This is an Agreement form (FDACS-01046) issued by the Florida Department of Agriculture and Consumer Services for a contract involving the installation of irrigation infrastructure at the Withlacoochee State Forest in Brooksville, Florida. The project encompasses approximately 128 acres of irrigation system installation, requiring 3,000 linear feet of six-inch Schedule 40 PVC main distribution lines, 8,500 linear feet of four-inch Schedule 40 PVC feeder lines, 283 two-inch PVC risers, 10 four-inch valves, six flush-out stations, 94 rolls of one-inch polyline, and 3,920 Maxi-jet misters with integrated dripline. A mandatory site visit is scheduled for January 15, 2026, at 10:00 AM, with written questions due by January 22, 2026, at 5:00 PM, and sealed bids due on February 2, 2026, at 5:00 PM. The project requires completion within 120 calendar days after the Notice to Proceed, with 100 days allocated for substantial completion and 20 days for final project close-out.
For bids exceeding $100,000, contractors must submit a 5% bid bond and 100% performance bond, and provide a minimum of three references from similar projects completed within the past five years. Contractors must possess licenses for irrigation system installation under Florida Chapter 489, Part I, and maintain comprehensive insurance coverage with the State of Florida listed as an additional insured. All materials and labor carry a one-year written warranty, and liquidated damages are assessed at $250 per calendar day for delays beyond the completion date. The contractor is responsible for supplying all necessary materials, including fittings, glue, cleaners, hose clamps, elbows, and t-fittings, and must integrate the new irrigation system with existing well infrastructure at the site. The specific contract sum and budget allocation are to be determined during the bid process and documented within the executed agreement.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FDACS-01046 Rev 12/23
STATE PROJECT NO.: _____________________________
STATE MINORITY VENDOR DESIGNATION:
FDACS PROJECT NAME AND LOCATION:
THIS AGREEMENT is effective upon the established date of commencement in the Notice to Proceed (FDACS-01506) and is
BY AND BETWEEN
The Florida Department of Agriculture and Consumer Services hereinafter called the Department, and
_________________________________________hereinafter called the Contractor.
The Department and the Contractor agree as set forth below.
ARTICLE 1. THE CONTRACT DOCUMENTS The Contract Documents consists of (1) The Purchase Order (if any), (2) this Agreement, (3) the Contractor’s proposal, (4) all terms, conditions, and specifications of the Invitation to Bid or Sealed Quotation, Drawings, and (5) all Addenda issued prior to execution of this Agreement. These documents form the Contract and are as fully a part of the Contract as if attached to this Agreement or repeated herein. An enumeration of the drawings, specifications and addenda is as follows:
CONTRACTOR
APPROVED:
By:
Authorized Signature
AS WITNESSED:
By:
Witness
DRAWINGS: _______________________________________
SPECIFICATIONS: __________________________________
ADDENDA: ________________________________________
In the event of a conflict in the provisions of said Contract Documents, or any of them that are not an allowed and intentional modification or Change Order, that provisions of the Invitation to Bid shall control.
ARTICLE 2. THE WORK: The Contractor shall perform all the work required by the Contract Documents for items as specified in the Solicitation, number;
ARTICLE 3. CONTRACT SUM – The Department shall pay the Contractor for the performance of work, subject to additions and deductions by Change Order as provided in the Conditions of the Invitation to Bid, in current funds, the Contract Sum of:
FLORIDA DEPARTMENT OF AGRICULTURE AND
CONSUMER SERVICES
APPROVED:
By:
Authorized Signature
AS WITNESSED:
By:
Witness
IN WITNESS WHEREOF, the parties hereto have executed this agreement as stated above.
Florida Department of Agriculture and Consumer Services Bureau of General Services
AGREEMENT BETWEEN DEPARTMENT AND CONTRACTOR
WILTON SIMPSON
COMMISSIONER
DRAFT
From: Date From:
Date To:
To:
Florida Department of Agriculture and Consumer Services Division of Administration Bureau of General Services 407 South Calhoun Street Tallahassee, Florida 32399
The Contract is changed as follows:
DESCRIPTION OF CHANGE (Attach additional pages if required) Decrease Increase
Subtotal -$ -$ Total Net Add/(Deduct)
Days SUBSTANTIAL
COMPLETION
FINAL
COMPLETION Original Contract Sum -$
Original Contract Period Net Change By Previous Approved CO Contract Period Prior To This CO Contract Sum Prior To This CO -$ Change Requested Add/(Deduct) This CO Add/(Deduct) -$ New Contract Period Including This CO New Contract Sum Including This CO -$
FDACS-02023 Rev. 03/20
Print Name
This Change Order Request will become an Amendment to the Contract Agreement between Contractor and the Owner, and all contract provisions shall apply unless specifically exempted. The amount and time change designated are the maximum agreed to by both the Owner and the Contractor for this change. In consideration of the foregoing adjustments in contract time and contract sum, the Contractor hereby releases Owner from all claims, demands or causes of action arising out of the transactions, events and occurrences giving rise to this Change Order. Execpt as provided by this Change Order, the contract remains in full force and effect.
