EXHIBIT 2B - SQP (REGION 2).pdf
PDF 204 KB Posted
- Attached to
- Glass Panels Protection Solutions
- Solicitation number
- OP142929
- Issued by
- California
About this file
This is a Schedule of Quantities and Prices form (Exhibit 2B) for Region 2 under Invitation for Bids No. OP142929 for glass panels protection solutions. The contract covers anti-graffiti film installation and related protective services at existing bus and rail locations. The base work includes two primary items: 6 mil thickness glass anti-graffiti film (5,400 square feet monthly) and 4 mil thickness polycarbonate anti-graffiti film in four layers (1,100 square feet monthly). Additional as-needed services include polycarbonate sheets for map cases (1,500 square feet), polycarbonate sheets for elevators (7,500 square feet), polycarbonate sheet installation for elevators (7,000 linear feet), and window tinting for security and energy efficiency purposes (estimated at $20,000 total). The contract structure consists of a three-year base period for existing locations, followed by a two-year optional extension, creating a five-year total contract value period.
All pricing is fully burdened, including materials, labor, equipment, taxes, insurance, travel time, overhead, and profit. Unit rates quoted by bidders will remain firm for the entire contract term. The estimated quantities provided are for bid assessment purposes only and do not constitute guaranteed minimums or maximums. Anti-graffiti film installations with no replacements for six months require replacement upon approval by the Metro Project Manager. Future work locations are not chargeable against the contract until a formal modification is issued. Bidders must complete separate pricing schedules for the three-year base period and the optional two-year extension, with the final five-year total contract value calculated by combining both periods.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder
EXHIBIT 2B
SCHEDULE OF QUANTITIES AND PRICES FORM (Region 2)
GLASS PANELS PROTECTION SOLUTIONS
IFB No. OP142929
THREE YEAR BASE
EXISTING LOCATIONS
Item No.
Description
(A) Monthly
Estimated Sq. Ft.
(B)
Unit Rate Per Sq. Ft.
(C)
Monthly Replacement Cost
(A x B)
(D)
Total Annual Cost
(C x 12)
1 Glass Anti-Graffiti Film 6 Mil thickness 5,400 $ $ $
Polycarbonate Anti-Graffiti Film 4 Mil thickness Four (4) Layers
1,100 $ $ $
(E) Annual Total
(F) Three Year Base Existing Bus & Rail Locations Total (E x 3) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
All anti-graffiti film installed with no replacement for six (6) months will need to be replaced to prevent damage to all surfaces and only upon approval by the Metro PM.
SCHEDULE OF QUANTITIES AND PRICES FORM (Region 2)
GLASS PANELS PROTECTION SOLUTIONS
AS-NEEDED LABOR & MATERIALS
(G)
Unit Measure
(H) (I)
Item No.
Description
Estimated Quantity Fully
Burdened Rate Per Unit
Total Cost (G x H)
Per Sq. Ft.
Polycarbonate Sheet for Map Cases (Labor & Material Cost)
1,500 Sq Ft. $ $
Polycarbonate Sheet for Elevators (Material Cost Only)
7,500 Sq. Ft. $ $
Polycarbonate Sheet Installation for Elevators (Labor & Framing Material Cost Including Other Supply Cost)
7,000 LF $ $
Window Tinting for Security And Energy Efficiency Purposes (Labor & Material Cost)
X X X $ 20,000.00
(J) As Needed Total $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
SCHEDULE OF QUANTITIES AND PRICES FORM (Region 2)
GLASS PANELS PROTECTION SOLUTIONS
THREE YEAR BASE SUMMARY
DESCRIPTION TOTAL PRICE
(F) Three Year Base Existing Bus & Rail Locations Total $
(J) As Needed Total $
(K) Three Year Base Total (F + J) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
SCHEDULE OF QUANTITIES AND PRICES FORM (Region 2)
GLASS PANELS PROTECTION SOLUTIONS
ONE, TWO YEAR OPTION
EXISTING LOCATIONS
(L) (M) (N) (O)
Item No.
Description
Monthly Unit Rate Monthly Replacement Cost (L x M)
Total Annual Cost (N x 12)
Estimated Per Sq. Ft.
Sq. Ft.
Glass Anti-Graffiti Film 6 Mil thickness
5,400 $ $ $
Polycarbonate Anti-Graffiti Film 4 Mil thickness Four (4) Layers
1,100 $ $ $
(P) Annual Total $
(Q) One, Two Year Option Existing Bus & Rail Locations Total (P x 2) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.
All anti-graffiti film installed with no replacement for six (6) months will need to be replaced to prevent damage to all surfaces and only upon approval by the Metro PM.
SCHEDULE OF QUANTITIES AND PRICES FORM (Region 2)
GLASS PANELS PROTECTION SOLUTIONS
CONTRACT SUMMARY
DESCRIPTION TOTAL PRICE
(K) Three Year Base Existing Bus & Rail Locations Total $
(Q) One, Two Year Option Existing Bus & Rail Locations Total $
(R) Five Year Total Contract Value (K + Q) $
Quantities listed herein are not to be construed as a commitment and are to be used for bid assessment purpose only. No minimum or maximum is guaranteed or implied. Future work locations are not chargeable against this contract until a contract modification is issued in accordance with the Schedule of Quantities and Prices. All unit rates as quoted will remain firm for the term of any contract that may be awarded as result of this invitation for Bids. Prices are based on fully burdened Rates which shall include all materials, labor equipment, taxes, insurance, travel time, and company’s overhead along with any applicable fees and profit.