About this file
This is a contract plans document prepared by Vanasse Hangen Brustlin, Inc. for the City of Casselberry, Florida, detailing roadway rehabilitation and ADA compliance improvements designated as Project PW 2309. The project encompasses approximately 7.267 miles of road rehabilitation across multiple city locations, including milling and resurfacing of roadways and trails, construction and replacement of curb ramps, sidewalk and curb installation, detectable warning devices, signage adjustments, pavement markings, and isolated base repairs. The contract plans set includes general notes, typical curb ramp details, raised crosswalk details, intersection plans for multiple locations, and base repair area specifications. A non-mandatory pre-bid meeting was conducted on December 5, 2024, with bids due January 14, 2025, before 2:00 p.m. The project duration is 150 consecutive calendar days from the Notice to Proceed, with substantial completion required within 150 days and final completion within 30 days thereafter. All work must conform to current ADA standards, FDOT Standard Plans and Specifications (FY2023-24), and the City's warm mix asphalt specification CASB 334.
The contract requires contractors to verify utility locations, obtain necessary permits, provide site security and erosion control measures including NPDES compliance, and coordinate with the City on crosswalk materials and colors. Contractors must maintain one open lane at all times, notify appropriate agencies of traffic disruptions within two days, and comply with OSHA standards and local municipal requirements. The engineer's estimate totals $2,200,501.09 including a 5% contract amendment allowance of $105,000. Two bids were received: Cathcart Construction Company at $5,399,711.18 and MASCI General Contractor, Inc. at $2,977,679.26, both including 5% bid bonds. The contract will be awarded to the lowest, most responsive, and responsible bidder. Insurance requirements include comprehensive general liability coverage, automobile liability, and workers' compensation. The project will be funded through the City's procurement process, with four alternative bid options available including hot mix asphalt replacement, storm pipe replacement, additional grading, and alternative crosswalk construction methods.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CASSELBERRY, FLORIDA
CONTRACT PLANS
Project Location
SHEET
NO.
SHOP DRAWINGS TO BE SUBMITTED TO:
PLANS PREPARED BY:
NOTE: THE SCALE OF THESE PLANS MAY
HAVE CHANGED DUE TO REPRODUCTION.
BRIAN A. MACEWEN, P.E.
VANASSE HANGEN BRUSTLIN, INC.
225 E. ROBINSON STREET, SUITE 300
ORLANDO, FL 32801
PW 2309 ROAD REHABILITATION
ADA & PAVEMENT IMPROVEMENTS
ROADWAY PLANS
PROFESSIONAL OF RECORD: Brian A. MacEwen, P.E.
P.E. NO.: 81432
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\KEYSRD01.dwg5/15/2024 2:27 PM
COMPONENTS OF CONTRACT PLANS SET
ROADWAY PLANS
FINAL SUBMITTAL
DATE: MAY 15, 2024
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
CITY PUBLIC WORKS/UTILITIES DIRECTOR: KELLY H. BROCK, P.E.
CITY PROJECT MANAGER/PUBLIC WORKS DIVISION DIRECTOR: MARTIN BUTCHER
BID NOTES:
1. THIS BID INCLUDES ALL SIDEWALKS, CURB RAMPS, CURBS, SIGNAGE ADJUSTMENTS, MILL AND RESURFACE
LIMITS, BASE REPAIR LIMITS, & NEW ROADWAY CONSTRUCTION. ALL STRIPING ASSOCIATED WITH THE MILL & RESURFACE LIMITS (CROSSWALKS, EDGE STRIPES, CENTERLINE STRIPING, STOP BARS, ETC.) IS ALSO INCLUDED.
2. THIS BID EXCLUDES THE FOLLOWING IMPROVEMENTS TO BE COMPLETED BY OTHERS: MICROSURFACING, NEW SIGNAGE INSTALLATION, AND ALL STRIPING ASSOCIATED WITH THE MICROSURFACING LIMITS. ALL IMPROVEMENTS RELATED TO THE MICROSURFACING LIMITS SHOWN ON THESE PLANS IS FOR INFORMATIONAL PURPOSES ONLY. SEE ADDITIONAL CONTRACT DOCUMENTS TO REFERENCE STREETS TO BE MICROSURFACED.
BEE LINE
EXPRESSWAY
FLORIDA STURNPIKE
PENSACOLA
FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
LAKE CITY
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
NEW PORT RICHEY
TAMPA
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOW
ST PETERSBURG
SARASOTA -
BRADENTON
FT PIERCE
FT MYERS
WEST
PALM
BEACH
FT LAUDERDALE
MIAMI
NAPLES
KEY WEST
CITY OF CASSELBERRY, FLORIDA
CONTRACT PLANS
INDEX OF ROADWAY PLANS
SHEET NO. SHEET DESCRIPTION
1 KEY SHEET
2 - 3 GENERAL NOTES
4 TYPICAL CURB RAMP DETAILS
5 RAISED CROSSWALK DETAILS
6 - 48 INTERSECTION PLANS
49 - 56 BASE REPAIR AREAS
GOVERNING STANDARD PLANS:
Florida Department of Transportation, FY2023-24 S tandard plans for Road and Bridge Construction and applicable Interim Revisions (Irs).
Standard Plans for Road Construction and associated Irs are available at the following website:
GOVERNING STANDARD SPECIFICATIONS:
Florida Department of Transportation, FY2023-24 Standard Specifications for Road and Bridge Construction at the following website:
http://www.fdot.gov/design/Standardplans.shtm http://www.fdot.gov/programmanagement/Implemented/SpecBooks http://www.fdot.gov/design/standardplans/ http://www.dot.state.fl.us/programmanagement/implemented/specbooks https://www.pdf-xchange.com/product/pdf-xchange-editor
GENERAL
1. BASE PLANS WERE GENERATED USING RECENT AERIALS AND FIELD MEASUREMENTS.
DESIGN SURVEY WAS NOT CONDUCTED. THE CONTRACTOR SHALL COORDINATE WITH
THE ENGINEER TO FINALIZE LOCATION AND ORIENTATION OF EACH RAMP PRIOR TO
ITS CONSTRUCTION, AND TO RESOLVE UNFORESEEN ISSUES THAT MAY OCCUR.
2. CONTRACTOR SHALL NOTIFY "SUNSHINE 811" (1-800-432-4770) AT LEAST 72 HOURS
BEFORE EXCAVATING. CONTRACTOR IS REQUIRED TO UPDATE LOCATES MONTHLY
DURING CONTRACT TERM.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY.
CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS AND
LOCAL REQUIREMENTS.
4. ACCESSIBLE ROUTES, PARKING SPACES, RAMPS, SIDEWALKS AND WALKWAYS SHALL
BE CONSTRUCTED IN CONFORMANCE WITH STANDARDS OF THE FEDERAL AMERICANS
WITH DISABILITIES ACT AND WITH STATE AND LOCAL LAWS AND REGULATIONS
(WHICHEVER ARE MORE STRINGENT).
5. AREAS DISTURBED DURING CONSTRUCTION AND NOT RESTORED WITH IMPERVIOUS
SURFACES (BUILDINGS, PAVEMENTS, WALKS, ETC.) SHALL RECEIVE SOD. SOD SHALL
MATCH EXISTING SOD TYPE.
6. WORK WITHIN THE LOCAL RIGHT-OF-WAY SHALL CONFORM TO LOCAL MUNICIPAL
STANDARDS.
7. UPON AWARD OF CONTRACT, CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION
NOTIFICATIONS AND APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND
POST BONDS ASSOCIATED WITH THE WORK INDICATED ON THE DRAWINGS, IN THE
SPECIFICATIONS, AND IN THE CONTRACT DOCUMENTS. DO NOT CLOSE OR OBSTRUCT
ROADWAYS, SIDEWALKS, AND FIRE HYDRANTS, WITHOUT APPROPRIATE PERMITS.