Contract AmountsContract Time
FDACS Contract or PO No:
Florida Department of Agriculture and Consumer Services Division of Administration
Bureau of General Services
MM/DD/YYYY
00000
(Contractor) Change Order No:
MM/DD/YYYY
WILTON SIMPSON
COMMISSIONER
CHANGE ORDER REQUEST
(Project Manager) FDACS Complete Project Name:
Date
Signature
Date
Signature
FLORIDA DEPARTMENT OF AGRICULTURE & CONSUMER SERVICESCONTRACTOR
Project Manager
From:
To:
Florida Department of Agriculture and Consumer Services Division of Administration Bureau of General Services 407 South Calhoun Street Tallahassee, Florida 32399
TO BE COMPLETED BY ARCHITECT/ENGINEER THROUGH FINAL COMPLETION DATE DAYS LIQUIDATED DAMAGES
1.
2.
3. Time Extension Granted by Change Orders
4. 0.00
5.
6. 0.00 -$
Total Liquidated Damages (Substantial + Final Completion) -$
CONTRACTOR'S AFFIDAVIT ARCHITECT- ENGINEER CERTIFICATE DEPARTMENT'S CERTIFICATE
STATE OF: __________________________
COUNTY OF: ________________________
The foregoing instrument was acknowledged before me this __________day of _____________________________ by _____________________________________________ who is personally known to me or has produced __________________________________ as identification.
I solemnly swear (or affirm): That the work under the above named contract and all amendments thereto have been satisfactorily completed; that all amounts payable for materials, labor and other charges attributable to the project have been paid; that no liens have been attached against the project; that no suits are pending by reason of work on the project under the contract; that all Workman’s Compensation claims are covered by Workman’s Compensation Insurance as required by law; and that all public liability claims are covered by insurance.
I CERTIFY that the work under the above contract has been satisfactorily completed on the date set forth in accordance with the terms of the contract.
Florida Department of Agriculture and Consumer Services Division of Administration
Bureau of General Services
CERTIFICATE OF CONTRACT COMPLETION
(Architect/Engineer)
(Division Contract Manager)
WILTON SIMPSON
COMMISSIONER
DATE
FDACS Contract or PO No:
Date of Final Completion:
Print Name Print Name
Signature
Title
Date
Print Name
Signature
Title
Date
Signature
Title
Date
I CERTIFY that the work on the above named project has been satisfactorily completed under the terms of the contract.
Final Contract or PO Total Amount INCLUDING Total Liquidated Damages Below:
FDACS Complete Project Name:
FDACS-01316 Rev. 02/16
Amount of Liquidated Damages at Substantial Completion date
Enter Number Only For
Damages Per Day Contract Complete date & actual days between Substantial and Final
Completion
(Notary signature)
(Notary name or stamp)
Time Specified in Original Contract between Substantial Completion & Final Completion
Total Days Allowed Between Substantial & Final Completion (Add Lines 2 and 3)
(name & title of officer/agent)
Final Completion Overrun (Subtract Line 4 from 5 and Enter Overrun. If line 5 less than line 4, enter 0.)
From:
(Architect/Engineer)
To: (Division Contract Manager) Florida Department of Agriculture and Consumer Services Division of Administration Bureau of General Services 407 South Calhoun Street Tallahassee, Florida 32399
THE PROJECT OR DESIGNATED PORTION SHALL INCLUDE:
TO BE COMPLETED BY ARHITECT/ENGINEER THROUGH SUBSTANTIAL COMPLETION DATE DAYS LIQUIDATED DAMAGES
1. Notice to Proceed (N.T.P)
2. Time Specified in Original Contract for Substantial Completion
3. Time Extension Granted by Change Orders
4. Total Days Allowed to Substantial completion (Add Lines 2 and 3) 0.00
5. 0.00
6. 0.00 -$
ARCHITECT- ENGINEER CONTRACTOR OWNER
Print Name
Signature
Title
Date
Print Name
Title
SignatureN/A - No consultant on this project
Title
Date
FDACS-02021 Rev. 02/16
Below (or attached hereto) is a list of items to be completed or corrected by the Contractor. The ommission of items on such list does not alter the responsibility of the Contractor to complete all work in accordance with the Contract Documents.
Substantial Completion Date Overrun (Subtract Line 4 from 5 and Enter Overrun. If line 5 less than line 4, enter 0.)
Substantial Completion date & actual days from N.T.P.
through Substantial Completion date
DATE
Certificate of Occupancy Date:
(OR COMPLETION CERTIF. DATE)
Date of Substantial Completion:
FDACS Contract or PO No:
FDACS Complete Project Name:
Print Name
Date
WILTON SIMPSON
COMMISSIONER
The work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the project or portion thereof designated below is hereby established as entered above.
