Exhibit A - BTL Collimator SOW - Steel Plates Procurement Specification.pdf
PDF 237 KB Posted
- Attached to
- Fabrication of BTL COLLIMATOR STEEL PLATES
- Solicitation number
- 378469-RK
About this file
This is a Statement of Work (SOW) for the fabrication of steel shielding plates for the PIP-II BTL (Beam Test Line) Collimator at Fermi National Accelerator Laboratory (FNAL), managed by Fermi Research Alliance, LLC for the U.S. Department of Energy Office of Science.
The subcontractor must fabricate 172 steel plate assemblies across three collimator types (CL, HC, and VC) according to FFDG engineering drawings, with quantities ranging from 1 to 10 units per part number. All work must use only RELEASED drawings, verified with a technical representative before fabrication begins. Deliverables include the fabricated steel plates, dimensional inspection reports for all pieces, and material certification documentation. The subcontractor is responsible for all manufacturing, testing, and delivery to FFDG, with batch delivery schedules and quantities to be determined by FFDG project engineering after purchase order award. Quality requirements mandate immediate notification of any conflicts between specifications, SOW, and drawings, with order of precedence prioritizing drawings over SOW, specifications, RFP terms and conditions, and the subcontractor's response. The subcontractor must perform dimensional inspections per drawing specifications and provide test equipment calibration proof; FFDG will conduct site acceptance testing upon receipt. All units must be serialized per an FFDG-provided scheme, properly packaged for shipment with lifting considerations for larger plates, and include a 12-month warranty against manufacturing defects. Requests for post-award modifications require submission of a Manufacturers Exception Document (MED) listing all proposed changes for FFDG approval before implementation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIP-II BTL Collimator
Steel Plates – Statement of Work
ED0039519
Statement of Work
Fermi National Accelerator Laboratory 3
Table of Contents
1. INTRODUCTION
2. SCOPE AND DELIVERABLES
3. REQUIREMENTS/SPECIFICATIONS
4. DELIVERY SCHEDULE AND HOLD POINTS
5. REPORTING/MEETING REQUIREMENTS
6. QUALITY REQUIREMENTS
6.1. Documentation
7. ACCEPTANCE
7.1. Subcontractor Testing
7.2. FFDG Site Acceptance Testing
7.3. Serialization
8. POST-AWARD MANUFACTURER'S EXCEPTION DOCUMENT
9. WARRANTY
10. SHIPPING
APPENDIX A
A.1 ACRONYMS
Fermi National Accelerator Laboratory 4
1. INTRODUCTION
This SOW is for the BTL Collimator steel shielding plates. The scope of the work is to fabricate the plates per the FFDG engineering drawings and deliver to FFDG.
2. SCOPE AND DELIVERABLES
This Statement of Work (SOW) covers the BTL Collimator steel shielding plates. Table 1 provides a list of all contract deliverables, including documentation.
