Exhibit A_CDRLs A001-A002.pdf

PDF 232 KB Posted

Attached to
Helicopter Drive System Test Alignment and Readiness Transition (HeDSTART) Federal contract opportunity
Solicitation number
N0042122R0183
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document contains two Contract Data Requirements Lists (CDRLs) detailing technical data package deliverables for the Helicopter Drive System Test Alignment and Readiness Transition (HeDSTART) project. The CDRLs require the contractor to deliver a preliminary and detailed design technical data package within two days of the respective preliminary and detailed design reviews as outlined in the Statement of Work. The deliverables will be reviewed by a Naval Air Systems Command subject matter expert with a 15 day review period and 15 additional days for the contractor to respond to rejection comments. The technical data packages and any subsequent revisions must be delivered via a secure file transfer system to multiple Navy employees. This work is being performed for the Naval Air Systems Command as part of the HeDSTART project to upgrade components at the Helicopter Drive System Test Facility located at Naval Air Station Patuxent River in Maryland.

View the file

Other files for this federal contract opportunity

Other files attached to Helicopter Drive System Test Alignment and Readiness Transition (HeDSTART), newest first.
File Type Posted
N0042122R0183_HeDSTART_QandA_part3.docx DOCX document
N0042122R0183_HeDSTART_QandA_part2.docx DOCX document
DSC_5743.JPG JPG image
DSC_5745.JPG JPG image
DSC_5755.JPG JPG image
DSC_5761.JPG JPG image
1_N0042122R0183_HeDSTART_QandA_part1.docx DOCX document
DSC_5744.JPG JPG image
DSC_5754.JPG JPG image
philadelphia gbx info.pdf PDF
current gbx_dyno interface drawing.pdf PDF
DSC_5760.JPG JPG image
DSC_5747.JPG JPG image
DSC_5757.JPG JPG image
DSC_5763.JPG JPG image
DSC_5764.JPG JPG image
philadelphia gbx drawing.pdf PDF
Solicitation N0042122R0183_Amend 0001.pdf PDF
Solicitation N0042122R0183_Conformed Amend 0001.pdf PDF
Section L_Attach L-2 Vol 3 PPQ.docx DOCX document
Attachment 1_Blank PSEF BASICS VISITOR REQUEST updated Mar 2018.doc DOC document
Section L_Attach L-1 Vol 1 ES Tables.docx DOCX document
Section L_Attach L-3 Vol 3 PP-1 PP Con Data.xlsx XLSX spreadsheet
Solicitation N0042122R0183.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0003 A TDP___x____ TM_______ OTHER________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HeDSTART System TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Technical Data Package (TDP) HeDSTART Preliminary Design TDP

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

MIL-STD-31000B SOW AB4400

7. DD 250 REQ 9. DIST STATEMENT

E See block 16

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

Yes, see block 16

AS required see block 16 See block 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft

Final

A See block 16 See block 16 See block 16

Reg Repro

16. REMARKS AB4400 / Logan Haney

Block 4: Contractor format is acceptable.

Block 7: The CDRL deliverable shall be reviewed by an AB44 designated SME, and approved/rejected via an email response.

Block 8: The Government will have 15 days for review and acceptance/rejection of each submission. The contractor shall have 15 days to respond to rejection.

Block 9: DISTRIBUTION STATEMENT E: DISTRIBUTION

AUTHORIZED TO DOD COMPONENTS ONLY TO PROTECT

PROPRIETARY INFORMATION AND/OR CRITICAL

TECHNOLOGY MAY 2022. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO THE NAVAL AIR

SYSTEMS COMMAND, PROPULSION AND POWER DEPT, AB44,

PATUXENT RIVER, MD.

Block 10, 11, 12, 13: All Deliverables shall be submitted within 2 days after Preliminary Design review covered by Section 5.2.1 of the SOW. Early and partial submittal of SOW defined TDP components are acceptable.

Block 14: An email notification will be delivered to logan.c.haney@us.navy.mil, Lyle.kralle.civ@us.navy.mil, and Lauren.r.martz.civ@us.navy.mil containing a PDF copy of the letter identifying deliverable. Submit all deliverables under a dated, serialized cover letter identifying the contract number, CDRL by Data Item No, Title, subtitle if applicable, SOW paragraph number, and date of submittal. Each TDP component will be delivered VIA a SAFE site file transfer. Send email to logan.c.haney@us.navy.mil requesting a file drop-off link for https://safe.apps.mil/.

See Block 16

15.TOTAL▬▬▬▬► 0 0 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

May 25, 2022 May 25, 2022 DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _2_Pages.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

SUBMISSION

REQUIRED

HANEY.LOGAN

.C.1288330871

Digitally signed by

HANEY.LOGAN.C.1288330871

Date: 2022.05.25 11:51:32 -04'00'

WEISS.THOMAS.A.1229

213950

Digitally signed by

WEISS.THOMAS.A.1229213950

Date: 2022.05.25 12:44:09 -04'00'

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0003 A TDP___x____ TM_______ OTHER________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HeDSTART System TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Technical Data Package (TDP) HeDSTART Detailed Design TDP

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

MIL-STD-31000B SOW

7. DD 250 REQ 9. DIST STATEMENT

E See block 16

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

Yes, see block 16

AS required see block 16 See block 16

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft

Final

A See block 16 See block 16 See block 16

Reg Repro

16. REMARKS AB4400 / Logan Haney

Block 4: Contractor format is acceptable.

Block 7: The CDRL deliverable shall be reviewed by an AB44 designated SME, and approved/rejected via an email response.

Block 8: The Government will have 15 days for review and acceptance/rejection of each submission. The contractor shall have 15 days to respond to rejection.

Block 9: DISTRIBUTION STATEMENT E: DISTRIBUTION

AUTHORIZED TO DOD COMPONENTS ONLY TO PROTECT

PROPRIETARY INFORMATION AND/OR CRITICAL

TECHNOLOGY MAY 2022. OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO THE NAVAL AIR

SYSTEMS COMMAND, PROPULSION AND POWER DEPT, AB44,

PATUXENT RIVER, MD.

Block 10, 11, 12, 13: All Deliverables shall be submitted within 2 days after Preliminary Design review covered by Section 5.2.2 of the SOW. Early and partial submittal of SOW defined TDP components are acceptable.

Block 14: An email notification will be delivered to logan.c.haney@us.navy.mil, Lyle.kralle.civ@us.navy.mil, and Lauren.r.martz.civ@us.navy.mil containing a PDF copy of the letter identifying deliverable. Submit all deliverables under a dated, serialized cover letter identifying the contract number, CDRL by Data Item No, Title, subtitle if applicable, SOW paragraph number, and date of submittal. Each TDP component will be delivered VIA a SAFE site file transfer. Send email to logan.c.haney@us.navy.mil requesting a file drop-off link for https://safe.apps.mil/.

See Block 16

15.TOTAL▬▬▬▬► 0 0 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

May 25, 2022 May 25, 2022 DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of _2_Pages.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

REQUIRED

SUBMISSION

HANEY.LOGAN

.C.1288330871

Digitally signed by

HANEY.LOGAN.C.1288330871

Date: 2022.05.25 11:51:58 -04'00'

WEISS.THOMAS.A.1

229213950

Digitally signed by

WEISS.THOMAS.A.1229213950

Date: 2022.05.25 12:44:41 -04'00'

File details come from the government source that posted it. Updated .