About this file

This is a Scope of Work document from KOMPAN, Inc., the playground equipment contractor, detailing site preparation requirements for the City of Bridgeport, Connecticut's Bryant School Paving and Site Work project located at 230 Poplar Street, Bridgeport, CT 06605. The scope outlines comprehensive site work including demolition and removal of existing playground structures and chain-link fencing with associated concrete footings, installation of approved subbase material with grading and compaction, drainage system installation connecting to existing main storm drains, and supply and installation of new asphalt to match surrounding paved areas in elevation, slope, and appearance. Following completion of this site work, KOMPAN will install playground equipment and surfacing directly on the new asphalt surface. The project must be completed during the summer break period from June 23 through August 10, 2026, with a mandatory site walk-through scheduled for Wednesday, February 25, 2026 at 10:00 am and electronic bid submissions required by 2:00 pm Eastern Standard Time on Tuesday, March 24, 2026 through the City's OpenGov e-Procurement Portal, with the written question submission deadline at 2:00 pm on Monday, March 9, 2026.

Contractors must be established firms with a minimum of five years in business, maintain a local office with adequate inventory, employ trained personnel, and hold Connecticut licensure with all employees properly certified. The contractor must furnish all labor, materials, equipment, refuse removal, and obtain all required City permits and associated fees with pricing remaining firm through October 30, 2026. For bids of $50,000 or more, a 10 percent bid bond or certified check is required, and the successful bidder must post a 100 percent performance bond and 100 percent payment bond for applicable contract amounts. Prevailing wage rates must be included for bids exceeding $100,000 in accordance with Connecticut requirements. Comprehensive insurance coverage is mandated, including Workers' Compensation, Commercial General Liability of $1,000,000 per occurrence and $2,000,000 aggregate, Automobile Liability of $1,000,000, Umbrella/Excess Liability of $5,000,000 per occurrence and aggregate, and Environmental Liability of $5,000,000 if applicable, with all carriers maintaining AM Best A-VII ratings and the City named as Additional Insured. Payment terms are Net 45 Days, and prior to commencing work, the successful vendor must have valid SAM, DUNS, Connecticut, and Federal Tax ID numbers.

View the file

Other files

File Type Posted
Bryant_School_Paving_and_Site_Work_(Addendum_#2_Revision).pdf PDF
Bryant_School_Paving_and_Site_Work_(Addendum_#2_Revision).pdf PDF
Bryant_School_Paving_and_Site_Work_(Addendum_#1_Revision).pdf PDF
Bryant_School_Paving_and_Site_Work.pdf PDF
EXHIBIT_A_Bryant_School_Playground_Scope_and_Site_Plan.pdf PDF
EXHIBIT_C.pdf PDF
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
Bryant_School_Site_Plan.pdf PDF
EXHIBIT_B.docx DOCX document
EXHIBIT_C.pdf PDF
Bryant_School_Site_Plan.pdf PDF
Bryant_School_Site_Plan.pdf PDF
Bryant_School_Site_Plan.pdf PDF
EXHIBIT_C.pdf PDF
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
EXHIBIT_A_Bryant_School_Playground_Scope_and_Site_Plan.pdf PDF
EXHIBIT_B.docx DOCX document
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
EXHIBIT_A_Bryant_School_Playground_Scope_and_Site_Plan.pdf PDF
EXHIBIT_B.docx DOCX document
EXHIBIT_B.docx DOCX document
EXHIBIT_C.pdf PDF
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_FORM.docx DOCX document
BID_FORM.docx DOCX document
BID_FORM.docx DOCX document
BID_FORM.docx DOCX document
Site_Plan_with_Fencing.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
Site_Plan_with_Fencing.pdf PDF
Site_Plan_with_Fencing.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
Site_Plan_with_Fencing.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

605 West Howard Lane Suite 101 - Austin, TX 78753 - Phone:1-800-426-9788 - www.kompan.us

1/23/2026 KOMPAN, Inc.

605 W Howard Ln St. 101 Austin, Texas 78753

Subject: Bryant School – 230 Poplar St. Bridgeport, CT 06605

Dear Bryant School Design and Construction Team, After the preconstruction meeting on Tuesday, 1/20/2026 the KOMPAN construction team decided an alternative method of construction and sequencing is optimal moving forward.

Installing the playground and surfacing directly on top of new asphalt is optimal for various reasons including drainage, sequencing, and site simplicity. Asphalt is an excellent substrate for pour in place rubber. Please find the updated scope needed to achieve this approach.

Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the following work at the Project site:

1. Demolition & Removal o Remove and dispose of all existing playground structures, including all associated concrete footings.

o Remove and dispose of the existing chain link fence, including all associated concrete footings.

2. Site Preparation o Install an approved subbase material to fill the existing playground area and properly prepare the surface for new asphalt installation.

o Grade and compact the subbase to meet necessary requirements.

3. Drainage o Install approved drainage outside of the new playground footprint.

o Connect and divert drainage to the existing main storm drain to ensure proper water flow and prevent pooling.

4. Asphalt Installation o Supply and install new asphalt in the existing playground area.

o Asphalt shall be installed to match the elevation, slope, and appearance of the surrounding paved areas.

Once this site work is completed. Kompan will install the playground directly through the new asphalt followed by the surfacing.

Please reach out to our team with any questions.

Sincerely, Bob Hoke, CPSI Regional Operations Manager Installation, Service and Aftermarket

Exhibit A Bryant School Scope
EXHIBIT A

File details come from the government source that posted it. Updated .