EXHIBIT 2C - SQP (REGION 3).pdf
PDF 186 KB Posted
- Attached to
- Glass Panels Protection Solutions
- Solicitation number
- OP142929
- Issued by
- California
About this file
This is a Schedule of Quantities and Prices (SQP) bidder exhibit form for IFB No. OP142929, a glass panels protection solutions contract for Region 3 of a transit authority. The contract encompasses anti-graffiti film installation and related glass protection services at existing bus and rail locations. The three-year base period includes monthly replacement services for three product types: Glass Anti-Graffiti Film (6 Mil thickness) covering 3,300 square feet monthly, Polycarbonate Anti-Graffiti Film (4 Mil thickness, four layers) covering 1,710 square feet monthly, and Plexi Glass Anti-Graffiti Film (6 Mil thickness) covering 6,100 square feet monthly. The contract includes as-needed labor and materials for polycarbonate sheet installation in map cases and elevators, elevator installation labor and framing, and window tinting for security and energy efficiency purposes with an estimated cost of $20,000. The contract structure provides for a three-year base period with a two-year optional extension, creating a potential five-year contract term.
Pricing is structured on fully burdened unit rates per square foot or per linear foot, which include all materials, labor, equipment, taxes, insurance, travel time, overhead, and profit. All unit rates quoted must remain firm for the entire contract term. Bidders must complete pricing columns for the three-year base period, the two-year option period, and provide a total five-year contract value summary. The document specifies that anti-graffiti film installed with no replacement for six months will require replacement upon Metro Project Manager approval to prevent surface damage. The quantities provided are for bid assessment purposes only and do not represent guaranteed minimum or maximum commitments; future work locations are not chargeable against the contract until a formal contract modification is issued.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder
EXHIBIT 2C
SCHEDULE OF QUANTITIES AND PRICES FORM (Region 3)
GLASS PANELS PROTECTION SOLUTIONS
IFB No. OP142929
THREE YEAR BASE
EXISTING LOCATIONS
Item No.
Description
(A) Monthly
Estimated Sq. Ft.
(B)
Unit Rate Per Sq. Ft.
(C)
Monthly Replacement Cost
(A x B)
(D)
Total Annual Cost (C x 12)
1 Glass Anti-Graffiti Film 6 Mil thickness 3,300 $ $ $
Polycarbonate Anti-Graffiti Film 4 Mil thickness Four (4) Layers
1,710 $ $ $
3 Plexi Glass Anti-Graffiti Film 6 Mil thickness 6,100 $ $ $
(E) Annual Total $
(F) Three Year Base Existing Bus & Rail Locations Total (E x 3) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as a result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
All anti-graffiti film installed with no replacement for six (6) months will need to be replaced to prevent damage to all surfaces and only upon approval by the Metro PM.
GLASS PANELS PROTECTION SOLUTIONS
AS-NEEDED LABOR & MATERIALS
(G)
Unit Measure
(H) (I)
Item No.
Description
Estimated Quantity Fully
Burdened Rate Per Unit
Total Cost (G x H)
Per Sq. Ft.
Polycarbonate Sheet for Map Cases (Labor & Material Cost)
1,500 Sq Ft. $ $
Polycarbonate Sheet for Elevators (Material Cost Only)
7,000 Sq. Ft. $ $
Polycarbonate Sheet Installation for Elevators (Labor & Framing Material Cost Including Other Supply Cost)
7,000 LF $ $
Window Tinting for Security And Energy Efficiency Purposes (Labor & Material Cost)
X X X $ 20,000.00
(J) As Needed Total $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
GLASS PANELS PROTECTION SOLUTIONS
THREE YEAR BASE SUMMARY
DESCRIPTION TOTAL PRICE
(F) Three Year Base Existing Bus & Rail Locations Total $
(J) As Needed Total $
(K) Three Year Base Total (F + J) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
GLASS PANELS PROTECTION SOLUTIONS
ONE, TWO YEAR OPTION
EXISTING LOCATIONS
(L) (M) (N) (O)
Item No.
Description
Monthly Unit Rate Monthly Replacement Cost (L x M)
Total Annual Cost (N x 12)
Estimated Per Sq. Ft.
Sq. Ft.
1 Glass Anti-Graffiti Film 6 Mil 3,300 $ $ $
Polycarbonate Anti-Graffiti Film 4 Mil thickness Four (4) Layers
1,710 $ $ $
3 Plexi Glass Anti-Graffiti Film 6 Mil thickness 6,100 $ $ $
(P) Annual Total $
(Q) One, Two Year Option Existing Bus & Rail Locations Total (P x 2) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as a result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
All anti-graffiti film installed with no replacement for six (6) months will need to be replaced to prevent damage to all surfaces and only upon approval by the Metro PM.
GLASS PANELS PROTECTION SOLUTIONS
CONTRACT SUMMARY
DESCRIPTION TOTAL PRICE
(K) Three Year Base Existing Bus & Rail Locations Total $
(Q) One, Two Year Option Existing Bus & Rail Locations Total $
(R) Five Year Total Contract Value (K + Q) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices.
All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.