Only RELEASED drawings shall be used for fabrication. The subcontractor must verify drawing versions with a technical representative prior to beginning any fabrication or work.
Table 1: List of Contract Deliverables
Item Drawing Number Revision Quantity Dimensional Inspection Report N/A N/A N/A Material Certification Documentation N/A N/A N/A
PIP II BTL CL STEEL END BLOCK AS 3 F10188204 - 2
PIP II BTL CL STEEL END BLOCK AS 4 F10188205 - 2
PIP II BTL CL STEEL END BLOCK WS 1 F10188050 - 2
PIP II BTL CL STEEL END BLOCK WS 2 F10188054 - 2
PIP II BTL CL STEEL END BLOCK WS 3 F10188213 - 2
PIP II BTL CL STEEL END BLOCK WS 4 F10188215 - 2
PIP II BTL CL STEEL MID BLOCK AS F10188072 - 10
PIP II BTL CL STEEL MID BLOCK WS F10188070 - 10
PIP II BTL CL STEEL PC AISLE PLATE 3 F10188082 - 2
PIP II BTL CL STEEL PC SHIELDING CLAMP BOTTOM F10227079 - 2
PIP II BTL CL STEEL PC SHIELDING CLAMP TOP F10227072 - 2
PIP II BTL CL STEEL PLUG PC 1 F10177263 - 2
PIP II BTL CL STEEL PLUG PC 2 F10189840 - 2
PIP II BTL CL STEEL PLUG PC 3 F10189839 - 2
PIP II BTL CL STEEL PLUG PC 4 F10189838 - 2
PIP II BTL CL STEEL SC BLOCK 1-1 F10189469 - 2
PIP II BTL CL STEEL SC BLOCK 1-2 F10188200 - 2
PIP II BTL CL STEEL SC BLOCK 2-1 F10189471 - 2
PIP II BTL CL STEEL SC BLOCK 2-2 F10188211 - 2
PIP II BTL CL STEEL SC END BLOCK AS F10188202 - 2
PIP II BTL CL STEEL SC END BLOCK WS F10188212 - 2
PIP II BTL CL STEEL TOP PLATE 1-1 F10189439 - 2
PIP II BTL CL STEEL TOP PLATE 1-2 F10188239 - 2
PIP II BTL CL STEEL TOP PLATE 1-3 F10189501 - 2
PIP II BTL CL STEEL TOP PLATE 2-1 F10190719 - 2
PIP II BTL CL STEEL TOP PLATE 2-2 F10190717 - 4
PIP II BTL CL STEEL TOP PLATE 3-1 F10188243 - 2
PIP II BTL CL STEEL TOP PLATE 3-4 F10226363 - 2
Fermi National Accelerator Laboratory 5
PIP II BTL CL STEEL TOP PLATE 4 F10188245 - 6
PIP II BTL CL STEEL WALL PLATE 1-1 F10190746 - 2
PIP II BTL CL STEEL WALL PLATE 1-2 F10190745 - 2
PIP II BTL CL STEEL WALL PLATE 1-3 F10190740 - 2
PIP II BTL CL STEEL WALL PLATE 2-1 F10190741 - 2
PIP II BTL CL STEEL WALL PLATE 2-2 F10190738 - 2
PIP II BTL CL STEEL WALL PLATE 2-3 F10190739 - 2
PIP II BTL CL STEEL WALL PLATE 3-1 F10188217 - 2
PIP II BTL CL STEEL WALL PLATE 3-2 F10190737 - 2
PIP II BTL CL STEEL WALL PLATE 3-3 F10188238 - 2
PIP II BTL CL STEEL WALL TOP PLATE F10188253 - 6
PIP II BTL HC STEEL AISLE PLATE 1 F10188175 - 1
PIP II BTL HC STEEL AISLE PLATE 2 F10188183 - 1
PIP II BTL HC STEEL AISLE PLATE 3 F10188185 - 1
PIP II BTL HC STEEL AISLE PLATE 4 F10188187 - 1
PIP II BTL HC STEEL BOTTOM PLATE 1-1 F10191023 - 1
PIP II BTL HC STEEL BOTTOM PLATE 1-2-A F10246430 - 1
PIP II BTL HC STEEL BOTTOM PLATE 1-2-A F10246431 - 1
PIP II BTL HC STEEL BOTTOM PLATE 1-3 F10191028 - 1
PIP II BTL HC STEEL BOTTOM PLATE 2-1 F10186927 - 1
PIP II BTL HC STEEL BOTTOM PLATE 2-2 F10186928 - 1
PIP II BTL HC STEEL BOTTOM PLATE 2-3 F10224892 - 1
PIP II BTL HC STEEL BOTTOM PLATE 2-4 F10224893 - 1
PIP II BTL HC STEEL END BLOCK AS 1 F10191273 - 1
PIP II BTL HC STEEL END BLOCK AS 2 F10191272 - 1
PIP II BTL HC STEEL PC AISLE PLATE 1 F10188029 - 1
