Exhibit A_CDRL_A002_GFP Inventory Report_Final_9Dec2021.pdf

PDF 259 KB Posted

Attached to
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
Solicitation number
FA4610-22-R-0001
Issued by
Department of the Air Force Space Command

About this file

This document contains a final request for proposal for the Launch Operations Support Contract at Vandenberg Air Force Base. The RFP seeks proposals to provide launch operations support services including mission integration, processing and operations, safety and mission assurance, engineering, and other support functions. Proposals are due no later than January 27, 2022. The North American Industry Classification System code for this effort is 561210 for facilities support services. The RFP includes attachments outlining the performance work statement, government furnished property, security requirements, applicable labor standards and wage determinations, collective bargaining agreements, and contract data requirements lists. Questions regarding the RFP are due by January 4, 2022. The incumbent contractor is encouraged to review additional technical library files provided for informational purposes only.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-1_Contractor Staffing Plan and Matrix_30Aug22.xlsx XLSX spreadsheet
TECH LIBRARY Workload Data Information for CLINs X003_X004.docx DOCX document
Conformed Solicitation Amendment - FA461022R00010005.pdf PDF
L-5_Section M dtd 19Nov21_Revised_02Feb2022.pdf PDF
RFP Amendment 0003 FA461022R00010003 SF30 signed 20220125.pdf PDF
RFP Amendment - FA461022R00010002 SF30 signed 20220118.pdf PDF
Amend 0001 Conformed SF33 - FA461022R00010001_20220112.pdf PDF
Atch 6_LOSC_DD254_7Jan2022.pdf PDF
Atch 11 Appendix D - Job Descriptions_redacted_11Jan2022.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A_12Jan2022.pdf PDF
L-5_Section M dtd 19Nov21_Revised_11Jan2022.pdf PDF
22R0001 LOSC RFP QandA Consolidated.pdf PDF
Atch 1_LOSC PWS_dtd 09Dec2021_Final.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_9Dec2021.xlsx XLSX spreadsheet
Atch 2_Appendix K_Compliance documents_Final_9Dec2021.pdf PDF
Atch 9 SCA WD 2015-5647_Rev 13_20211020.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219.pdf PDF
Exhibit A_CDRL_A003_Test Inspection Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A007_P-E Certification Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A013_Backflow Prevention Systems Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A017_Lead-Based Abatement Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A022_Accident Incident Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A025_Generator Testing and Maint Report_Final_9Dec2021.pdf PDF
Exhibit B_LOSC_DID_Combined_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-IF8I_-en-e.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1A_datasheet_022610.pdf PDF
TECH LIBRARY 1 System and Overview ACGAL020S000001_A.pdf PDF
TECH LIBRARY 5-HPGSA-PV-230-VTE-20210121.pdf PDF
TECH LIBRARY 8-LOSC Service Calls 1Jul19_30Jun20.pdf PDF
TECH LIBRARY 9-TA rollup WLF.pdf PDF
TECH LIBRARY 11-Workload Factor Hours_OY2.pdf PDF
TECH LIBRARY 13-CDRL_A001_Submittal example.pdf PDF
TECH LIBRARY 13-CDRL_A003_Testing and Certification_example.pdf PDF
TECH LIBRARY 13-CDRL_A024_Work Order Status Report_example.pdf PDF
TECH LIBRARY 13-CDRL_A010 Daily Maintenance And Repair Schedule_example.pdf PDF
TECH LIBRARY 13-CDRL_A014_Cathodic Protection Tracker_example.pdf PDF
L-5_Section M dtd 19Nov21_Final_9Dec2021.pdf PDF
Atch 6_LOSC_DD254_9Dec2021.pdf PDF
Atch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted.pdf PDF
Exhibit A_CDRL_A010_Daily Maintenance and Repair Schedule_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A014_Cathodic Protection Booklet_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A020_Contract Funds Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A027_Facility Assessment Report_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-um001_-en-p.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1407-CGCM-DLR.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-td001_-en-p.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020S000002_E1.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1AmanualRev022610V13.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 2814100.pdf PDF
TECH LIBRARY 10-Fences_Gates_WLF.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: MGMT

TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO.

FA4610-22-R-0001

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

GOVERNMENT PROPERTY INVENTORY REPORT

3. SUBTITLE

GFP INVENTORY REPORTING

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80441D

5. CONTRACT REFERENCE

SEE BLK 16

6. REQUIRING OFFICE

SLD30/PMD

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

SEMIA

12. DATE OF FIRST SUBMISSION

45 DACS

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

180 Days Draft

Final

Reg Repro

16. REMARKS

BLK6: Reference Data Item Description (DID) DI-MGMT-80441D

BLK 7: Email may be used to meet Letter of Transmittal (LT) delivery requirement.

BLK 8 and 12: Initial draft report due within 45 calendar days after contract start (DACS). Provide draft report via email to the assigned Property Administrator in 30 CONS/PKD for concurrence of expected future final reporting requirements as specified in BLK 10.

BLK 11: As of contract start date.

BLK 14: Final reports are to be sent via email to the Program Manager in SLD30/PMD and to the Contracting Officer and assigned Property Administrator in 30 CONS/PKD.

SLD30/PMD 1 1 0

30 CONS/PKD 1 2 0

30 LRS/LGRMCE 1 1 0

15. TOTAL 3 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

17. PRICE GROUP

Reset

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY: MGMT

TDP TM OTHER

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of 1 Pages

DD FORM 1423-1 (BACK), FEB 2001

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

The Government's right to use the data shall be governed by the pertinent provisions of the contract.

File details come from the government source that posted it. Updated .