Insert Number Only for Damages
Per Day
The Owner acknowledges the work or designated portion thereof as substantially complete on the date indicated above..
The work under this contract as stated above is Substantially Complete on the Date set above in accordance with the terms of the contract.
The work under this contract as stated above is Substantially Complete on the Date set above in accordance with the terms of the contract.The Contractor will complete or correct the work on the list of items above (or attached hereto) within the time prescribed in the contract from the above Date of Substantial Completion.
Florida Department of Agriculture and Consumer Services Division of Administration
Bureau of General Services
CERTIFICATE OF SUBSTANTIAL COMPLETION
From: Date From:
Date To:
To:
Florida Department of Agriculture and Consumer Services Division of Administration Bureau of General Services 407 South Calhoun Street Tallahassee, Florida 32399
CHANGE ORDER SUMMARY CONTRACT AMOUNT SUMMARY
ADDITIONS DEDUCTIONS
Date Approved -$ (column G on continuation sheet)
PERCENT COMPLETE
5. Retainage:
a. 5% WORK COMPLETED
b. 5% STORED MATERIALS
CURRENT TOTALS -$ -$ (line 5a + 5b or total in column I on continuation sheet)
Net change by Change Orders -$ (line 4 less line 5)
CONTRACT TIME SUMMARY
Base Contract Calendar Days: (line 6 from prior certificate)
Adjusted Days by Change Order:
Revised Contract Days:
Elapsed Days to Date:
Net Days Remaining: 9. Balance To Complete Including Retainage Estimated Days Ahead (+) or Behind (-): (line 3 less line 6)
CONTRACTOR
(Signature)
Date
FDACS-02022 Rev. 02/16
WILTON SIMPSON
COMMISSIONER
(Contractor)
Total Approved this Request
(Print Division Contract Manager Name)
Florida Department of Agriculture and Consumer Services
CONTRACTOR'S REQUEST FOR PAYMENT
Print Architect/Engineer Name
Division of Administration Bureau of General Services
Signature of Architect/Engineer Date Signature of Division Contract Manager
APPROVEDARCHITECT- ENGINEER CERTIFICATE FOR PAYMENT
I certify that I have investigated and verified this Progress Payment Application; that to the best of my knowledge and belief, the above application is a true statement of the value of the work performed and the materials suitable stored on the site; that all work and materials included in this Certificate have been observed by me or by my authorized assistants; that all work has been performed and material supplied in full accordance with the terms of this Contract; and I approve for payment the amount noted above.
I certify, by evidence of signature below, that I am the Contract Manager and the provided information is true and correct; the goods and services have been satisfactorily received and payment is now due. I understand that the office of the State Chief Financial Officer reserves the right to require additional documentation and/or to conduct periodic post-audits of any agreements.
CERTIFICATION BY THE CONTRACTOR: I certify that all items and amounts on this Application are correct, that all work has been performed and material supplied in full accordance with the terms and conditions of the Contract, and that all materialmen, laborers and subcontractors, as defined in Chapter 713.01, Florida Statutes, have been paid the amounts due them out of any previous payments made to the contractor by the Owner. Further, I agree to promptly pay each materialmen, laborer and subcontractor, as defined in Chapter 713.01, Florida Statutes, upon receipt of payment from the Owner, out of the amount paid to me on, account of such materialman's laborer's or subcontractor's work, the amount to which said materialman, laborer and subcontractor is entitled, reflecting the percentage actually retained, if any, from payments to myself on account of such materialman's, laborer's and subcontractor's work.
FDACS Contract or PO No:
Pay Request No:
(Title, company name, date)
1. Original Contract Sum……………………………………
2. Net Change by Change Orders….………………………
3. CONTRACT SUM TO DATE (line 1 ± 2)……………………
4. Total Completed & Stored to Date (EARNED)……………
-$ 8. CURRENT PAYMENT DUE
(Division Contract Manager)
Change Order totals previously approved by Owner
Number
FDACS Complete Project Name:
Total Retainage…………………………………….
6. Total Earned Less Retainage……………………………
7. Less Previous Billings……………………………………
| STATE PROJECT NO: |
| STATE MINORITY VENDOR DESIGNATION: |
| FDACS PROJECT NAME AND LOCATION 1: |
| FDACS PROJECT NAME AND LOCATION 2: |
| hereinafter called the Department and: |
| hereinafter: |
| undefined: |
| DRAWINGS: |
| undefined_2: |
| SPECIFICATIONS 1: |
| SPECIFICATIONS 2: |
| ADDENDA Input field: |
| ADDENDA 1: |
| ADDENDA 2: |
| ADDENDA 3: |
| Input Field Article 2: |