This is a Scope of Work exhibit prepared by KOMPAN, Inc. for the City of Bridgeport, Connecticut Department of Public Purchases regarding paving and site work improvements at Bryant School, 230 Poplar Street, Bridgeport, Connecticut. The project encompasses demolition and removal of existing playground structures and chain-link fencing including all associated concrete footings, site preparation through installation and compaction of approved subbase material, installation of approved drainage systems connecting to existing storm drains to prevent pooling, and supply and installation of new asphalt to match surrounding paved areas. Following completion of site work, KOMPAN will install playground equipment and surfacing directly on the new asphalt surface. Electronic bids must be submitted through the City's OpenGov e-Procurement Portal by 2:00 pm Eastern Standard Time on Tuesday, March 24, 2026, with public opening at the same time. A mandatory site walk-through is scheduled for Wednesday, February 25, 2026 at 10:00 am. The written question submission deadline is 2:00 pm on Monday, March 9, 2026. Work must be completed during the summer break period from June 23 through August 10, 2026.
Contractors must be established firms with a minimum of five years in business, maintain a local office with adequate inventory, and hold Connecticut licensure with all employees properly certified. A 10 percent bid bond or certified check is required for bids of $50,000 or more. The successful bidder must post a 100 percent performance bond for contract prices of $50,000 or more and a 100 percent payment bond for contract prices exceeding $100,000. Prevailing wage rates must be included in bids exceeding $100,000 in accordance with Connecticut prevailing wage requirements. Contractors must maintain comprehensive insurance coverage including Workers' Compensation Insurance, Commercial General Liability of $1,000,000 per occurrence and $2,000,000 annual aggregate, Automobile Liability of $1,000,000 per accident, Umbrella/Excess Liability of $5,000,000 per occurrence and aggregate, and Environmental Liability insurance of $5,000,000 per claim and aggregate if applicable. All insurance carriers must be licensed in Connecticut with an AM Best rating of A-VII or better, with the City named as an Additional Insured on all liability policies. Payment terms are Net 45 Days, and all pricing must remain firm and valid through October 30, 2026.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
605 West Howard Lane Suite 101 - Austin, TX 78753 - Phone:1-800-426-9788 - www.kompan.us
1/23/2026 KOMPAN, Inc.
605 W Howard Ln St. 101 Austin, Texas 78753
Subject: Bryant School – 230 Poplar St. Bridgeport, CT 06605
Dear Bryant School Design and Construction Team, After the preconstruction meeting on Tuesday, 1/20/2026 the KOMPAN construction team decided an alternative method of construction and sequencing is optimal moving forward.
Installing the playground and surfacing directly on top of new asphalt is optimal for various reasons including drainage, sequencing, and site simplicity. Asphalt is an excellent substrate for pour in place rubber. Please find the updated scope needed to achieve this approach.
Contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the following work at the Project site:
1. Demolition & Removal o Remove and dispose of all existing playground structures, including all associated concrete footings.
o Remove and dispose of the existing chain link fence, including all associated concrete footings.
2. Site Preparation o Install an approved subbase material to fill the existing playground area and properly prepare the surface for new asphalt installation.
o Grade and compact the subbase to meet necessary requirements.
3. Drainage o Install approved drainage outside of the new playground footprint.
o Connect and divert drainage to the existing main storm drain to ensure proper water flow and prevent pooling.
4. Asphalt Installation o Supply and install new asphalt in the existing playground area.
o Asphalt shall be installed to match the elevation, slope, and appearance of the surrounding paved areas.
Once this site work is completed. Kompan will install the playground directly through the new asphalt followed by the surfacing.
Please reach out to our team with any questions.
Sincerely, Bob Hoke, CPSI Regional Operations Manager Installation, Service and Aftermarket
| Exhibit A Bryant School Scope |