PIP II BTL HC STEEL PC AISLE PLATE 2 F10188030 - 1
PIP II BTL HC STEEL PC BLOCK AS F10188048 A 1
PIP II BTL HC STEEL PC BLOCK WS F10188046 A 1
PIP II BTL HC STEEL PC PLATE 1 F10187885 - 1
PIP II BTL HC STEEL PC PLATE 2 F10187744 - 1
PIP II BTL HC STEEL PC PLATE 3-1 F10188043 - 1
PIP II BTL HC STEEL PC PLATE 3-2 F10187773 - 1
PIP II BTL HC STEEL PC PLATE 4 F10187747 A 1
PIP II BTL HC STEEL PC SPACER F10187775 - 1
PIP II BTL HC STEEL PC SPACER 2 F10225544 - 1
PIP II BTL HC STEEL SC PLATE 1 F10188065 - 1
PIP II BTL HC STEEL SC PLATE 2 F10187741 - 1
PIP II BTL HC STEEL SC PLATE 3-1 F10188061 - 1
PIP II BTL HC STEEL SC PLATE 3-2 FEEDTHROUGH F10187777 - 1
PIP II BTL HC STEEL SC PLATE 3-3 FEEDTHROUGH F10187776 - 1
PIP II BTL HC STEEL SC PLATE 4 F10187883 - 1
PIP II BTL HC STEEL TOP PLATE 3-2 F10226373 - 1
PIP II BTL HC STEEL TOP PLATE 3-3 F10226374 - 1
PIP II BTL VC STEEL AISLE PLATE 1 F10190866 - 1
PIP II BTL VC STEEL AISLE PLATE 2 F10189502 - 1
PIP II BTL VC STEEL AISLE PLATE 3 F10225426 - 1
Fermi National Accelerator Laboratory 6
PIP II BTL VC STEEL BOTTOM PLATE 1-1 F10189284 - 1
PIP II BTL VC STEEL BOTTOM PLATE 1-2 F10190289 - 1
PIP II BTL VC STEEL BOTTOM PLATE 1-3 F10189458 - 1
PIP II BTL VC STEEL BOTTOM PLATE 1-4 F10189459 - 1
PIP II BTL VC STEEL BOTTOM PLATE 2-1 F10189285 - 1
PIP II BTL VC STEEL BOTTOM PLATE 2-2 F10189289 - 1
PIP II BTL VC STEEL BOTTOM PLATE 2-3 F10189288 - 1
PIP II BTL VC STEEL BOTTOM PLATE 2-4 F10189290 - 1
PIP II BTL VC STEEL END BLOCK AS 1 F10188055 - 1
PIP II BTL VC STEEL END BLOCK AS 2 F10188053 - 1
PIP II BTL VC STEEL PC AISLE PLATE 1 F10189437 - 1
PIP II BTL VC STEEL PC AISLE PLATE 2 F10189438 - 1
PIP II BTL VC STEEL PC BLOCK 1-1 F10189372 A 1
PIP II BTL VC STEEL PC BLOCK 1-2 F10189374 A 1
PIP II BTL VC STEEL PC BLOCK 2 F10189383 A 1
PIP II BTL VC STEEL PC PLATE 1 F10189302 - 1
PIP II BTL VC STEEL PC PLATE 2-1 F10191066 - 1
PIP II BTL VC STEEL PC PLATE 2-2 F10189312 - 1
PIP II BTL VC STEEL PC PLATE 2-3 F10189314 - 1
PIP II BTL VC STEEL PC PLATE 3-1 F10189386 - 1
PIP II BTL VC STEEL PC PLATE 3-2 F10189387 - 1
PIP II BTL VC STEEL PC PLATE 4 F10189388 A 1
PIP II BTL VC STEEL PC SPACER F10191067 - 2
PIP II BTL VC STEEL SC PLATE 1 F10189476 - 1
PIP II BTL VC STEEL SC PLATE 2-1 F10189492 - 1
PIP II BTL VC STEEL SC PLATE 2-2 F10189494 - 1
PIP II BTL VC STEEL SC PLATE 2-3 F10189479 - 1
PIP II BTL VC STEEL SC PLATE 3-1 F10189496 - 1
PIP II BTL VC STEEL SC PLATE 3-2 F10189495 - 1
PIP II BTL VC STEEL SC PLATE 3-3 F10189497 - 1
PIP II BTL VC STEEL SC SHIELDING CLAMP BOTTOM F10227083 - 4
PIP II BTL VC STEEL SC SHIELDING CLAMP TOP F10227084 - 4
PIP II BTL VC STEEL TOP PLATE 3-2 F10188242 - 1
PIP II BTL VC STEEL TOP PLATE 3-3 F10226368 - 1
Fermi National Accelerator Laboratory 7
3. REQUIREMENTS/SPECIFICATIONS
The specifications for the parts are detailed on the engineering drawings. The subcontractor may request modifications that would simplify fabrication, decrease costs, or improve performance of the deliverable.
