Exhibit_6_Base_Repair_Area_List_11.1.24.pdf
PDF 58 KB Posted
- Solicitation number
- ITB-2025-1249
- Issued by
- Seminole County, Florida
About this file
This is a Base Repair Areas List exhibit for the City of Casselberry's PW 2309 Road Rehabilitation project, a comprehensive infrastructure improvement initiative spanning multiple locations throughout the municipality in Seminole County, Florida. The document itemizes isolated base repair locations across seven streets and roadways, including Azalea Avenue, Lake Ann Lane, Lake Griffin Circle, Surrey Run, Sundown Trail, North Cypress Way, and Chaney Court. The base repair work encompasses a total of 824 square yards distributed across 15 distinct repair areas, with individual repair lengths ranging from 12 to 113 feet and widths varying from 7 to 70 feet. The project involves milling and resurfacing approximately 7.267 miles of roadways and trails, with additional work including isolated base repairs, curb ramp construction and replacement, concrete sidewalk and curb installation, detectable warnings, traffic signal loops, and comprehensive signage and pavement markings. A non-mandatory pre-bid meeting was conducted on December 5, 2024, with bids due January 14, 2025, before 2:00 p.m. The project timeline requires 150 consecutive calendar days for substantial completion from the Notice to Proceed, with final completion required within 30 days thereafter.
The engineer's estimate for the entire project totals $2,200,501.09, including a 5% contract amendment allowance of $105,000. Two primary bidders submitted proposals: Cathcart Construction Company at $5,399,711.18 and MASCI General Contractor, Inc. at $2,977,679.26, with both bids including 5% bid bonds. The project requires contractors to have at least five years of experience in similar infrastructure projects, maintain Florida business registration, and comply with all ADA standards, warm mix asphalt specifications (CASB 334), and local storm water pollution prevention requirements. Insurance requirements include comprehensive general liability coverage, automobile liability, and workers' compensation. The contract will be awarded to the lowest, most responsive, and responsible bidder. The solicitation includes four alternative bid options for hot mix asphalt replacement, storm pipe replacement on Sundown Trail, additional grading on South Cypress Way, and alternative crosswalk construction methods. The city reserves the right to reject any or all bids, waive technicalities, and re-advertise the project if deemed in the municipality's best interest.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PW 2309 Road Rehabilitation – Various Streets (2023)
BASE REPAIR AREAS LIST
Street Location Repair Length Width SY Comments Plan Sheet
AZALEA AVENUE Entire Paved Section FD 113 15 252 Entire Paved Section 49
Intersection of Chaney Dr FD 24 33 32 50
Intersection of Chaney Dr FD 18 13 14 50
Ivey Rd at Frances Ave FD 87 70 171 51
House No. 282 FD 55 17 104 51
LAKE ANN LN 100' N. of Howell Branch Rd FD 45 22 70 NB Lane & SB Left Turn Lane 52
LAKE GRIFFIN CIR NE Corner of Cottage Ct FD 12 11 15 53
Intersection of Misty Oaks Run FD 20 12 27 NB Lane across from Misty Oaks 54
Houses No. 312 & 316 FD 22 20 49 Between the driveways of 312 & 316 54
Intersection of Woodstream Ln FD 22 13 32 Width of Sundown in front of No. 469 56
Houses No. 469 & 473 FD 29 7 22 Width of Sundown between Curb Inlets 56
SURREY RUN Southern Intersection of Bridle Path FD 18 18 36 Manhole 55
Subtotal 824
SUNDOWN TR
N. CYPRESS WAY
CHANEY CT
IVEY RD
5/15/2024
File details come from the government source that posted it. Updated .