8. ALL SITE SIGNAGE AND PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST
EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. SIGN ASSEMBLY
LOCATIONS SHOWN ON THE PLANS WHICH ARE IN CONFLICT WITH LIGHTING,
UTILITIES, DRIVEWAYS, WHEEL CHAIR RAMPS ETC. MAY BE ADJUSTED AS DIRECTED
BY THE ENGINEER.
9. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S
OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL
CONDITION AT THE CONTRACTOR'S EXPENSE.
10. CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE
AND SHALL BE RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF
SUCH OCCURS.
11. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
12. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO
PREVENT ADVERSE IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPONSIBLE TO
REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
13. THIS PROJECT DISTURBS MORE THAN ONE ACRE OF LAND AND FALLS WITHIN THE
NPDES CONSTRUCTION GENERAL PERMIT (CGP) PROGRAM AND EPA JURISDICTION.
PRIOR TO THE START OF CONSTRUCTION CONTRACTOR IS TO FILE A CGP NOTICE OF
INTENT WITH THE FDEP AND PREPARE A STORMWATER POLLUTION PREVENTION PLAN
IN ACCORDANCE WITH THE NPDES REGULATIONS. CONTRACTOR SHALL CONFIRM THE
OWNER HAS ALSO FILED A NOTICE OF INTENT WITH THE EPA.
14. CONSTRUCTION MATERIALS AND EXCAVATED MATERIALS SHALL BE STORED OR STOCK
PILED WITHOUT CAUSING ANY OBSTRUCTION OR INCONVENIENCE TO THE RESIDENTS
AND/OR BUSINESSES.
15. CONTRACTOR SHALL NOTIFY RESIDENTS AND/OR BUSINESSES TWO WEEKS PRIOR TO
CONSTRUCTION. IN ADDITION, CONTRACTOR SHALL NOTIFY RESIDENTS 48 HOURS
PRIOR TO ANY WATER OUTAGE AND SERVICE OUTAGES SHALL BE PROVIDED AT 2
WEEKS AND 48 HOUR INTERVALS.
16. CONTRACTOR SHALL COMPLY WITH CITY ORDINANCES WITH REFERENCE TO PROJECT
NOISE LEVELS. NORMAL OPERATIONAL HOURS FOR THIS PROJECT SHALL BE 7:00 AM
TO 5:30 PM MONDAY THRU FRIDAY. SATURDAY OPERATIONS IF APPROVED MAY REQUIRE
CONTRACTOR TO PAY CITY STAFF COSTS.
17. CONTRACTOR IS RESPONSIBLE FOR EMPLOYEE CONDUCT AND TEMPORARY RESTROOM
FACILITIES.
18. REFER TO THE CITY'S CONTRACT DOCUMENT FOR PROJECT CLOSE OUT REQUIREMENTS,
INCLUDING RECORD DRAWING AND AS-BUILT SURVEY.
19. CONTRACTOR TO COORDINATE WITH THE CITY TO DETERMINE THE COLOR, MATERIAL,
AND PATTERN FOR THE RAISED CROSSWALKS AND AT GRADE CROSSWALKS.
20. MAILBOX RELOCATIONS SHALL BE IN ACCORDANCE WITH FDOT STANDARD PLANS
110-200.
UTILITIES
1. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN
APPROXIMATE REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S) HAVE
NOT INDEPENDENTLY VERIFIED THIS INFORMATION AS SHOWN ON THE PLANS. THE
UTILITY INFORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE,
SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT
GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT
THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND
BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE
EXACT LOCATIONS, SIZES, AND ELEVATIONS OF THE POINTS OF CONNECTIONS TO
EXISTING UTILITIES AND SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH
EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN
THE PUBLIC RIGHTS OF WAY AND EASEMENTS.
2. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR
EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT
BE COMPLETED AS INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY
SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR, AND THE
INFORMATION FURNISHED IN WRITING TO THE OWNER'S REPRESENTATIVE FOR THE
RESOLUTION OF THE CONFLICT, CONTRACTOR'S FAILURE TO NOTIFY PRIOR TO
PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR
ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE
CONFLICT.
3. RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, GAS
GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH
ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS: ONE INCH
ABOVE SURROUNDING AREA AND TAPER EARTH TO THE RIM ELEVATION.
5. CONTRACTOR SHALL MAKE ARRANGEMENTS FOR AND SHALL BE RESPONSIBLE FOR
PAYING FEES FOR POLE RELOCATION AND FOR THE ALTERATION AND ADJUSTMENT OF
GAS, ELECTRIC, TELEPHONE, FIRE ALARM, AND ANY OTHER PRIVATE UTILITIES,
WHETHER WORK IS PERFORMED BY CONTRACTOR OR BY THE UTILITIES COMPANY.
LAYOUT AND MATERIALS
1. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND
ARE NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE
DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS,
MANUFACTURERS' LITERATURE, SHOP DRAWINGS AND FIELD MEASUREMENTS OF
SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
2. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS,
SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT
SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER
COPIES OF THE PLANS AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE
CONTRACT DOCUMENTS.
DEMOLITION
1. CONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH
APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES.
NO BURNING ALLOWED FOR THIS PROJECT.
EROSION CONTROL
1. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY
APPROPRIATE AGENCIES AND SHALL INSTALL EROSION CONTROL MEASURES AS
IDENTIFIED IN FEDERAL, STATE, AND LOCAL PERMITS, GUIDELINES, REGULATIONS,
AND APPROVAL DOCUMENTS PERTAINING TO THIS PROJECT.
2. CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT
SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH
SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
GENERAL NOTES 1
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\GNNTRD01.dwg5/15/2024 2:29 PM
3. CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH
MATERIALS ARE EXPOSED FOR A MINIMUM OF TIME BEFORE THEY ARE COVERED,
SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION.
4. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND
COVER, CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES
AND CLEAN SEDIMENT AND DEBRIS FROM ENTIRE DRAINAGE AND SEWER SYSTEMS.
5. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO
PREVENT ADVERSE IMPACTS TO OFF SITE AREAS, AND SHALL BE RESPONSIBLE TO
REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO CITY.
6. PURSUANT TO COMPONENT 9.C. CONSTRUCTION SITE RUNOFF - SITE OPERATOR
TRAINING OF THE CITY'S NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
PERMIT, ALL SITE INSPECTORS AND SITE OPERATORS (EMPLOYED BY OR UNDER
CONTRACT WITH THE CITY) INVOLVED IN THE SITE PLAN REVIEW, INSPECTION OR
CONSTRUCTION OF STORMWATER MANAGEMENT, EROSION, AND SEDIMENTATION
CONTROLS SHALL BE CERTIFIED THROUGH THE FLORIDA STORMWATER, EROSION, AND
SEDIMENTATION CONTROL INSPECTOR TRAINING PROGRAM, OR AN EQUIVALENT
PROGRAM APPROVED BY THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
DOCUMENTATION OF SUCH CERTIFICATION SHALL BE PROVIDED TO THE CITY PRIOR
TO COMMENCEMENT OF CONSTRUCTION ACTIVITY.
7. CONTRACTOR SHALL SUBMIT NPDES NOTICE OF TERMINATION (NOT) FORM.
MEASUREMENT AND PAYMENT
1. MATERIALS, EQUIPMENT, SKILLS, TOOLS, AND LABOR WHICH IS REQUIRED TO PERFORM
THE WORK NECESSARY FOR THE PROPER COMPLETION OF THE WORK IN A
SUBSTANTIAL MANNER AND IN COMPLIANCE WITH THE REQUIREMENTS STATED OR
IMPLIED BY THE DRAWINGS AND SPECIFICATIONS SHALL BE FURNISHED AND
INSTALLED BY CONTRACTOR WITHOUT ADDITIONAL COMPENSATION, WHETHER
SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS OR NOT THESE ITEMS ARE
CONSIDERED INCIDENTAL TO THE BID ITEMS SHOWN IN THE BID FORM.
2. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT CLEANUP IS
CONSIDERED A PART OF THE WORK OR CONSTRUCTION. NO PAYMENT WILL BE MADE
UNTIL CLEANUP IS ESSENTIALLY COMPLETE. ANY DAMAGE TO EXISTING STRUCTURES
DURING PROPOSED CONSTRUCTION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE CITY.
3. ANY LANDSCAPING OR IRRIGATION ITEMS (GROUND COVER, BUSHES OR TREES)
DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED TO THE
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
TRAFFIC CONTROL
1. THE CONTRACTOR IS RESPONSIBLE FOR PLACING ADVANCE WARNING SIGNS AND
TRAFFIC CONTROL DEVICES TO PROTECT WORK ZONES. UTILIZE FDOT STANDARD 600
SERIES TO MAINTAIN EXISTING TRAFFIC.
2. THE CONTRACTOR IS RESPONSIBLE FOR INSURING THAT A SAFE, UNOBSTRUCTED
ROUTE EXISTS FOR PEDESTRIANS, AS NECESSARY. UTILIZE FDOT STANDARD 600
SERIES.
3. THE CONTRACTOR SHALL NOTIFY CITY OF CASSELBERRY PUBLIC WORKS DEPARTMENT,
POLICE DEPARTMENT, SEMINOLE COUNTY FIRE DEPARTMENT AND SEMINOLE COUNTY
SCHOOLS WITHIN 2 DAYS OF ANTICIPATED DISRUPTION OF THE NORMAL FLOW OF
TRAFFIC, INCLUDING LANE CLOSURES AND DETOURS.
4. ONE LANE OF THE ROADWAY IS TO REMAIN OPEN AT ALL TIMES.
5. DRIVEWAYS AND INTERSECTIONS SHALL NOT BE BLOCKED.
SIGNING AND PAVEMENT MARKING NOTES
1. PAVEMENT MARKINGS TO CONFORM TO M.U.T.C.D LATEST EDITION, FDOT DESIGN
STANDARDS LATEST EDITION, DISTRICT 5 SIGNING AND PAVEMENT MARKING
PREFERENCES.
2. CONTRACTOR SHALL REMOVE ANY PAVEMENT MARKINGS IN CONFLICT WITH THE
PROPOSED PAVEMENT MARKINGS. EXISTING PAVEMENT MARKINGS SHALL BE REMOVED
BY GRINDING.
3. ALL PAVEMENT MARKINGS TO BE LEAD AND SOLVENT FREE ALKYD THERMOPLASTIC.
4. ALL EXISTING TRAFFIC SIGNS ARE TO REMAIN UNLESS OTHERWISE NOTED ON THE
PLANS.
5. THE SIGN LOCATIONS SHOWN ARE APPROXIMATE AND MAY REQUIRE FIELD
ADJUSTMENT AS DIRECTED BY THE ENGINEER.
6. FOR SIGN INSTALLATION DETAILS, REFER TO FDOT STANDARD PLANS FOR ROAD
CONSTRUCTION NOS. 700-010 AND 700-101.
7. ANY DAMAGE TO EXISTING SIGNS CAUSED BY THE CONTRACTOR'S OPERATIONS SHALL
BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CITY.
8. MINIMUM WIDTH OF PROPOSED CROSSWALK SHALL BE 10 FT, UNLESS OTHERWISE
NOTED IN THE PLANS.
9. ALL PROPOSED NEW SIGNS TO BE BY OTHERS. SHOWN FOR INFORMATIONAL
PURPOSES ONLY.
10. CONTRACTOR TO INCLUDE B/B RPM'S FOR ALL STREETS WHEN A FIRE HYDRANT IS
PRESENT.
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
GENERAL NOTES 2
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\GNNTRD01.dwg5/15/2024 2:29 PM
5'
7' ****
MATCH EXIST.
SIDEWALK
WIDTH
EXIST. 2' MIAMI CURB
& GUTTER TO REMAIN
2'
DETECTABLE
WARNING DEVICE
SEE PLANS FOR LIMITS OF
SIDEWALK RECONSTRUCTION.
SIDEWALK RECONSTRUCTION
SHALL BE EXTENDED TO
NEAREST JOINT.
EXIST. GROUND
SOD VARIES
1.75' AVG.
VARIES(1:3 MAX.) 0.02 1:12
VARIES
5.87' AVG.
4'
VARIES
0.25' AVG.
2' ADA DROP CURB
(SEE DETAIL)N.T.S.
A
A
1' LEVEL
EX
IS
T.
C
ON
C.
3' CURB TRANSITION
(TYP.)
SECTION A-A
MIAMI/DROP
CURB
SOD LIMITS
SOD LIMITS
5' 7' ****
EXIST. 2' MIAMI CURB
& GUTTER TO REMAIN
2'
DETECTABLE
WARNING DEVICE
≤ 1:1
A
EX
IS
T.
C
ON
C.
3' CURB TRANSITION
(TYP.)
MIAMI/DROP
CURB
SOD LIMITS
SOD LIMITS
MATCH TO EXIST.
SIDEWALK
N.T.S.
TYPICAL CURB RAMP WITH
EXISTING SLOPES > 1:12
N.T.S.
TYPICAL CURB RAMP WITH
EXISTING SLOPES <= 1:12
N.T.S.
MIAMI CURB DETAIL
12" 12"
7"9" 6"
NOTES:
1. TYPICAL RAMP LOCATION UNLESS NOTED OTHERWISE BY ALPHA-IDENTIFICATION PER
FDOT STANDARD PLAN INDEX 522-002 OR STAND ALONE DETAIL.
2. ALL CONCRETE WORK ASSOCIATED WITH THE PROPOSED ADA RAMPS AND CURBS
SHALL BE COMPLETED PRIOR TO ANY ROADWAY IMPROVEMENTS WITHIN PROXIMITY OF
SUCH WORK.
3. COSTS ASSOCIATED WITH DROP CURBS CONSTRUCTION SHALL BE INCLUDED WITH
THE PAY ITEM 520-1-99 CONCRETE CURB AND GUTTER, MIAMI CURB (LF).
* RAMP LONGITUDINAL SLOPE SHOULD BE õ 5%. WHEN SLOPES ARE > 5% (8.33% MAX.), THEN THE RAMP LENGTHS ARE AS FOLLOWS:
30 LF MAX. RAMP LENGTH FOR SLOPES > 6.25%
40 LF MAX. RAMP LENGTH FOR SLOPES õ 6.25%
** MAX. SIDEWALK CROSS SLOPE SHALL BE 2%
*** MAX. CURB RAMP SLOPE SHALL BE 1:12
**** 10 FEET FOR TWO-WAY CROSSINGS
EDGE OF TRAVEL
EDGE OF TRAVEL
6'
4'
12'
6' 5'
SPEED CUSHION DETAIL
12" WHITE
MARKINGS/ 12"
SPACING
0.5'
N.T.S.
6'
4'
3'
1:1
3"
SP-9.5 ASPHALT
3'
1'
2'
2'
EDGE OF PAVEMENT
EDGE OF PAVEMENT
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
\\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\TYPSRD01.dwgBrian MacEwen 5/15/2024 2:30:11 PM
TYPICAL CURB RAMP DETAILS
B
B
AA
SECTION D-D
SECTION A-A
SECTION B-B
RAMP
RAMP
RA
ISE
D C
RO
SS
WA
LK
RAISED CROSSWALK WITH RC CHANNEL GUTTER
RAISED CROSSWALK
PLAN VIEW
CURB AND GUTTER
(SEE DETAILS)
RC CHANNEL GUTTER
A
AB
D
D
RAISED CROSSWALK
SECTION A-A
6"6"
7.
