Exhibit 9 Key Personnel Resume Format.docx

DOCX document 14 KB Posted

Attached to
Edith Green Wendell Wyatt (EGWW) Federal Building - Aquatherm Domestic Hot Water Service (DHWS) Pipe Replacement (Project 2)
Solicitation number
EQ10PCPA2-20-0027
Issued by

About this file

This document contains a key personnel resume format template and details of a federal contract opportunity for pipe replacement services at the Edith Green Wendell Wyatt Federal Building in Portland, Oregon. The General Services Administration Public Buildings Service Region 10 is seeking to replace domestic hot water piping installed in 2013 with polypropylene that has experienced ten failures since 2018. The scope of work under Project 2 includes removing all PP-R piping distributing hot water in zones 2 and 3, replacing it with copper, replacing associated water heaters, pumps, and fixtures, and restoring all affected building finishes. The contractor will also provide construction management, commissioning, and operations and maintenance support services during and after the project.

View the file

Other files

File Type Posted
EGWW Aquatherm DHWS Replacement (Project 2) - Solicitation 8.26.20 (Amd 02).docx DOCX document
EGWW Aquatherm DHWS Replacement (Project 2) - Agreement 8.26.20 (Amd 02).docx DOCX document
Exhibit 7 Wage Determination Gen Decision OR20200029 Mod 8 08.21.2020 (Amd 02).pdf PDF
Exhibit 11 - EGWW Aquatherm Pre-Proposal RFI Log 8.26.20 (Amd 02).docx DOCX document
Amd 02 SF30.pdf PDF
EGWW Aquatherm DHWS Replacement (Project 2) - Solicitation 8.18.20 (Amd 01).docx DOCX document
Exhibit 11 - EGWW Aquatherm Pre-Proposal RFI Log 8.18.20.docx DOCX document
Exhibit 7 Wage Determination Gen Decision OR20200029 Mod 7 08.14.2020.pdf PDF
Amd 01 SF30.pdf PDF
EGWW Aquatherm DHWS Replacement (Project 2) - Agreement 8.18.20 (Amd 01).docx DOCX document
EGWW Aquatherm DHWS Replacement (Project 2) - Solicitation 7.23.20.docx DOCX document
Exhibit 00 Pre-Proposal Conference Job Walk.docx DOCX document
Exhibit 10 Project Experience.docx DOCX document
EGWW Aquatherm DHWS Replacement (Project 2) - Solicitation 7.23.20.docx DOCX document
Exhibit 3 EGWW DHWS Design Build SOW (P2).docx DOCX document
EGWW Aquatherm DHWS Replacement (Project 2) - Agreement 7.23.20.docx DOCX document
Exhibit 4 Performance Evaluation Survey - Commercial Client.docx DOCX document
Exhibit 0 SBU Document.docx DOCX document
Exhibit 1 Schedule (P2).pdf PDF
Exhibit 5 GACA - GSA Affiliated Customer Accounts May 2014.docx DOCX document
Exhibit 2 SF1442 (P2).pdf PDF
Exhibit 8 GC Reps and Certs May 2020 508 (P2).docx DOCX document
Exhibit 7 Wage Determination Gen Decision OR20200029 Mod 6 07.17.2020.pdf PDF
Exhibit 6 Price and Services Schedule (P2).docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY PERSONNEL RESUME FORMAT

Provide information, listed below, on separate sheets showing qualifications of each key personnel individual. NOTE: Resumes shall only be provided for positions identified on the list of key personnel identified in the Solicitation.

(a) Name:

(b) Current Position/Title:

(c) Proposed Assignment on this Project, including specific duties proposed to be performed on this Project while in this proposed role: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(d) No. of Years in Same Assignment as Proposed on the Project__________________________

(e) Name of Your Firm___________________________________________________________

(f) No. of Years: With this Firm__________ With other Firms____________

(g) Education:

Degree(s) earned: _______________________________________________________________ School attended: ________________________________________________________________ Year Degree granted: ____________________________________________________________ Degree field/specialization: ________________________________________________________ Specialized Training: ____________________________________________________________

(h) Active Registration, if any:

Type: _______ No.____________, State(s) __________, First Year/ Current Year ______/_____

(i) Describe Your Specific Experience and Qualifications Relevant to this Project: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

(j) Up to three (3) relevant project examples:

Project Title: ___________________________________________________________________ Project Location: ________________________________________________________________ Project Dollar Value:_____________________________________________________________ Project Size (SF): _______________________________________________________________ Delivery Method (i.e. D/B, DBB, CMc, etc.): _________________________________________ Position Held: __________________________________________________________________ Duties performed: _______________________________________________________________ Company employed with during Project: _____________________________________________

File details come from the government source that posted it. Updated .