About this file

This is a Scope of Work document prepared by KOMPAN, Inc. for the City of Bridgeport, Connecticut, Department of Public Purchases, detailing site preparation and construction requirements for the Bryant School Playground Project located at 230 Poplar Street, Bridgeport, Connecticut. The scope encompasses comprehensive site work including demolition and removal of existing playground structures and chain-link fencing with all associated concrete footings, installation of approved subbase material with grading and compaction, drainage system installation connecting to existing storm drains, and supply and installation of new asphalt to match surrounding paved areas. Following completion of site work, KOMPAN will install playground equipment and surfacing directly on the new asphalt surface. Electronic bids must be submitted through the City's OpenGov e-Procurement Portal by 2:00 pm Eastern Standard Time on Tuesday, March 24, 2026, with public bid opening at the same time. A mandatory site walk-through is scheduled for Wednesday, February 25, 2026 at 10:00 am, and the written question submission deadline is 2:00 pm on Monday, March 9, 2026. All work must be completed during the summer break period from June 23 through August 10, 2026.

Contractors must be established firms with a minimum of five years in business, maintain Connecticut licensure, and hold all required certifications. A 10 percent bid bond or certified check is required for bids of $50,000 or more, and successful bidders must post 100 percent performance and payment bonds as applicable. Prevailing wage rates apply to bids exceeding $100,000 in accordance with Connecticut requirements. Comprehensive insurance coverage is mandatory, including Workers' Compensation, Commercial General Liability of $1,000,000 per occurrence and $2,000,000 annual aggregate, Automobile Liability of $1,000,000 per accident, and Umbrella/Excess Liability of $5,000,000 per occurrence and aggregate. All pricing must remain firm and valid through October 30, 2026, with payment terms of Net 45 Days. The City of Bridgeport reserves the right to reject any or all bids and is not bound to award based solely on low bid.

View the file

Other files

File Type Posted
Bryant_School_Paving_and_Site_Work_(Addendum_#2_Revision).pdf PDF
Bryant_School_Paving_and_Site_Work_(Addendum_#2_Revision).pdf PDF
Bryant_School_Paving_and_Site_Work_(Addendum_#1_Revision).pdf PDF
Bryant_School_Paving_and_Site_Work.pdf PDF
Bryant_School_Site_Plan.pdf PDF
Bryant_School_Site_Plan.pdf PDF
Bryant_School_Site_Plan.pdf PDF
EXHIBIT_C.pdf PDF
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
EXHIBIT_A_Bryant_School_Playground_Scope_and_Site_Plan.pdf PDF
EXHIBIT_B.docx DOCX document
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
EXHIBIT_B.docx DOCX document
EXHIBIT_B.docx DOCX document
EXHIBIT_C.pdf PDF
EXHIBIT_B.docx DOCX document
EXHIBIT_C.pdf PDF
EXHIBIT_A_Bryant_School_Playground_Scope_and_Site_Plan.pdf PDF
EXHIBIT_A_Bryant_School_Playground_Scope_and_Site_Plan.pdf PDF
EXHIBIT_C.pdf PDF
GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025_1.pdf PDF
Bryant_School_Site_Plan.pdf PDF
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_SCOPE_BRYANT_PAVING_&_SITEWORK_.docx DOCX document
BID_FORM.docx DOCX document
BID_FORM.docx DOCX document
BID_FORM.docx DOCX document
BID_FORM.docx DOCX document
Site_Plan_with_Fencing.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
Site_Plan_with_Fencing.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
Site_Plan_with_Fencing.pdf PDF
Site_Plan_with_Fencing.pdf PDF
WALL_SPECIFICATIONS.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider_-_Large_Project_$5M+.pdf PDF
Construction_Services_Insurance_Rider.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

605 West Howard Lane Suite 101 - Austin, TX 78753 - Phone:1-800-426-9788 - www.kompan.us

1/23/2026 KOMPAN, Inc.

605 W Howard Ln St. 101 Austin, Texas 78753

Subject: Bryant School – 230 Poplar St. Bridgeport, CT 06605

Dear Bryant School Design and Construction Team, After the preconstruction meeting on Tuesday, 1/20/2026 the KOMPAN construction team decided an alternative method of construction and sequencing is optimal moving forward.

Installing the playground and surfacing directly on top of new asphalt is optimal for various reasons including drainage, sequencing, and site simplicity. Asphalt is an excellent substrate for pour in place rubber. Please find the updated scope needed to achieve this approach.

Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the following work at the Project site:

1. Demolition & Removal o Remove and dispose of all existing playground structures, including all associated concrete footings.

o Remove and dispose of the existing chain link fence, including all associated concrete footings.

2. Site Preparation o Install an approved subbase material to fill the existing playground area and properly prepare the surface for new asphalt installation.

o Grade and compact the subbase to meet necessary requirements.

3. Drainage o Install approved drainage outside of the new playground footprint.

o Connect and divert drainage to the existing main storm drain to ensure proper water flow and prevent pooling.

4. Asphalt Installation o Supply and install new asphalt in the existing playground area.

o Asphalt shall be installed to match the elevation, slope, and appearance of the surrounding paved areas.

Once this site work is completed. Kompan will install the playground directly through the new asphalt followed by the surfacing.

Please reach out to our team with any questions.

Sincerely, Bob Hoke, CPSI Regional Operations Manager Installation, Service and Aftermarket

Exhibit A Bryant School Scope
EXHIBIT A

File details come from the government source that posted it. Updated .