RAISED CROSSWALK DETAIL
6"6"
A
A B
B
D
D
RAISED CROSSWALK CURB TRANSITION DETAIL
B
TYPE F CURB TRANSITION
PLAN VIEW
10' 10' 10'
RC CHANNEL GUTTER
I II
IV IV
II I
10' 10'
10'
10'
RAISED CROSSWALK
ISOMETRIC VIEW
12'
C
C
SIDEWALK
SECTION C-C
6"6"
C
C
3.5"
2'-0" MIN.
DETECTABLE WARNING
EDGE OF RAISED CROSSWALK
EDGE OF RAISED CROSSWALK
PAVEMENT
TYPE F CURB
AND GUTTER SIDEWALK
RAISED CROSSWALK
SURFACE
PAVEMENT
RC CHANNEL
GUTTER
PAVEMENT
RAISED CROSSWALK
SURFACE
CAST IRON
FRAME
RC CHANNEL GUTTER
3.5"
RAISED
CROSSWALK
SURFACE
PAVEMENT
RC CHANNEL
GUTTER
EXIST.
TYPE F CURB AND GUTTER
BACK OF SIDEWALK
EDGE OF
RAISED
CROSSWALK
EDGE OF
RAISED
CROSSWALK
III III
GRATE
(6" Typ.)
I - II : TRANSITION FROM SECTION
A-A TO SECTION B-B.
III - IV : TRANSITION FROM SECTION
B-B TO SECTION C-C.
IV - IV : MAINTAIN SECTION D-D.
IV - III : TRANSITION FROM SECTION
C-C TO SECTION B-B.
II - I : TRANSITION FROM SECTION
B-B TO SECTION A-A.
NOTES:
1. PROP. CONC. CROSSWALKS TO INCLUDE
OPTIONAL INTEGRATED COLOR IN BASE
BID INCIDENTAL TO COST OF CONC.
(COLOR TO BE CHOSEN BY CITY)HEEL-SAFE GRATE (TYP.)
2'
2'
2'
SIDEWALK
SIDEWALK
SIDEWALK
12'
RC CHANNEL
GUTTER
CURB & GUTTER
DETECTABLE
WARNING
SURFACE
8" CLASS I (PAVEMENT) CONCRETE W/
#4 @ 8" (E.W.) CENTERED IN SLAB
10' 12' 10'
RAISED CROSSWALK
SECTION A-A
CROSS SECTION VIEW
RAISED CROSSWALK SURFACE
3.5"
¡ RAISED CROSSWALK
MILL & RESURFACE
EXIST. BASE
OVERBUILD (SP-9.5)
0.02
RAISED CROSSWALK
SECTION B-B
CROSS SECTION VIEW
EXISTING BASE
¡ ROADWAY
RAISED CROSSWALK SURFACE
EXISTING ASPHALT
ELEVATION
SIDEWALK
RC CHANNEL GUTTER
RC CHANNEL GUTTER
0.02
PATH
10' 10'12'10'10' 10' 10'
EXIST. TYPE B STABILIZATION
5"-2" BINDER COURSE (ASPHALT TYPE SP)
5"-2" BINDER COURSE (ASPHALT TYPE SP)
EXIST. TYPE B STABILIZATION
SLEEPER SLAB REINFORCEMENT (TYP.) #4 @ 8" (E.W.) CENTERED IN SLAB (TYP.)
#4 @ 8" (E.W.) CENTERED
IN SLAB (AS SHOWN)
8"
MODIFIED
FLEXIBLE
PAVEMENT
DESIGN
MODIFIED
FLEXIBLE
PAVEMENT
DESIGN
CLASS I (PAVEMENT) CONCRETE
(THICKNESS VARIES)
3.5" 3.5"
8" TYP.
4" BINDER COURSE (ASPHALT TYPE SP)4" BINDER COURSE (ASPHALT TYPE SP)
OPTIONAL BASE GROUP
OPTIONAL BASE GROUP
RAISED CROSSWALK
SECTION B-B
VARIES VARIES
TRAVEL
LANE
TRAVEL
LANE
0.02 0.02
PGL
EXIST. TYPE B STABILIZATION
CONCRETE
SIDEWALK
SEE NOTE 1
ASPHALT RAISED CROSSWALK
BID ALTERNATIVE #4
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
RAISED CROSSWALK
DETAILS 5
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\TYPSRD02.dwg5/15/2024 2:30 PM
STOP
ST
OP
CR
YS
TA
L
BO
W L
CI
R
AV
AL
ON
C
T
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
AVALON BLVD
R1-1
SIGN TO REMAIN
M
ATC
H
LIN
E S
H E E T 7
R1-1
SIGN TO REMAIN
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
14 LF OF 24" WHITE STOP BAR
GRIND EXIST. STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
EXIST. STOP BAR
TO REMAIN
INSTALL BIKE LANE MARKINGS
(TYP.)
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
6" SKIP 2'-4" WHITE
N 10 40
Feet
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
AVALON BLVD &
AVALON CT
INTERSECTION PLAN 1
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
ST
OP
STOP
ALL WAY
AL
L
W
AY
ALL W
AY
AVALON BLVD
AV
AL
ON
B
LV
D
LA
D Y
S U S
AN
D R
DEW
DROP PARK
1301 AVALON BLVD
1292 AVALON BLVD
R1-1 R1-3P
SIGNS TO BE
RELOCATED
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
MATCHLINE SHEET 8
M
AT
C H
LI
N E S
H E E T
R1-1 R1-3P
SIGNS TO REMAIN
R1-1 R1-3P
SIGNS TO REMAIN
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
68 LF OF 6"
DOUBLE YELLOW
WITH RPM'S AT
40' C.C. ALONG
CURVE
127 LF OF 6" SOLID DOUBLE YELLOW
W/ Y/Y RPMS @ 40' 0.C. ALONG CURVE
EXIST. STOP BAR TO REMAIN
INSTALL BIKE LANE MARKINGS
(TYP.)
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
EXIST. STOP BAR TO REMAIN
EXIST. WATER VALVE
TO REMAIN
EXIST. STOP BAR TO REMAIN
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
AVALON BLVD & LADY
SUSAN DR
INTERSECTION PLAN 2
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
STOP
AVALON BLVD
P R
IN
C E P
H
IL
IP
D
R
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
CONCRETE REMOVAL
CORNW
ALL CT
R1-1
SIGN TO REMAIN
R1-1
SIGN TO REMAIN
M
ATC
H
LIN
E S
H E E T 9
MATCHLINE SHEET 7
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
129 LF OF 6" DOUBLE
YELLOW WITH Y/Y
RPM'S AT 5' C.C ALONG
CURVE
145 LF OF 6"
DOUBLE YELLOW
WITH Y/Y RPM'S
AT 5' C.C.
ALONG CURVE
EXIST. STOP BAR
TO REMAIN
EXIST. STOP BAR
TO REMAIN
REMOVE EXIST. CONC.
PROP. 14 SF SOD
INSTALL BIKE LANE MARKINGS
(TYP.)
INSTALL BIKE LANE MARKINGS
(TYP.)
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
AVALON BLVD &
PRINCE PHILIP DR
INTERSECTION PLAN 3
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
STOP
AV
ALO
N B
LVD
CAN
TE
R B U R
Y CIR
CANTE
RBURY CIR
R1-1
SIGN BY OTHERS
R1-1
SIGN BY OTHERS
M
AT
C H
LI
N E S
H E E T
MATCHLINE SHEET 16
M
ATC
H
LIN
E S
H E E T 10
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
12 LF OF 24" WHITE
STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
15 LF OF 24" WHITE
STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
191 LF OF 6"
DOUBLE YELLOW
WITH Y/Y RPM'S
AT 5' C.C.
