Exhibit_5_Old_PD_Demolition_Details_6.4.25.pdf

PDF 2 MB Posted

Attached to
Demolition Old Police Department
Solicitation number
RFP-2025-1312
Issued by
Seminole County, Florida

About this file

The document appears to be a demolition project scope for a specific site, with aerial images detailing the exact requirements for site clearance. The project involves comprehensive demolition of a building structure, with specific instructions to remove landscaping, infrastructure, and architectural elements while preserving certain site characteristics. Specific demolition instructions include removing landscaping and trees (except oak trees), sidewalks and curbing, sign walls and flag poles, and demolishing the main structure while leaving the foundation intact. Additional site preparation requirements include protecting the storm system with filter fabric and maintaining existing monitoring wells and asphalt surfaces.

The site appears to be a municipal or government property, with the city handling certain preparatory tasks such as removing the fuel tank. The chiller and generator are included in the demolition scope. Notably, the project requires careful preservation of monitoring wells, with their locations documented in the Request for Proposal (RFP). The demolition seems part of a larger site redevelopment or infrastructure modification project, with careful attention to environmental and site preservation considerations. The aerial images provide precise visual guidance for contractors, showing exact areas for removal and preservation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Landscaping and trees to be removed

Remove sidewalk and curbing

Fuel tank removed by City

Chiller & Generator included with demo

Protect storm system with filter fabric and any other not identified.

Remove all hedges, palms identified all Oaks remain.

Remove sign wall and flag poles

Demo structure leave foundation.

All asphalt will remain, monitoring wells exist and can’t be disturbed.

Documents are within the RFP of the locations of the wells.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
All asphalt will remain, monitoring wells exist and can’t be disturbed. Documents are within the RFP of the locations of the wells.

File details come from the government source that posted it. Updated .