ITB-2025-1249_Exhibit_2_PW_2309_Bid_Form_Revised_1.6.25.xlsx
XLSX spreadsheet 35 KB Posted
- Solicitation number
- ITB-2025-1249
- Issued by
- Seminole County, Florida
About this file
This is a bid form (ITB-2025-1249) for the City Wide Paving 2023 project (PW 2309) in Florida, involving road rehabilitation, ADA improvements, and pavement reconstruction. The project encompasses milling and resurfacing various roadways and trails across multiple city locations, including isolated base repairs, new and replacement curb ramps, signing, and pavement markings. The comprehensive scope includes maintenance of traffic, clearing and grubbing, concrete work (sidewalks, curbs, driveway aprons), detectable warnings, traffic signal loops, manhole and valve adjustments, and adherence to FDOT standard specifications and Storm Water Pollution Prevention Plan requirements.
The engineer's estimate for the project totals $2,200,501.09, which includes a 5% contract amendment allowance of $105,000. The bid form includes four alternative options: Hot Mix Asphalt replacement, storm pipe replacement on Sundown Trail, additional grading on S Cypress Way, and asphalt raised crosswalks in lieu of concrete. The project specifies warm mix asphalt using the City's CASB 334 specification and mandates that all pedestrian facilities comply with current Americans with Disabilities Act (ADA) standards. The bid form itemizes 45 distinct line items with quantities and potential unit prices, covering everything from mobilization to pavement markings, with a focus on comprehensive infrastructure improvement and accessibility.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
| PW 2309 City Wide Paving 2023 | |||||||||
| BID #xxxxxxx | |||||||||
| Applicable TP * | Item No. | Description | Unit | Qty | Unit Price($) | Amount ($) | |||
| FDOT | County STD | County AMD | Supplemental TP | Milling, Resurfacing, Microsurfacing, & ADA Improvements | |||||
| X | 101-1 | Mobilization | LS | 1 | $ - 0 | $ - 0 | |||
| X | 102-1 | Maintenance of Traffic | LS | 1 | $ - 0 | $ - 0 | |||
| X | 104-30S | Prevention, Control, and Abatement of Erosion and Water Pollution | LS | 1 | $ - 0 | $ - 0 | |||
| 110-1-1 | Clearing & Grubbing | AC | 1.5 | $ - 0 | $ - 0 | ||||
| 110-4-10 | Removal of Existing Concrete | SY | 1,838 | $ - 0 | $ - 0 | ||||
| X | 160-4 | Type B Stabilization | SY | 779 | $ - 0 | $ - 0 | |||
| 285-70-5 | Optional Base, Base Group 05 (Type B-12.5 Only) | SY | 824 | $ - 0 | $ - 0 | ||||
| 285-70-9 | Optional Base, Base Group 09 (Type B-12.5 Only) | SY | 779 | $ - 0 | $ - 0 | ||||
| 305-1 | Bituminous Crack and Joint Sealing | GAL | 925 | $ - 0 | $ - 0 | ||||
| 327-70-6 | Milling Existing Asphalt Pavement, 1.5" Avg Depth | SY | 17,841 | $ - 0 | $ - 0 | ||||
| 327-70-23 | Milling Existing Asphalt Pavement, 6" Avg Depth | SY | 824 | $ - 0 | $ - 0 | ||||
| 334-1-12 | WMA Type SP 9.5 Level B | TN | 1,612 | $ - 0 | $ - 0 | ||||
| 335-2 | Microsurface Double, 32-36 LBS/sy | SY | 82,958 | $ - 0 | $ - 0 | ||||
| 350-4-5 | Reinforced Concrete Pavement, 8" | SY | 708 | $ - 0 | $ - 0 | ||||
| X | 570-1-2S | Performance turf, sod, Bahia | SY | 704 | $ - 0 | $ - 0 | |||
| 425-5 | Manhole, Adjust | EA | 13 | $ - 0 | $ - 0 | ||||
| 425-6 | Valve Boxes, Adjust | EA | 1 | $ - 0 | $ - 0 | ||||
| 515-1-2 | Pipe Handrail - Guiderail, Aluminum | LF | 20 | $ - 0 | $ - 0 | ||||
| 520-1-10 | Concrete Curb & Gutter, Type F | LF | 71 | $ - 0 | $ - 0 | ||||
| 520-1-99 | Concrete Curb & Gutter, Miami Curb | LF | 1,330 | $ - 0 | $ - 0 | ||||
| 520-3 | Concrete Valley Gutter | LF | 447 | $ - 0 | $ - 0 | ||||
| 522-1 | Concrete Sidewalk and Driveways, 4" Thick | SY | 1,882 | $ - 0 | $ - 0 | ||||
| 522-2 | Concrete Sidewalk and Driveways, 6" Thick | SY | 897 | $ - 0 | $ - 0 | ||||
| 527-2 | Detectable Warnings | SF | 1,716 | $ - 0 | $ - 0 | ||||
| 660-2-146 | Type 'F' Loop Assembly, 40' | AS | 4 | $ - 0 | $ - 0 | ||||
| X | 700-1-50 | Single Post Sign, Relocate | EA | 10 | $ - 0 | $ - 0 | |||
| X | 706-3 | Retro-Reflective Pavement Markers | EA | 553 | $ - 0 | $ - 0 | |||
| X | 710-11-101 | Painted Pavement Markings, Standard, White, Solid, 6" | GM | 6.08 | $ - 0 | $ - 0 | |||
| X | 710-11-123 | Painted Pavement Markings, Standard, White, Solid, 12" | LF | 3,796 | $ - 0 | $ - 0 | |||
| X | 710-11-125 | Painted Pavement Markings, Standard, White, Solid, 24" | LF | 3,520 | $ - 0 | $ - 0 | |||
| X | 710-11-160 | Painted Pavement Markings, Standard, White, Message | EA | 109 | $ - 0 | $ - 0 | |||
| X | 710-11-170 | Painted Pavement Markings, Standard, White, Arrows | EA | 25 | $ - 0 | $ - 0 | |||
| X | 710-11-201 | Painted Pavement Markings, Standard, Yellow, Solid, 6" | GM | 3.33 | $ - 0 | $ - 0 | |||
| X | 711-11-123 | Thermoplastic, Standard, White, Solid, 12" | LF | 3,796 | $ - 0 | $ - 0 | |||
| X | 711-11-125 | Thermoplastic, Standard, White, Solid, 24" | LF | 3,520 | $ - 0 | $ - 0 | |||
| X | 711-11-130 | Thermoplastic, Standard, White, Vertical Deflection Marking | EA | 24 | $ - 0 | $ - 0 | |||
| X | 711-11-140 | Thermoplastic, Standard, White, Vertical Deflection Advance Warning Marking | EA | 14 | $ - 0 | $ - 0 | |||
| X | 711-11-160 | Thermoplastic, Standard, White, Message | EA | 109 | $ - 0 | $ - 0 | |||
| X | 711-11-170 | Thermoplastic, Standard, White, Arrows | EA | 25 | $ - 0 | $ - 0 | |||
| X | 711-16-101 | Thermoplastic, Standard, White, Solid, 6" | GM | 6.08 | $ - 0 | $ - 0 | |||
| X | 711-16-201 | Thermoplastic, Standard, Yellow, Solid, 6" | GM | 3.33 | $ - 0 | $ - 0 | |||
| X | 715-68000 | Light Pole Complete, Relocate | EA | 1 | $ - 0 | $ - 0 | |||
| X | 920-520-1 | Raised Crosswalk, Type RC Curb With Plate/Grate | LF | 320 | $ - 0 | $ - 0 | |||
| * indicate which TP the bid item references | SUBTOTAL BID PRICE, Resurfacing | $0.00 | |||||||
| Plus | Authorized Contract Amendments (5% of Subtotal Bid Price, Road Construction) | $ - 0 | |||||||
| TOTAL BID PRICE, Resurfacing | $0.00 |
TOTAL BID PRICE written in words:
| BID ALTERNATIVE #1, Hot Mix Asphalt (HMA) in lieu of Warm Mix Asphalt (WMA) | ||||||
| X | 334-1-12 | REMOVE - WMA Type SP 9.5 Level B | TN | 1,612 | $ - 0 | $ - 0 |
| 334-1-52 | HMA Type SP 9.5, TRAFFIC B, PG76-22 | TN | 1,612 | $ - 0 | $ - 0 | |
| X | Subtotal, Bid Alternative #1 | $0.00 |
| BID ALTERNATIVE #2, Replace Storm Pipe on Sundown Trail (Between 469 & 473) | ||||||
| X | 160-4 | Type B Stabilization | SY | 21 | $ - 0 | $ - 0 |
| 430-175-124 | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 24"S/CD | LF | 34 | $ - 0 | $ - 0 | |
| X | Subtotal, Bid Alternative #2 | $0.00 |
| BID ALTERNATIVE #3, Additional Grading on S Cypress Way at Lime Rd | ||||||
| X | 120-6 | Embankment | CY | 77.28 | $ - 0 | $ - 0 |
| 570-1-2S | Performance turf, sod, Bahia | SY | 504 | $ - 0 | $ - 0 | |
| X | Subtotal, Bid Alternative #3 | $0.00 |
| BID ALTERNATIVE #4, Asphalt Raised Crosswalks in lieu of Concrete | ||||||
| X | 350-4-5 | REMOVE - Reinforced Concrete Pavement, 8" | SY | 458 | $ - 0 | $ - 0 |
| 334-1-52 | HMA Type SP 9.5, TRAFFIC B, PG76-22 | TN | 38 | $ - 0 | $ - 0 | |
| 523-3 | Patterned Pavement, Vehicular Areas | SY | 165 | $ - 0 | $ - 0 | |
| X | Subtotal, Bid Alternative #4 | $0.00 |
&"Times New Roman,Bold"PRICE SCHEDULE
&"Times New Roman,Bold"ESTIMATE &P of &N &"Times New Roman,Bold"&8Bid #xxxxxxx&"Times New Roman,Regular"&12
ESTIMATE
| PW 2309 City Wide Paving 2023 | |||||||||
| Engineer's Estimate | |||||||||
| Applicable TP * | Item No. | Description | Unit | Qty | Unit Price($) | Amount ($) | |||
| FDOT | County STD | County AMD | Supplemental TP | Milling, Resurfacing, Microsurfacing, & ADA Improvements | |||||
| X | 101-1 | Mobilization | LS | 1 | $ 97,000.00 | $ 97,000.00 | |||
| X | 102-1 | Maintenance of Traffic | LS | 1 | $ 58,000.00 | $ 58,000.00 | |||
| X | 104-30S | Prevention, Control, and Abatement of Erosion and Water Pollution | LS | 1 | $ 20,000.00 | $ 20,000.00 | |||
| 110-1-1 | Clearing & Grubbing | AC | 1.5 | $ 45,000.00 | $ 67,500.00 | ||||
| 110-4-10 | Removal of Existing Concrete | SY | 1,838 | $ 61.33 | $ 112,724.54 | ||||
| X | 160-4 | Type B Stabilization | SY | 779 | $ 15.39 | $ 11,988.81 | |||