ALONG CURVE
87 LF OF 6"
DOUBLE YELLOW
WITH RPM'S AT
40' C.C. ALONG
CURVE
23 LF OF 6"
DOUBLE YELLOW
WITH Y/Y RPM'S
AT 5' C.C.
ALONG CURVE
INSTALL BIKE LANE MARKINGS
(TYP.)
INSTALL BIKE LANE MARKINGS
(TYP.)
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE
(TYP.)
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
AVALON BLVD &
CANTERBURRY CIR
INTERSECTION PLAN 4
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
AVALON BLVD
CANTERBURY CIR
M
AT
C H
LI
N E S
H E E T
MATCHLINE SHEET 11
MATCHLINE SHEET 17
167 LF OF 6"
DOUBLE YELLOW
WITH Y/Y RPM'S AT
5' C.C. ALONG CURVE
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
N
10 40
Feet
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
AVALON BLVD &
CANTERBURRY CIR
INTERSECTION PLAN 5
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
PRINCE PHILIP DR
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
AV
AL
ON
B
LV
D
R1-1
SIGN TO REMAIN
MATCHLINE SHEET 10
MATCHLINE SHEET 12
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
6" DOUBLE YELLOW
WITH RPM'S AT 40'
C.C. ALONG CURVE
EXIST. STOP BAR
TO REMAIN
INSTALL BIKE LANE MARKINGS
(TYP.)
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
AVALON BLVD & PRINCE
PHILIP DR
INTERSECTION PLAN 6
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
STOP
ALL WAY
AV
AL
ON
B
LV
D
BENWICK WAY
GUINEVERE DR
R1-1
SIGN TO REMAIN
MATCHLINE SHEET 11
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
CONCRETE REMOVAL
R1-1 R1-3P
SIGNS TO REMAIN
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
14 LF OF 24"
WHITE STOP BAR
EXIST. STOP BAR
TO REMAIN
INSTALL BIKE LANE MARKINGS
(TYP.)
6" SOLID WHITE STRIPE
PROP. 4' BIKE LANE (TYP.)
PROP. 4' BIKE LANE (TYP.)
REMOVE EXIST. CONC.
PROP. 19 SF SOD
REMOVE EXIST. CONC.
PROP. 30 SF SOD
6" SKIP 2'-4' WHITE
N 10 40
Feet
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
AVALON BLVD &
BENWICK
INTERSECTION PLAN 7
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:02 PM
S U
S H
W Y
BUTTON RD
LEGEND
DETECTABLE WARNING
M
ATC
H
LIN
E S
H E E T 14
6" DOUBLE YELLOW STRIPE
18" SOLID YELLOW STRIPE (TYP.)
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
SHARROW (TYP.)
BEGIN MILLING & RESURFACING
AT EXIST. PAVEMENT BREAK
PROP. TURN ARROW
(TYP.)
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
BUTTON RD & US HWY 17 92
INTERSECTION PLAN 8
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:03 PM
STOP STOP
BUTTON RD
S U N S E T
D R N
S E M
IN
OLA B
LV
D
LEGEND
DETECTABLE WARNING
R1-1
SIGN TO REMAIN
R1-1
SIGN TO REMAIN
M
AT
C H
LI
N E S
H E E T
6" DOUBLE YELLOW STRIPE
SHARROW (TYP.)
6" SOLID WHITE STRIPE
6" DOUBLE YELLOW STRIPE
18" SOLID YELLOW
STRIPE (TYP.)
6" SOLID
YELLOW STRIPE
6" SOLID WHITE STRIPE
6" SOLID WHITE STRIPE
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
14 LF OF 24" WHITE
STOP BAR
6" SOLID WHITE STRIPE
18" SOLID WHITE STRIPE
(TYP.)
24 LF OF 24" WHITE
STOP BAR
6" SOLID WHITE STRIPE
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
EXIST. STOP BAR
TO REMAIN
EXIST. STOP BAR
TO REMAIN
END MILLING & RESURFACING
AT EXIST. PAVEMENT BREAK
PROP. TURN ARROW
(TYP.)
N 10 40
Feet
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
BUTTON RD & SUNSET DR N
INTERSECTION PLAN 9
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:03 PM
OP
CAMELIA DR
N W
IN
TE
R
PA
RK
D
R
R1-1
SIGN TO BE
RELOCATED
SPECIAL EMPHASIS CROSSWALK
MARKINGS (8' WIDTH) PER
STANDARD PLAN 711-001
GRIND EXIST. CONFLICTING
MARKINGS
17 LF OF 24" WHITE STOP BAR
GRIND EXIST. STOP BAR
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
CAMELIA DR & N WINTER
PARK DR INTERSECTION
PLAN 10
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:03 PM
OP
C
AN
TE
R B U R Y
C
IR
LADY AMY DR
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
NOTE:
LADY AMY DR. NOT
BEING RESURFACED
R1-1
SIGN TO REMAIN
MATCHLINE SHEET 9
M
ATC
H
LIN
E S
H E E T 17
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
EXIST. STOP BAR
TO REMAIN
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
LADY AMY DR &
CANTERBURY CIR
INTERSECTION PLAN 11
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:03 PM
LADY AMY DR
C
AN
TE
R B U R Y
C
IR
R1-1
SIGN TO REMAIN
M
AT
C H
LI
N E S
H E E T
MATCHLINE SHEET 10
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
EXIST. STOP BAR
TO REMAIN
NOTE:
LADY AMY DR. NOT
BEING RESURFACED
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
CANTERBURY CIR &
LADY AMY DR
INTERSECTION PLAN 12
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD01 - CR.dwg5/15/2024 2:03 PM
REPLACE 41' OF MIAMI CURB
REPLACE 39' OF MIAMI CURB
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
CRYSTAL BOWL CIR
CHANEY DR
CH
AN
E Y
CT
REMOVE CONCRETE CROSSING CHANEY DR.
PROP. 15 SF SOD
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
R1-1
SIGN TO REMAIN STOP
EXIST. LIGHT
POLE TO REMAIN
EXIST. LIGHT
POLE TO REMAIN
STOP
R1-1
SIGN TO REMAIN
12 LF OF 24"
WHITE STOP BAR
11 LF OF 24"
WHITE STOP BAR
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
CONCRETE REMOVAL
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
CHANEY DR & CRYSTAL
BOWL CIR
INTERESCTION PLAN 13 18
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD02 - CR.dwg5/15/2024 12:29 PM
OL
D O
AK
P
OI
N T
OA
K P
AR
K P
L
OAK PARK PL
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
12 LF OF 24"
WHITE STOP BAR
GRIND EXIST.