Any requests for deviations and/or exceptions shall be consistent with Clause 5 – CHANGES AND MODIFICATIONS as identified in the Terms and Conditions provided in the RFP documents.
4. DELIVERY SCHEDULE AND HOLD POINTS
FFDG project engineering will propose the preference of quantity, order, and schedule of batch deliveries, and which pieces will be in each batch. This delivery schedule shall be provided in writing to the selected vendor after the PO is awarded, and prior to fabrication.
5. REPORTING/MEETING REQUIREMENTS
The Subcontractor shall provide access to the subcontractor’s manufacturing facility, which will include observation of the in-process work/testing as defined in this SOW, with 1 week’s written notice.
6. QUALITY REQUIREMENTS
The subcontractor is required to procure, build, test, and deliver items per the requirements listed in Section
3. The subcontractor shall immediately notify FFDG of any conflict or ambiguity between the specifications, SOW and/or drawings prior to any work being performed or cost being incurred by FFDG. In the event of a conflict, the order of precedence is as follows:
• Drawings
• Scope of Work
• Specifications
• General Terms and Conditions as identified in the RFP documents
• Subcontractor’s RFP response
6.1. Documentation
The subcontractor shall provide material certifications for all manufactured parts prior to shipment to FFDG. The subcontractor shall provide dimensional reports for all pieces prior to shipment to FFDG.
Fermi National Accelerator Laboratory 8
7. ACCEPTANCE
7.1. Subcontractor Testing
The Subcontractor shall provide all Inspection Reports prior to shipment of the deliverables, which documents the tests shown in Table 2.
Table 2: Supplier tests
Test Name Test Value
Dimensional inspection Per drawing
Where testing is required, the Subcontractor shall provide details of test equipment used, along with proof of most recent equipment calibrations.
7.2. FFDG Site Acceptance Testing
Upon receipt of deliverables, FFDG will conduct the site acceptance tests shown in Table 3.
Table 3: FFDG site acceptance tests
Test Name Test Value
Dimensional inspection Per drawing
7.3. Serialization
All units shall be marked with a serial number. The numbering scheme and marking method shall be provided by FFDG to vendor prior to fabrication.
8. POST-AWARD MANUFACTURER'S EXCEPTION DOCUMENT
If the Subcontractor requests a post-award change to the contract requirements (specifications, drawings, etc.), the Subcontractor shall provide to FFDG a Manufacturers Exception Document (MED). This document shall list all proposed changes. When drawings are affected, each drawing change shall be listed and include the drawing number, changed drawing values, and drawing location. FFDG must sign and return the MED prior to implementing changes. All changes shall be pursuant to and consistent with Clause 5 – CHANGES AND MODIFICATIONS as identified in the Terms and Conditions provided in the RFP documents.
9. WARRANTY
Contract deliverables shall be free of manufacturing defects for a period of 12 months after component delivery.
Fermi National Accelerator Laboratory 9
10. SHIPPING
All items shall be packaged to protect them from shipping and weather damage.
During shipping, for plates with a tapped lifting hole at the center of mass, effort should be made by the subcontractor to orient the plates such that the lifting point is oriented upwards for unloading with hoist ring and overhead crane. For smaller plates, as applicable, subcontractor shall palletize plates so they can be unloaded by forklift.
APPENDIX A
A.1 ACRONYMS
ARO After Receipt of Order
FNAL Fermi National Accelerator Laboratory
FFDG Fermi Forward Discovery Group
MED Manufacturers Exception Document PIP-II Proton Improvement Plan Phase 2 RFI Request For Information RFP Request For Proposal SOW Statement of Work
| PIP-II BTL Collimator |
| 1. INTRODUCTION |
| 2. SCOPE AND DELIVERABLES |
| Table 1: List of Contract Deliverables |
| 3. REQUIREMENTS/SPECIFICATIONS |
| 4. DELIVERY SCHEDULE AND HOLD POINTS |
| 5. REPORTING/MEETING REQUIREMENTS |
| 6. QUALITY REQUIREMENTS |
| 7. ACCEPTANCE |
| Table 2: Supplier tests |
| Table 3: FFDG site acceptance tests |
| 8. POST-AWARD MANUFACTURER'S EXCEPTION DOCUMENT |
| 9. WARRANTY |
| 10. SHIPPING |
| APPENDIX A |
File details come from the government source that posted it. Updated .