| 285-70-5 | Optional Base, Base Group 05 (Type B-12.5 Only) | SY | 824 | $ 44.00 | $ 36,256.00 | ||||
| 285-70-9 | Optional Base, Base Group 09 (Type B-12.5 Only) | SY | 779 | $ 55.00 | $ 42,845.00 | ||||
| 305-1 | Bituminous Crack and Joint Sealing | GAL | 925 | $ 25.00 | $ 23,125.00 | ||||
| 327-70-6 | Milling Existing Asphalt Pavement, 1.5" Avg Depth | SY | 17,841 | $ 3.57 | $ 63,692.37 | ||||
| 327-70-23 | Milling Existing Asphalt Pavement, 6" Avg Depth | SY | 824 | $ 12.00 | $ 9,888.00 | ||||
| 334-1-12 | WMA Type SP 9.5 Level B | TN | 1,612 | $ 191.97 | $ 309,455.64 | ||||
| 335-2 | Microsurface Double, 32-36 LBS/sy | SY | 82,958 | $ 4.94 | $ 409,812.52 | ||||
| 350-4-5 | Reinforced Concrete Pavement, 8" | SY | 708 | $ 132.00 | $ 93,456.00 | ||||
| X | 570-1-2S | Performance turf, sod, Bahia | SY | 704 | $ 5.12 | $ 3,604.59 | |||
| 425-4 | Inlets, Adjust | EA | 0 | $ 850.00 | $ - 0 | ||||
| 425-5 | Manhole, Adjust | EA | 13 | $ 300.00 | $ 3,900.00 | ||||
| 425-6 | Valve Boxes, Adjust | EA | 1 | $ 150.00 | $ 150.00 | ||||
| 515-1-2 | Pipe Handrail - Guiderail, Aluminum | LF | 20 | $ 81.63 | $ 1,632.60 | ||||
| 520-1-10 | Concrete Curb & Gutter, Type F | LF | 71 | $ 49.31 | $ 3,501.01 | ||||
| 520-1-99 | Concrete Curb & Gutter, Miami Curb | LF | 1,330 | $ 45.00 | $ 59,850.00 | ||||
| 520-3 | Concrete Valley Gutter | LF | 447 | $ 76.89 | $ 34,369.83 | ||||
| 522-1 | Concrete Sidewalk and Driveways, 4" Thick | SY | 1,882 | $ 82.43 | $ 155,133.26 | ||||
| 522-2 | Concrete Sidewalk and Driveways, 6" Thick | SY | 897 | $ 112.41 | $ 100,831.77 | ||||
| 527-2 | Detectable Warnings | SF | 1,716 | $ 44.35 | $ 76,104.60 | ||||
| 660-2-146 | Type 'F' Loop Assembly, 40' | AS | 4 | $ 1,915.87 | $ 7,663.48 | ||||
| X | 700-1-50 | Single Post Sign, Relocate | EA | 10 | $ 302.55 | $ 3,025.50 | |||
| X | 706-3 | Retro-Reflective Pavement Markers | EA | 553 | $ 5.16 | $ 2,853.48 | |||
| X | 710-11-101 | Painted Pavement Markings, Standard, White, Solid, 6" | GM | 6.08 | $ 1,345.21 | $ 8,178.88 | |||
| X | 710-11-123 | Painted Pavement Markings, Standard, White, Solid, 12" | LF | 3,796 | $ 1.80 | $ 6,832.80 | |||
| X | 710-11-125 | Painted Pavement Markings, Standard, White, Solid, 24" | LF | 3,520 | $ 2.74 | $ 9,644.80 | |||
| X | 710-11-160 | Painted Pavement Markings, Standard, White, Message | EA | 109 | $ 80.58 | $ 8,783.22 | |||
| X | 710-11-170 | Painted Pavement Markings, Standard, White, Arrows | EA | 25 | $ 46.34 | $ 1,158.50 | |||
| X | 710-11-201 | Painted Pavement Markings, Standard, Yellow, Solid, 6" | GM | 3.33 | $ 1,384.03 | $ 4,608.82 | |||
| X | 711-11-123 | Thermoplastic, Standard, White, Solid, 12" | LF | 3,796 | $ 4.11 | $ 15,601.56 | |||
| X | 711-11-125 | Thermoplastic, Standard, White, Solid, 24" | LF | 3,520 | $ 7.81 | $ 27,491.20 | |||
