This document is a detailed demolition plan for the Old Police Department located at 4195 South US Highway 17/92 in Casselberry, Florida. The demolition instructions include specific requirements for site preparation and removal, such as removing landscaping and trees, taking down sidewalks and curbing, protecting the storm system with filter fabric, eliminating hedges and palm trees while preserving oak trees, removing sign walls and flag poles, and demolishing the structure while leaving the foundation intact. The plan also notes that the fuel tank will be removed by the city, and the chiller and generator are included in the demolition scope.

The demolition plan specifies that all existing asphalt will remain in place, and monitoring wells on the site cannot be disturbed. The location of these wells is documented in the Request for Proposal (RFP). The aerial images provide a detailed overhead view of the site, highlighting the specific areas and elements to be removed or preserved during the demolition process. The comprehensive instructions suggest a methodical approach to site clearance, with careful consideration of existing infrastructure and environmental constraints.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Landscaping and trees to be removed

Remove sidewalk and curbing

Fuel tank removed by City

Chiller & Generator included with demo

Protect storm system with filter fabric and any other not identified.

Remove all hedges, palms identified all Oaks remain.

Remove sign wall and flag poles

Demo structure leave foundation.

All asphalt will remain, monitoring wells exist and can’t be disturbed.

Documents are within the RFP of the locations of the wells.

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
All asphalt will remain, monitoring wells exist and can’t be disturbed. Documents are within the RFP of the locations of the wells.

File details come from the government source that posted it. Updated .