYPE
12V 9AH
12V 80AH
EQUIPMENT LIST
EQUIPMENT # LOCATION MANUFACTURER MODEL SERIAL NUMBER ID NUMBER SPECIFICATIONS
UPS 1
MSB ISC server room
Eaton
93PS-20(20)-20-
2x9AH-LL-6
H3121000069 3618 UPS In parallel
UPS 2
MSB ISC server room
Eaton
93PS-20(20)-20-
2x9AH-LL-6
H3121000068 3619 UPS In parallel
UPS 3 MSB Boiler room Metalyst WHAD 3000 N/A 5152 UPS Single
UPS 4
MSB Transformer room
Eaton 9PX 3000iRT3U n/a 6115 UPS Single
UPS 5 MSB AV room Eaton 100 N/A 3621 UPS Single
UPS 6
Embassy Power Building
Eaton 100 ED191CBB07 3620 UPS Single
UPS 7 USUN Building Eaton
93PS-20(20)-20-
2x9AH-LLMBS-6
H3122000040 3622 UPS Single Safe Haven Area
UPS 8 Villa Taverna Eaton 9PX 3000iRT3U
M24WA01598
Medium voltage switchgear
UPS 9 Grazioli Residence Eaton 9PX 3000iRT3U
M24WA01602
Medium voltage switchgear