| X | 711-11-130 | Thermoplastic, Standard, White, Vertical Deflection Marking | EA | 24 | $ 220.67 | $ 5,296.08 | |||
| X | 711-11-140 | Thermoplastic, Standard, White, Vertical Deflection Advance Warning Marking | EA | 14 | $ 108.00 | $ 1,512.00 | |||
| X | 711-11-160 | Thermoplastic, Standard, White, Message | EA | 109 | $ 224.70 | $ 24,492.30 | |||
| X | 711-11-170 | Thermoplastic, Standard, White, Arrows | EA | 25 | $ 98.66 | $ 2,466.50 | |||
| X | 711-16-101 | Thermoplastic, Standard, White, Solid, 6" | GM | 6.08 | $ 5,502.00 | $ 33,452.16 | |||
| X | 711-16-201 | Thermoplastic, Standard, Yellow, Solid, 6" | GM | 3.33 | $ 6,181.90 | $ 20,585.73 | |||
| X | 715-68000 | Light Pole Complete, Relocate | EA | 1 | $ 7,272.54 | $ 7,272.54 | |||
| X | 920-520-1 | Raised Crosswalk, Type RC Curb With Plate/Grate | LF | 320 | $ 343.00 | $ 109,760.00 | |||
| * indicate which TP the bid item references | SUBTOTAL BID PRICE, Resurfacing | $2,095,501.09 | |||||||
| Plus | Authorized Contract Amendments (5% of Subtotal Bid Price, Road Construction) | $ 105,000.00 | |||||||
| TOTAL BID PRICE, Resurfacing | $2,200,501.09 |
TOTAL BID PRICE written in words:
| BID ALTERNATIVE #1, Hot Mix Asphalt (HMA) in lieu of Warm Mix Asphalt (WMA) | ||||||
| X | 334-1-12 | REMOVE - WMA Type SP 9.5 Level B | TN | 1,612 | $ (191.97) | $ (309,455.64) |
| 334-1-52 | HMA Type SP 9.5, TRAFFIC B, PG76-22 | TN | 1,612 | $ 168.81 | $ 272,121.72 | |
| X | Subtotal, Bid Alternative #1 | -$37,333.92 |
| BID ALTERNATIVE #2, Replace Storm Pipe on Sundown Trail (Between 469 & 473) | ||||||
| X | 160-4 | Type B Stabilization | SY | 21 | $ 15.39 | $ 323.19 |
| 430-175-124 | PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 24"S/CD | LF | 34 | $ 153.84 | $ 5,230.56 | |
| X | Subtotal, Bid Alternative #2 | $5,553.75 |
| BID ALTERNATIVE #3, Additional Grading on S Cypress Way at Lime Rd | ||||||
| X | 120-6 | Embankment | CY | 77.28 | $ 11.98 | $ 925.79 |
| 570-1-2S | Performance turf, sod, Bahia | SY | 504 | $ 5.12 | $ 2,580.48 | |
| X | Subtotal, Bid Alternative #3 | $3,506.27 |
| BID ALTERNATIVE #4, Asphalt Raised Crosswalks in lieu of Concrete | ||||||
| X | 350-4-5 | REMOVE - Reinforced Concrete Pavement, 8" | SY | 458 | $ (132.00) | $ (60,456.00) |
| 334-1-52 | HMA Type SP 9.5, TRAFFIC B, PG76-22 | TN | 38 | $ 168.81 | $ 6,414.78 | |
| 523-3 | Patterned Pavement, Vehicular Areas | SY | 165 | $ 153.75 | $ 25,368.75 | |
| X | Subtotal, Bid Alternative #4 | -$28,672.47 |
&"Times New Roman,Bold"PRICE SCHEDULE
&"Times New Roman,Bold"ESTIMATE &P of &N &"Times New Roman,Bold"&8Bid #xxxxxxx&"Times New Roman,Regular"&12
File details come from the government source that posted it. Updated .