STOP BAR
R1-1
SIGN TO BE
RELOCATED
STOP
REPLACE 41 LF
OF MIAMI CURB
EXIST. MIAMI CURB
TO REMAIN
S U N S E T
D R
IV
E
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
OAK PARK PL INTERSECTION
PLAN 14
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD02 - CR.dwg5/15/2024 12:29 PM
BAY ST
CONST. 6' CONC. S/W
CONST. 6' CONC. S/W
IVE
Y RD
CONST. 6' CONC. S/W
F R
AN
C E S
AV
E
CONST. 6' CONC. S/W
MATCHLINE SHEET 21
12'
12.5'
EXIST. FENCE (TO REMAIN)
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
STOP
R1-1
SIGN TO BE
RELOCATED
9 LF OF 24"
WHITE STOP BAR
10 LF OF 24"
WHITE STOP BAR
STOP
R01-01
SIGN BY OTHERS
EOI
WATER
WATER
EOI
WATER
WATER
BAY ST
CONST. 6' CONC. S/W
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
CONST. 6' CONC. S/W
IVE
Y RD
12'
EXIST. FENCE (TO REMAIN)
MATCH EXIST. S/W
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
STOP
R1-1
SIGN TO BE
RELOCATED
9 LF OF 24"
WHITE STOP BAR
10 LF OF 24"
WHITE STOP BAR
STOP
R01-01
SIGN BY OTHERS
CONST. 6' CONC. S/W
FRANCE
S
AVE
244 FRANCES AVE
243 FRANCES AVE
EXIST. LIGHT POLE & FIRE
HYDRANT (TO REMAIN)
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
FRANCES AVE & BAY ST
INTERSECTION PLAN 15
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD02 - CR.dwg5/15/2024 12:29 PM
SEMINOLA BLVD
FRANCES AVE
BAY STFR
AN
CE
S
AV
E
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
REGRADING
CONST. 6' CONC. S/W
CONST. 5' CONC. S/W
IVEY RD
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
CONST. 20 LF
OF ALUM. HANDRAIL
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
18 LF OF 24" WHITE
7 LF OF 24" WHITE
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
R1-1
SIGN TO REMAIN
STOP
R1-1
SIGN TO REMAIN
STOP
CONST. 6' CONC. S/W
MATCHLINE SHEET 20
10'
30'
15.4' 22'
HE
RE
ST
OP
FO
R
R1-5b
SIGN BY OTHERS
R1-5b
SIGN BY OTHERS
HERE STOP
FOR
R1-5bl
SIGN BY OTHERS
R1-5bl
SIGN BY OTHERS
9 LF OF 24" WHITE
9 LF OF 24" WHITE
HE
RE
ST
OP FO
R
HERE
STOP
FOR
EXIST. MAILBOX
TO REMAIN
EXIST. MAILBOX
TO BE RELOCATED
14 LF OF 24" WHITE
SP
EE
D
LI
M
IT
R2-1 SIGN
TO REMAINSPEED
LIMIT
10'
STOP
R1-1
SIGN TO REMAIN
W1-1 SIGN TO
BE RELOCATED
R2-1 SIGN
TO REMAIN
R5-2
SIGN ASSEMBLY
TO BE RELOCATED
R20'
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
IVEY RD & FRANCES AVE
INTERSECTION PLAN 16
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD02 - CR.dwg5/15/2024 12:29 PM
STOP LE
M
ON
L N
S CYPRESS WAY
LI
M E R
D
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
CONCRETE REMOVAL
REGRADING
R1-1
SIGN BY OTHERS
AHEAD
W11-2 W16-07PL
SIGNS BY OTHERS
W11-2 W16-09P
SIGNS BY OTHERS
M
ATC
H
LIN
E S
H E E T 23
CONST. 5' CONC. S/W
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
10 LF OF 24" WHITE STOP BAR
REGRADE SOD IN FRONT OF S/W TO FILL IN DROP
OFFS TO MEET ADA COMPLIANCE (TYP.)
(BID ALTERNATE)
EXIST. TREE
TO BE REMOVED
REMOVE EXIST. CONC.
PROP. 86 SF OF SOD
EXIST. POLE TO REMAIN
EXIST. LIGHT
POLE TO REMAIN
EXIST. HYDRANT
TO REMAIN
EXIST. COMMUNICATIONS
BOX TO REMAIN
REGRADE SOD IN FRONT OF
S/W TO FILL IN DROP OFFS TO
MEET ADA COMPLIANCE (TYP.)
(BID ALTERNATE #3)
EXIST. MES
TO REMAIN
EXIST. MES
TO REMAIN
EXIST. INLET
TO REMAIN
AHEAD
W11-2 W16-09P
SIGNS BY OTHERS
W11-2 W16-07PL
SIGNS BY OTHERS
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
S CYPRESS AVE & LIME RD
INTERSECTION PLAN 17
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:29 PM
S CYPRESS WAY
EVERGREEN CEMETARY
C E M E
TAR
Y R
OAD
TAR
GE
T
M
AT
C H
LI
N E S
H E E T
LEGEND
DETECTABLE WARNING
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
S CYPRESS WAY &
EVERGREEN CEMETERY
INTERSECTION PLAN 18
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
250'
N CYPRESS WAY
M E
LO
D Y
LN
W
OL
E
AN
D E R W
AY
LEGEND
DETECTABLE WARNING
AHEAD
W11-2 W16-07PL
SIGNS BY OTHERS
W11-2 W16-07PL
SIGNS BY OTHERS
W11-2 W16-09PL
SIGNS BY OTHERS
M
ATC
H
LIN
E S
H E E T 25
SHARROW (TYP.)
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
REPLACE 45' OF MIAMI CURB
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
N CYPRESS WAY &
OLEANDER WAY
INTERSECTION PLAN 19
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
N CYPRESS WAY
CO
NC
OR
D D
RAH
EA
D
W11-2 W16-09PL
SIGNS BY OTHERS
M
ATC
H
LIN
E S
H E E T 26
M
AT
C H
LI
N E S
H E E T
SHARROW (TYP.)
M P H
W1-1 W13-1
SIGNS TO
BE RELOCATED
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
N CYPRESS WAY &
CONCORD DR
INTERSECTION PLAN 20
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
WATER
WATER
B
AC
K F
LO
W
B
AC
K F
LO
W
WATER
WATER
WATER
SD
WATER
EOI
ST
OP
250'
250' N C
YP
R E S S W
AY
N C
YP
R E S S W
AY
MISTY OAKS RUN
PLUMOSA AVE
HOFFMAN CT
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
RAISED CROSSWALK
CONCRETE REMOVAL
W16-07PL W11-02
SIGNS BY OTHERS
R1-1
SIGN BY OTHERS
AHEAD
W11-2 W16-09PL
SIGNS BY OTHERS
AHEAD
W11-2 W16-09PL
SIGNS BY OTHERS
0' S E E
OT
H E R S
H E E T)
W16-07PL W11-02
SIGNS BY OTHERS
AH
EA
D
W11-2 W16-09PL
SIGNS BY OTHERS
M
ATC
H
LIN
E S
H E E T 29
MATCHLINE SHEET 25
MATCHLINE SHEET 27
CONST. 6" CONC. S/W
SHARROW (TYP.)
REPLACE 27' OF MIAMI CURB
CONST. 5' CONC. S/W
SOLID 6" WHITE STRIPE
15 LF OF 24" WHITE STOP BAR
REPLACE 35' OF MIAMI CURB
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
15 LF OF 24" WHITE STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
REMOVE EXIST. CONC.
PROP. 2321 SF SOD
EXIST. LIGHT POLE
TO REMAIN
SPECIAL EMPHASIS CROSSWALK MARKINGS
(12' WIDTH) PER STANDARD PLAN 711-001
REMOVE EXIST. CONC.
PROP. 77 SF SOD
VERTICAL DEFLECTION
MARKING (TYP.)
PROP. RC CHANNEL
GUTTER
VERTICAL DEFLECTION
ADVANCE WARNING MARKING
(TYP.)
M P
H
W1-1 W13-1
SIGNS TO REMAIN
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
N CYPRESS WAY &
PLUMOSA AVE
INTERSECTION PLAN 21
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
OP
HANCOCK CT
N C
YP
R E S S W
AY
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
MATCHLINE SHEET 26
MATCHLINE SHEET 28
R1-1
SIGN BY OTHERS
REPLACE 22' OF MIAMI CURB
REPLACE 28' OF MIAMI CURB
13 LF OF 24" WHITE STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
N CYPRESS WAY &
HANCOCK CT
INTERSECTION PLAN 22
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
LAKE GRIF
FIN CIR
N C
YP
R E S S W
AY
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
R1-1
SIGN BY OTHERS
MATCHLINE SHEET 27
261 LF OF SOLID 6" DOUBLE YELLOW
W/ Y/Y RPMS @ 5' O.C.
