Exhibit A- CIS AV Layout.pdf
PDF 581 KB Posted
- Attached to
- Audio Visual Hardware & Installation
- Solicitation number
- S-X24129-00011345
- Issued by
- Clackamas County, Oregon
About this file
This document appears to be an exhibit detailing the audio-visual layout for a CIS Collaboration Center project. It provides an overview of the AV components and requirements for various rooms and spaces within the facility, including display screens, cameras, microphones, speakers, and floor boxes for audio/video connectivity. The document outlines the intended use and occupancy capacities for each space, as well as the general notes regarding the display screen sizes, mounting, and power/data requirements. It does not contain information about a state or local contract opportunity, response dates, award details, or pricing terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit C - CIS Bid & Permit Specifications.pdf | ||
| Exhibit C- CIS Bid & Permit Set Drawings.pdf | ||
| AV RFP Addendum Q&A.pdf | ||
| Exhibit B - Construction Schedule.pdf | ||
| Bid Tab~3.docx | DOCX document | |
| CIS AV Consultant RFP 2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD
FD
FD FD
FD FD
FD
A. REFER TO ARCHITECTURAL GENERAL NOTES ON A0.01 FOR ADDITIONAL INFORMATION
B. REFER TO A0.02 FOR WALL TYPES
C. REFER TO A1.13 FOR FINISH SCHEDULE
D. REFER TO FINISH PLAN FOR CASEWORK AND RELATED FINISH INFORMATION
E. EQUIPMENT & FURNITURE SHOWN FOR REFERENCE ONLY
F. REFER TO A6.10 FOR DOOR TYPES & DOOR SCHEDULE
G. ALL PENETRATIONS IN THE WALL INCLUDING OUTLETS, DUCTS AND PIPING SHOULD BE CAULKED
AIRTIGHT WITH ACOUSTICAL SEALANT.
H. INTERIOR PARTITION CONTROL JOINTS PER DETAIL
I. ALL INTERIOR PARTITIONS TO BE P1A UNLESS OTHERWISE NOTED.
GENERAL NOTES
DD
C C
B B
1.1
A A
2 3 4 5 5.2
A2.103
A2.10
A2.10 6
A2.10
A3.10
A3.11
A3.11
A3.11
MECH.
TR
TR
SHOWER
SHOWER
OFFICE
HUDDLE
133B
OFFICE
HUDDLE
OFFICE
HUDDLE
133A
OFFICE
HUDDLE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
IT STORAGE
STORAGE
COPY/WORK
STORAGE
OFFICE
OFFICE
SERVER
RECEPTION
100A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
EXEC. OFFICE
OFFICE
OFFICE
ELECTRICAL
STORAGE
138A
OFFICE
CONFERENCE
HUDDLE
CONFERENCE
MENS
LOBBY
HIGH TECH
COLLAB
OPEN OFFICE
JANITOR
WOMENS
CONFERENCE
STORAGE
CIRCULATION
107 FIRE RISER
160OFFICE
BREAK ROOM
WELLNESS
107E
139A
2 1
0 111
A
138A
107A
C1
B
B
C
139B
108A
10-14
A4.10
A4.10
A4.11
A4.11
A4.12
2' - 8 255/256"
2' - 0"
3' - 0"
2' - 0"
2' - 0"
2' - 9"
5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0"
2' - 3"
2' - 0" 8' - 7" 11' - 10" 9' - 3 3/4" 8' - 2" 14' - 8" 14' - 8" 11' - 0 1/4"
174' - 0"
1' - 0" 36' - 6" 37' - 0" 31' - 0" 34' - 0" 19' - 2" 14' - 4" 1' - 0"
28' - 4" 40' - 0" 20' - 7" 30' - 7" 30' - 0" 24' - 6"
28' - 4" 2' - 6" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 7" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 7" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 2' - 0"
2' - 0"
2' - 0" 5' - 0" 6' - 0"
' - 2
/2
' - 6
' - 0
' - 0
' - 0
' - 0
' - 0
' - 2
' - 0
' - 0
' - 0
/- 1
' - 1
22' - 2" 30' - 0" 30' - 4" 68' - 2"
/4
/4
/4
A L
IG
N
CIRCULATON
161P2E
P2B
P1C
P1BS
P2A
P2A
P1A P2C
P2C
P2C P2C P2C P2C
P2A
P2A
P2C
P2C
P2C
P2E
P1B
P1B
P1B
P2A
P1B
P1B
P2C
P1B
P2D
P1B
P2E
P2C
P1A
P2C
P2B
P2D
P2A
/2
/4
OVERALL
GRID
PANELS
OPENINGS
O V
E R
A L L
G R
ID
P A
N E
L S
O P
E N
IN
G
S
A7.10
A3.10
ROOF ACCESS
A3.11
A3.10
A3.11
P2A
P2F
P2A
/4
O V
E R
A L L
G R
ID
P A
N E
L S
O P
E N
IN
G
S
A2.10
DS DS
A2.10
CLR
5' - 0"
A5.10
A5.10
A5.10
A5.10
A5.10
A5.10
A4.13
MIN
5' - 0" CLR 14' - 4" 7' - 8 1/2" 20' - 3" MIN
5' - 0" CLR 0' - 9"
10' - 1" 10' - 6" 10' - 5"
3' - 9 3/4"
3' - 3" 8' - 0" EQ 8' - 0" EQ 8' - 0" EQ 8' - 0" 3' - 3"
/4
C L R
M IN12' - 8 1/2" 16' - 8" 9' - 9" 9' - 9" 9' - 9" 9' - 1" 10' - 7" 10' - 0" 10' - 1 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 9' - 6 1/2" 14' - 0 1/2"
P1C
P4
3"
3"
/8
ALIGN
/2
M
IN
C L
R
/2
2 1/2"
8' - 2 1/2" 8' - 5 1/2"
/2
ALIGN
/4
9' - 5 3/4"
2' - 3 1/2"
/4
CLR
5' - 0"
13"14"13"
16 1/2"16 1/2"
/2
/4
6' - 6" 4' - 2 3/4" 6' - 9 1/2" 10' - 0 1/2" 14' - 4"
5' - 10"
5' - 5"10' - 1 1/2" 10' - 1"
/8
M
IN
C L
R
/2
12' - 7 1/2"
' - 1
' - 5
/2
90.00°
90.00°
90.00° 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 2' - 10"
/8
/8
7' - 10 1/2"
ALIGN
M
IN
C L
R
/2
ALIGN
/2
A L
IG
N
A L
IG
N
C E
N T E
R
5' - 11 1/2" 12' - 5 3/8" 23' - 3 7/8"
/8
/8
/8
2' - 7"
2' - 7"
A L
IG
N
CLR
6' - 5"
CLR
6' - 5"
DS
DS
RESTROOM
P2B
101A
A0.03
SIM
A L
IG
N
A L
IG
N
/8
A L
IG
N
1 5.1 6
A.1
A4.10
E Q
E Q
05-08
107D
03-01
A0.03
SIM
A L
IG
N
EQ EQ
A0.03
SIM
06-11
09-06
LEGEND
INTERIOR GLAZING
INTERIOR PARTITION - REFER TO A1.20 FOR
WALL HEIGHTS
CONCRETE TILT PANEL WITH INTERIOR
FURRING PER 3/A0.02
EXTERIOR FIBER CEMENT RAINSCREEN
WALL PER 1/A5.11
REFERENCE
ONLY UNLESS
STAMP IS
PLACED
(PLACE STAMP
HERE)
MACKENZIE
ALL RIGHTS RESERVED
THESE DRAWINGS ARE THE PROPERTY OF
MACKENZIE AND ARE NOT TO BE USED
OR REPRODUCED IN ANY MANNER,
WITHOUT PRIOR WRITTEN PERMISSION
SHEET
JOB NO.
