Exhibit 3. (376511) Drawings.pdf

PDF 10 MB Posted

Attached to
Natural Gas Valve Bi-Annual Exercising Services
Solicitation number
SM-377651
Issued by

About this file

This document is a Natural Gas System Underground Piping Equipment Location Plan for Fermilab Facilities, consisting of 27 sheets of engineering drawings that map the distribution and location of natural gas infrastructure across the Fermilab site.

The plan provides comprehensive facility maintenance documentation showing underground piping networks, equipment locations, and system connections at multiple scales (1" = 200'-0" and 1" = 2400'-0"). The drawings illustrate gas pipe sizes ranging from 1.5 inches to 12 inches in diameter, including materials such as steel, HDPE (high-density polyethylene), and polyethylene. Key infrastructure elements shown include gas valves, pressure regulator stations, tapping valves, gas meters, and test stations identified with equipment numbers and reference locations. The drawings cover distinct operational areas including the Central Utility Building, Wilson Hall, Master Substation, K-TeV facility, Meson Detector Building, Industrial Area, and various external sites such as Giese Road, Kirk Road, Eola Road, and the Village areas (Southwest, Southeast, Northwest). Each sheet includes match line references to adjacent sheets for continuity across the comprehensive site map. The documents are marked "FOR REVIEW ONLY" with dates ranging from February 2010 through July 2023, indicating updates and revisions over time. A photograph of a yellow gas marker post positioned above underground piping is included as a reference image for field identification purposes.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PINE STREET

KIR

K R

OAD

KIR

K R

OAD

P

IN

E S

T R

E E

T

PIN

E STREET

4" GAS MAIN (BY NICOR)

12" GAS MAIN

G

IESE R

O

AD

GAS Co. PIPE LINE

EXIST. N.I. NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

KIRK ROAD &

GIESE ROAD

A.R.F. 2-23-10

60-30-1_Gas

REFERENCE DRAWINGS

FOR REVIEW ONLY !

23 FEB. 2010 (NO CHANGES IN 2021)

UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.90-39 C-1.

MATCH LINE.

SEE SHEET 5.

EQUIPMENT LOCATION PLAN

12" GAS MAIN

W

ILSO

N STREET

SITE 70

8" STEEL

NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

WILSON STREET

SITE 70

A.R.F. 2-23-10

60-30-1_Gas

REFERENCE DRAWINGS

FOR REVIEW ONLY !

23 FEB. 2010UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.91-15 C-1 & C-2.

MATCH LINE.

SEE SHEET 21.

MATCH LINE.

SEE SHEET 16.

M A

T C

H L

IN

E

S

E E

S H

E E

T

9.

EQUIPMENT LOCATION PLAN

NO CHANGES IN FEB 2021

W

ILSO

N STREET

8" STEEL

TOW

N R

OAD

NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

WILSON STREET &

TOWN ROAD

A.R.F. 2-23-10

60-30-1_Gas

REFERENCE DRAWINGS

FOR REVIEW ONLY !

23 FEB. 2010

UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.91-15 C-1 & C-2.

S E

E S

H E

E T

8.

M A

T C

H L

IN

E

MATCH LINE.

SEE SHEET 22.

2" S

TEEL

NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

VILLAGE TO

WILSON STREET

A.R.F. 2-23-10

60-30-1_Gas

REFERENCE DRAWINGS

13-1-12 M-41.

FOR REVIEW ONLY !

23 FEB.2010

UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.3-5-17 PC-10, PC-11, PC-12 & PC-13.

MATCH LINE.

SEE SHEET 26.

MATCH LINE.

SEE SHEET 18.

M A

T C

H L

IN

E

S

E E

S H

E E

T

2.

TOW

N R

OAD

W

ILSO

N STREET

W

ILSO

N

STREET

8"

2"

8" STEEL

NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

WILSON STREET &

TOWN ROAD

BENNETTK 7/10/2023

60-30-1_Gas

REFERENCE DRAWINGS

91-15 C-1 & C-2.

FOR REVIEW ONLY !

23 FEB. 2010

UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.3-5-17 PC-12, PC-13 & PC-15.

S E

E S

H E

E T

1.

M A

T C

H L

IN

E

MATCH LINE.

SEE SHEET 27.

MATCH LINE.

SEE SHEET 19.

EQUIPMENT LOCATION PLAN

GAS006

NO CHANGES IN FEB 2021

GVBS038

GVBS037GVBS036

SITE 55

EOLA ROAD

E O

LA

R

O A

D

R O

AD E

SWENSON ROAD

4" MDPE

1" MDPE

1-1/4" MDPE

NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

SITE 55

A.R.F. 2-23-10

60-30-1_Gas

REFERENCE DRAWINGS

FOR REVIEW ONLY !

23 FEB. 2010

UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.3-5-111 C-6 & C-13.

S E

E S

H E

E T

3.

M A

T C

H L

IN

E

MATCH LINE.

SEE SHEET 20.

M A

T C

H L

IN

E

S

E E

S H

E E

T

5.

E., J

E . R

.R

W

ILSO

N STREET

8"

NATURAL GAS SYSTEM

SCALE: 1" = 200'-0".

NATURAL GAS SYSTEM

UNDERGROUND PIPING

WILSON STREET

TO WARRENVILLE

A.R.F. 2-23-10

60-30-1_Gas

REFERENCE DRAWINGS

91-15 C-1 & C-2.

FOR REVIEW ONLY !

23 FEB. 2010UNDERGROUND PIPING

PREVIOUS DRAWING

NEW DRAWING.3-5-17 PC-15

S E

E S

H E

E T

6.

M A

T C

H L

IN

E

MATCH LINE.

SEE SHEET 22.

EQUIPMENT LOCATION PLAN NO CHANGE FEB 2021

Natural Gas Valve Drawings (376511)
Example Photo of Valve Boxes (376511)

File details come from the government source that posted it. Updated .