49 LF OF SOLID 6" DOUBLE YELLOW
CONST. 6' CONC. S/W
REPLACE 68' OF MIAMI CURB
15 LF OF 24" WHITE STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
EXIST. FIRE HYDRANT
AND LIGHT POLE
TO REMAIN
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
LAKE GRIFFEN CIR & N
CYPRESS WAY
INTERSECTION PLAN 23
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
250'
PLUMOSA AVE
LAK
E E
LLE
N D
R
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
CONCRETE REMOVALW16-07PL W11-02
SIGNS BY OTHERS
W16-07PL W11-02
SIGNS BY OTHERS
M
ATC
H
LIN
E S
H E E T 30
M
AT
C H
LI
N E S
H E E T
NOTE:
THE DISTANCE FROM THIS PED. SIGN IS
TO THE PED, AHEAD SIGN ON SHEET 26. AHEAD
W11-2 W16-09PL
SIGNS BY OTHERS
R1-1
SIGN TO REMAIN
SHARROW (TYP.)
CONST. 4" CONC. S/W
SOLID 6" WHITE STRIPEREMOVE STAIRS
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
16 LF OF 24" WHITE STOP BAR
EXIST. LIGHT ON EXIST.
UTILITY POLE TO REMAIN EXIST. SIDEWALK
TO REMAIN
REMOVE EXIST. CONC.
PROP. 2321 SF SOD
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
LAKE ELLEN & PLUMOSA AVE
INTERSECTION PLAN 24
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
S U
S H
W Y
PLUMOSA AVE
LEGEND
DETECTABLE WARNING
6" CONCRETE SIDEWALK
RAISED CROSSWALK
W16-07PL W11-02
SIGNS BY OTHERS
W16-07PL W11-02
SIGNS BY OTHERS
AH
EA
D
W11-2 W16-09PL
SIGNS BY OTHERS
M
AT
C H
LI
N E S
H E E T
SOLID 6" WHITE STRIPE
CONST. 7' CONC. S/W
SPEED HUMP MARKING (TYP.)
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
VERTICAL DEFLECTION
ADVANCE WARNING MARKING
(TYP.)
SOLID 6" DOUBLE YELLOW
WITH Y/Y RPMS @ 5' C.C.
12 LF OF 24"
WHITE STOP BAR
PROP. RC CHANNEL
GUTTER
SHARROW (TYP.)
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
PLUMOSA AVE & S US
HWY 17-92
INTERSECTION PLAN 25
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD03 - CR.dwg5/15/2024 12:30 PM
LAKE ANN LN
GA
LL
IA
N O
C
IR
±11'
±11'
±12'
LEGEND
DETECTABLE WARNING
M
ATC
H
LIN
E S
H E E T 32
R1-1
SIGN TO REMAIN
ST
OP
SPECIAL EMPHASIS CROSSWALK MARKINGS
(7' WIDTH) PER STANDARD PLAN 711-001
20 LF OF 24" WHITE STOP BAR
6" DOUBLE YELLOW STRIPE
6" SOLID WHITE STRIPE
18" SOLID YELLOW
STRIPE (TYP.)
6" DOUBLE YELLOW
STRIPE
6" SOLID WHITE
STRIPE
6" SOLID WHITE STRIPE
6" SOLID WHITE
STRIPE
SPECIAL EMPHASIS CROSSWALK MARKINGS
(9' WIDTH) PER STANDARD PLAN 711-001
LEFT TURN
ARROW (TYP.)
BEGIN MILLING & RESURFACING
MILL 1.5" SP-12.5
RESURFACE 1.5" SP-12.5
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
LAKE ANN LANE &
GALLIANO CIR
INTERSECTION PLAN 26
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD04- CR.dwg5/15/2024 12:31 PM
LAKE ANN LN
M
AT
C H
LI
N E S
H E E T
END MILLING & RESURFACING
MILL 1.5" SP-12.5
RESURFACE 1.5" SP-12.5
18" SOLID YELLOW
STRIPE (TYP.)
6" DOUBLE YELLOW
STRIPE
6" SOLID WHITE
STRIPE 6" SKIP 10'-30' YELLOW
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N
10 40
Feet
LAKE ANN LANE &
GALLIANO CIR
INTERSECTION 27
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD04- CR.dwg5/15/2024 12:31 PM
OE
OE
OE
OE
OE
OE
OE
OE
OE
B T B
B T B
BT
(B
BT(B)
BT(B)
BT
(B
BT
(B
BT
(B
BT
(B
OFOT
OFOT
O F O T
O F O T
O F O T
O F O T
OE
WATER
EOI
SAN
SD
SD
SAN
SD
SAN
WATER
WATER
WATER
U
CO
NC
W
ALK
CO
N C
W
AL
K
CO
NC
W
AL
K
CR
OS
SW
AL
K
ST
OP
B
AR
AS
PH
AL
T
DR
IV
E
AS
PH
AL
T
DR
IV
E
AS
PH
AL
T
DR
IV
E
AS
PH
AL
T
PA
VE
ME
NT
AS
P H
AL
T P
AV
E M E N T
GA
TE
GA
TE
AS
PH
AL
T
D
RI
VE
LA
N D S
CA
P E
AR
E A
GA
TE
LA
ND
SC
AP
E
AR
EA
LA
KE
SH
OR
E
DR
IV
E
(PO
ST
ED
DU
CK
P
ON
D
CI
RC
LE
(P
LA
T)
(50 ' R
/W P
ER
P B
, P G
LA
K E S H
OR
E D
R
IV
E P
OS
TE
D
D U
CK
P
ON
D C
IR
CL
E P
LA
T)
(5 0' R
/W P
E R P
B
1, P
G
8"
PV
C
" R
CP
8"
PV
C
8" P
V C
8" P
V C
8"
PV
C
" R
CP
" R
CP
" R
CP
, F
DO
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
STOP
LA
K E S H
OR
E D
R
R1-1
SIGN BY OTHERS
1407 LAKE SHORE DR
1461 LAKE SHORE DR
LA
KE
SH
OR
E
DR
L
OO
P
MATCHLINE SHEET 34
N 1577987 E 557208N 1577937
E 557143
N 1577922 E 557131
N 1577832 E 557105
MATCH EXIST. S/W
CONST. 146' OF MIAMI CURB
CONST. 5' CONC. S/W
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
16 LF OF 24"
WHITE STOP BAR
REMOVE EXIST. CURB
BEGIN MIAMI CURB
BEGIN SAWCUT
REMOVE EXIST. PAVEMENT
END MIAMI CURB
END SAWCUT
REMOVE EXIST. PAVEMENT
MATCH EXIST. S/W
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
REGRADING (2,263 SF OF SOD)
CONCRETE REMOVAL (32 SF)
PROP. 97 LF OF
VALLEY GUTTER
N 1577866 E 557046
N 1577838 E 557084
R25'
R50'
R50'
NO PAR
KIN
G
AN
Y TIM
E
R7-1L SIGN
BY OTHERS
NO
PA
RK
ING
AN
Y
TI
M
E
NO
PARKING
ANY
TIM
E
NOPARKING
ANYTIME
NO
PA
RK
ING
AN
Y
TI
M
E NO
PARKING
ANY
TIM
E
R7-1R SIGN
BY OTHERS
R7-1 SIGN
BY OTHERS
R7-1L SIGN
BY OTHERS
R7-1 SIGN
BY OTHERS
R7-1R SIGN
BY OTHERS
N 1577871 E 557106
CONST. TYPE F
CURB & GUTTER