SHEET TITLE:
Project
Client
1/18/2024 6:55:03 PMAutodesk Docs://CIS Oregon/098-CIS-V23-A.rvt 1/8" = 1'-0"
A1.10
FLOOR PLAN
30125 SW KINSMAN
ROAD, WILSONVILLE,
OR 97070
CIS - OREGON
2220098.00
Mechanical/Electrical
INTERFACE ENGINEERING, INC.
25117 SW Parkway Avenue, Wilsonville, OR 97070
DESIGN DEVELOPMENT SET 1/19/2024
CIS
COLLABORATION
CENTER
1/8" = 1'-0"A1.10
1 FLOOR PLAN
KEYNOTES
03-01 CONCRETE SEAT WALL
05-08 STEEL FRAMING PER STRUCT.
06-11 CEDAR SOFFIT FINISH CONTINUES DOWN FACE OF WALL
09-06 3FORM SPECIALTY WALL PANEL, RP-2. CHANNEL SET AT FLOOR AND CEILING. REFER TO
ELEVATION 15/A4.21.
10-14 OPERABLE PARTITION WITH PERSONNEL EGRESS DOORS AS SHOWN DASHED
PROJECT
NORTH
REVISION SCHEDULE
Delta Issued As Issue Date segger Cloud+ segger Cloud+ 85" display with camera, sound and mics. Intent is user plugs in laptop to drive "bring your own meeting". Table / floor box will have power and data, HDMI cable to run from display to table for table connection.
segger Rectangle segger Callout Display location segger Text Box 10-12 occupancy segger Text Box 12-15 occupancy segger Cloud+ segger Cloud+ 85" display with camera, sound and mics. Intent is user plugs in laptop to drive "bring your own meeting". Table / floor box will have power and data, HDMI cable to run from display to table for table connection.
segger Rectangle segger Callout Display location segger Cloud segger Text Box Occupancy: 35-40 per side; 72 seated at tables, 104 chairs only segger Text Box segger Rectangle segger Rectangle segger Rectangle segger Callout Minimum 85" display with sound & mics. Intent is user plugs in laptop to drive "bring your own meeting" from either a lecturn or table top. Must connect to projector when full room in use.
segger Ellipse segger Arrow segger Rectangle segger Callout Suspended Projector segger Callout Drop down Projection screen (120" diagonal) that can replicate images on display screens.
segger Callout AV controls & switches segger Cloud+ segger Cloud+ No AV segger Cloud+ segger Cloud+ No AV for Day 1; rough in will be placed segger Cloud+ segger Cloud+ 65" display with camera, sound bar with HDMI cable to table. Intent is bring your own meeting.
segger Text Box 6-8 occupancy segger Rectangle segger Callout Display location segger Cloud+ segger Cloud+ 75-65" display with camera, sound bar with HDMI cable to floor box. Intent is bring your own meeting.
segger Cloud+ segger Cloud+ No AV for day 1 segger Rectangle segger Callout Display location segger Text Box 10-12 occupancy segger Cloud+ segger Cloud+ NO AV for day 1 segger Cloud+ segger Cloud+ NO AV for day 1 segger Cloud+ segger Cloud+ 55" display with sound bar and camera for "bring your own meeting" with HDMI cable to table; table against the wall under display.
segger Cloud+ segger Cloud+ No AV for Day 1; rough in only.
segger Text Box 2-4 person occupancy segger Text Box 1-6 person occupancy segger Text Box 2-4 person occupancy segger Rectangle segger Callout Display location segger Dimension 14'0" to 16'0" segger Cloud+ segger Cloud+ Projector height to be determined in submittal process.
segger Text Box General Notes: Display screens are 60" H and should have both power and data. Outlets behind screens should be recessed. Backing in wall to be provided by GC. Mounting brackets, displays, drop down screens and projectors to be OFOI.
segger Cloud segger Callout Data at 48" H for AV controller segger Callout Data at 48" H for AV controller segger Text Box Camera: live stream webinars focused on speakers not audience. Recording of sessions is required.
Microphones: wireless lapel microphone & wireless microphones for audience speaking Speakers: ceiling mounted Lecturn/Speaker: expectation is to use floor box.
segger Text Box Closet segger Text Box
File details come from the government source that posted it. Updated .