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
LAKESHORE DR &
LAKESHORE DR LOOP
INTERSECTION PLAN 28
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD04- CR.dwg5/15/2024 12:31 PM
BE
(B
BT
(B
BT
(B
BT
(B
BT
(B
BT
(B
BT
(B
BT(B)
BT(B)
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
O E
O E
O E
OE
OE
BT(B)
BT(B)
BT(B)
BT(
B)
BT
(B
BT
(B
WATERWATER
WATER
WATER
WATERWATER
SAN
SAN
SAN
U
CONC
DRIVE
CONC
DRIV
E
CONC
DRIV
E
CONC
WALK
AS
PH
AL
T
DR
IVE
CO
NC
DR
IV
E
AS
PH
AL
T
DR
IV
E
CO
NC
WA
LK
ST
OP
B
AR
CR
OS
S
WA
LK
LAND
SCAP
E AR
EA
LANDSCAPE AREA
AS
PH
AL
T
PA
VE
ME
NT
ASPHALT PAVEMENT
LA
KE
SH
OR
E
DR
IV
E
(PO
ST
ED
DU
CK
P
ON
D
CI
RC
LE
(P
LA
T)
(50 ' R
/W P
ER
P B
, P G
)LAKESHORE DRIVE (POSTED)
DUCK POND CIRCLE (PLAT)
(50' R/W PER PB 11, PG 27)
8" PVC, FDO
8" PVC
8" PVC
8"
PV
C
8"
PV
C
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
LAKESHORE DR
LA
KE
SH
OR
E
DR
LO
OP
LAKE DR
QU
IN
TU
PL
ET
D R
1433 LAKE SHORE DR
1435 LAKE SHORE DR
12'
10'
MATCHLINE SHEET 33
R50'
N 1577367 E 557411
N 1577427 E 557568
STOP
R1-1
SIGN TO REMAIN
MATCH EXIST. S/W
CONST. 77' OF MIAMI CURB
CONST. 5' CONC. S/W
14 LF OF 24" WHITE STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
REMOVE EXIST. CURB
PROP. 103 LF OF
VALLEY GUTTER
BEGIN MIAMI CURB
BEGIN SAWCUT
REMOVE EXIST. PAVEMENT
END MIAMI CURB
END SAWCUT
REMOVE EXIST. PAVEMENT
MATCH EXIST. S/W
EXIST. MAILBOX
TO BE RELOCATED
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
REGRADING (1,460 SF OF SOD)
CONCRETE REMOVAL (185 SF)
N 1577320 E 557425
N 1577389 E 557413
R50' R25'
R8-3 SIGN
BY OTHERS
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
LAKESHORE DR &
LAKESHORE DR LOOP
INTERSECTION PLAN 29
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD04- CR.dwg5/15/2024 12:31 PM
LAU
RA
ST
H
OL
LY
H
IL
L
D R
M
AH
OGANY D
R
S U N D
OW
N T
R
AI
L
R1-5b SIGN
BY OTHERS
AHEAD
W11-2 W16-09PL
SIGNS BY OTHERS
0'
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
6" CONCRETE SIDEWALK
MATCHLINE SHEET 40
HERE STOPFOR
R1-5b SIGN
BY OTHERS
HE
REST
OP FO
R
STOP
STATE
LAW
W
ITHIN
CROSSW
ALK
FOR
R1-6a SIGN
BY OTHERS
ST
OP
ST
AT
E
LA
W
W
ITH
IN
CR
OS
SW
AL
K
FO
R
R1-6a SIGN
BY OTHERS
STOP
R1-1
SIGN TO REMAIN
NOTE:
CONTRACTOR TO COORDINATE WITH
SEMINOLE COUNTY REGARDING
THE INSTALLATION OF SIGNS
WITHIN THEIR RIGHT-OF-WAY.
AHEAD
W11-2 W16-09PL
SIGNS BY OTHERS
(SEE NOTE THIS SHEET)
MATCH EXIST. S/W
EXIST. LIGHT POLE
(TO REMAIN)
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
CONST. 6' SIDEWLAK
12 LF OF 24" WHITE STOP BAR
11 LF OF 24" WHITE STOP BAR
EXIST. STOP
BAR TO REMAIN
SPECIAL EMPHASIS CROSSWALK MARKINGS
(6' WIDTH) PER STANDARD PLAN 711-001
CONST. 6' SIDEWLAK
CITY OF CASSELBERRY
FLORIDA
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHEET
NO.
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006
Brian A. MacEwen, P.E.
PE # 81432
N 10 40
Feet
LAURA ST & MAHOGANY DR
INTERSECTION PLAN 30
Brian MacEwen \\vhb.com\gbl\proj\Orlando\63163.10 Road Rehab\cad\te\eng\63163.10 Road Rehab\Roadway\PLANRD04- CR.dwg5/15/2024 12:31 PM
BE
(B
BE(B)
BE(B)
BE(B)
BE(B)
WATER
SAN
SAN
SAN
SD
SD
EOI
WATER
SD
STOP
BAR
S
TOP
B
AR
CONC
DRIVE
GRAVEL
DRIVE
CONC
DRIVE
CO
NC
DR
IV
E
C
ON
C D R
IV
E
8" P
V C
10" PVC
10" PVC
10" PVC
P V C F D O
12" PVC, FDO
6" P
V C F D O
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
STOP
BRIDLE PATH
BRIDLE PATH
W
YN
D H
AM
W
AY
S U N D
OW
N T
R
AI
L
S U R R E Y
R U N
R1-1, W4-4P
SIGNS BY
OTHERS
LEGEND
DETECTABLE WARNING
4" CONCRETE SIDEWALK
N 1579418 E 553649
N 1579444 E 553539
N 1579465 E 553587
N 1579369 E 553533
R1-1
SIGN TO REMAIN
STOP
R1-1
SIGN TO REMAIN
STOP
CONST. 217' OF MIAMI CURB
CONST. 6' CONC. S/W
18 LF OF 24" WHITE STOP BAR
13 LF OF 24" WHITE STOP BAR
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
15 LF OF 24" WHITE STOP BAR
R30'
SPECIAL EMPHASIS CROSSWALK MARKINGS
(10' WIDTH) PER STANDARD PLAN 711-001
BEGIN MIAMI CURB
BEGIN SAWCUT AND
REMOVE EXIST. PAVEMENT
REMOVE EXIST. CONC.
PROP. 42 SF SOD
REMOVE EXIST. CONC.
PROP. 39 SF SOD
REMOVE EXIST. CONC.
PROP. 42 SF SOD
REMOVE EXIST. CONC.
PROP. 40 SF SOD
REMOVE EXIST. CONC.
PROP. 370 SF SOD
STOP
R1-1
SIGN TO BE
REMOVED
PROP. LEFT/RIGHT ARROW
34 LF OF 6"
DOUBLE YELLOW
NOTE:
ALL QUANTITIES FOR THE
RECONSTRUCTION OF WYNDHAM
WAY ARE INCLUDED IN THE
INVENTORY OF SURREY RUN.
NOPARKINGANYTIME
NOPARKINGANYTIME
NOPARKINGANYTIME
CROSS TRAFFIC
DOES NOT STOP
REMOVE EXIST. CONC.
PROP. 39 SF SOD
35 LF OF 6"
DOUBLE YELLOW
110 LF OF 6"
DOUBLE YELLOW
R1-5b SIGN
BY OTHERS
AHEAD
W11-2 W16-09PL
SIGNS BY OTHERS HERE
STOP
FOR
AH
EA
D
W11-2 W16-09PL
SIGNS BY OTHERS
HER
E
STO
P
FO
R
R1-5b SIGN
BY OTHERS
R7-1L SIGN
BY OTHERS
R7-1 SIGN
BY OTHERS
R7-1R SIGN
BY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .