Summary

This document comprises the Non-Disaster Rate Schedules (Exhibits 2A-2D) for a Statewide Emergency Remediation Services contract in Louisiana. The schedules establish the pricing framework for labor, equipment, materials, and additional fees that contractors must submit as part of their bid response. Exhibit 2A requires contractors to provide hourly rates for nine mandatory labor positions, including administrative/clerical staff, project managers, mold remediation technicians, dehumidification technicians, general laborers, health and safety officers, and remediation supervisors, with contractors permitted to add additional positions not subject to award evaluation. Exhibit 2B specifies daily, weekly, and monthly rates for 57 pieces of mandatory equipment ranging from air scrubbers and dehumidifiers to generators, extractors, and vehicles, with contractors allowed to submit discounted weekly or monthly rates if lower than pre-determined maximums. Exhibit 2C requires unit pricing for 53 mandatory materials including cleaning solutions, protective clothing, filters, ductwork, plastic sheeting, and tape products, with additional materials permitted at contractor discretion.

Exhibit 2D establishes the Additional Fees and Xactimate Discount Schedule, allowing contractors to specify markup percentages for billable expenses such as equipment rentals and purchased supplies, as well as subcontractor markups for services including temporary repairs performed by non-staff contractors. Completion of all four rate schedules is mandatory; failure to complete any schedule results in bid disqualification. The contractor must identify the applicable regions for each schedule. All rate schedules are inclusive of labor, equipment, and materials costs, with no additional fees, expenses, or costs permitted unless explicitly specified in the ITB, except as allowed under the Additional Fees and Xactimate Discount Schedule provisions.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exh 2A Labor Sch NonDisaster

Labor Rate Schedule - Non-Disaster Events
Mandatory items are listed on the rate sheet in bold Red Font. The Contractor shall enter the rate for these items and other labor positions the Contractor anticipates may be required to complete service request/projects under the awarded contract. Labor positions added by the Contractor will not be factored into the award evaluation.
Failure to complete this schedule will result in disqualification of bid.

The Contractor is to enter the applicable Regions for this schedule in the field indicated below.

Non-Disaster Labor Rate Schedule is for regions(s):
Item#PositionPosition Description

Describe the position and when the position is used in relation to a project. Include years of experience required or certifications needed to hold the position, if applicable

(Years of experience must meet or exceed the ITB's requirements, when applicable)UoMRate
1Admin/Clericalhr
2Assistant Project Manager (APM)hr
3Certified Mold Remediation Tech (CRT)hr
4Dehumidification Technicianhr
5General Labor / Entry Technicianhr
6Health & Safety Officer (HSO)hr
7Project Managerhr
8Remediation Technician (skilled labor experienced in remediation work processes and equipment)hr
9Supervisor/ Remediation Supervisorhr
Additional labor positions to be listed below:
10
11
12

Page &P of &N

Exhibit 2A

Exh 2B Equip Sch NonDisaster

Equipment Rate Schedule - Non-Disaster
Mandatory items are listed on the rate sheet in bold Red Font. The Contractor must enter rates for all of these items and may enter other equipment the Contractor anticipates may be required to complete service requests/projects under the awarded contract. Additional equipment added by the Contractor will not be factored into the award evaluation.
Failure to complete this schedule will result in disqualification of bid.
The Contractor is to enter the applicable Regions for this schedule in the field indicated below.
Non-Disaster Equipment Schedule is for Region(s):To Be Completed by OSP/ORMCompleted by Contractor, if offering a weekly/monthly rate less than the pre-determined weekly /monthly rate. A discounted rate may be provided on some or all items
Item#DescriptionUnitDaily RateWeekly Rate
(Daily x 4)Monthly Rate
(Weekly x3)Discounted Weekly RateDiscounted Monthly Rate
The Contractor, shall not complete the Weekly/Monthly Rate columns; these fields are pre-determined based on the ITB Attachment B Specifications. However, should the Contractor choose to provide a rate that is less than the pre-determined Weekly/Monthly Rate, the Contractor may complete the Discounted Weekly and/or Discounted Monthly Rate Columns (Columns G and H). A discounted rate may be provided to some or all equipment items. No weekly/monthly rate shall exceed the a pre-determined Weekly or Monthly Allowable Rate; any entries that exceed these rates will be deemed limited by and to the maximum allowance.
1Air Compressor, Portable, Electricea$ - 0$ - 0
2Air Scrubber, up to 1000 CFMea$ - 0$ - 0
3Air Scrubber, 1001-1400 CFMea$ - 0$ - 0
4Air Scrubber, 1401-2200 CFMea$ - 0$ - 0
5Air Scrubber, 2201 - 5000 CFMea$ - 0$ - 0
6Airless Sprayerea$ - 0$ - 0
7Carpet Machine (Cold)ea$ - 0$ - 0
8Converter Box, 220Vea$ - 0$ - 0
9Dehumidifier, portable, 110-159 ppdea$ - 0$ - 0
10Dehumidifier, portable, 70-109 ppdea$ - 0$ - 0
11Dehumidifier, portable, up to 69 ppdea$ - 0$ - 0
12Desiccant Dehumidifier 88-170 CFMea$ - 0$ - 0
13Desiccant Dehumidifier 171- CFMea$ - 0$ - 0
14Distribution Cable - 220V 50' segmentsea$ - 0$ - 0
15Distribution Panel - 100 Ampea$ - 0$ - 0
16Distribution Panel - 200 Ampea$ - 0$ - 0
17Distribution Panel - 50 Ampea$ - 0$ - 0
18Duct, Flex 12" (25')ea$ - 0$ - 0
19Duct, Flex 20" (25')ea$ - 0$ - 0
20DX Unit - 5 tonea$ - 0$ - 0
21Electrical, 3 gang Boxea$ - 0$ - 0
22Electrical, Cable, CamLock 100'ea$ - 0$ - 0
23Electrical, Cable, CamLock 50'ea$ - 0$ - 0
24Electrical, Cable, Quad Stringer, 50'ea$ - 0$ - 0
25Electrical, Quad Box, 10'ea$ - 0$ - 0
26Electrical, Quad Box, 20'ea$ - 0$ - 0
27Extraction Vacuum System, Truck Mountedea$ - 0$ - 0
28Extraction Vacuum, Shop Vac, Wet/Dryea$ - 0$ - 0
29Extractor, Flood Pumper, Portableea$ - 0$ - 0
30Extractor, Portable (hot)ea$ - 0$ - 0
31Fan, Axialea$ - 0$ - 0
32Fan, Centrifugalea$ - 0$ - 0
33Fan, Hurricaneea$ - 0$ - 0
34Generator, 10 kWea$ - 0$ - 0
35Generator, 20 kWea$ - 0$ - 0
36Generator, Hydroxl, Bossea$ - 0$ - 0
37Generator, Ozoneea$ - 0$ - 0
38Generator, up to 7500 wattsea$ - 0$ - 0
39High Pressure Drying System, Wall Cavity, Injectidry or similarea$ - 0$ - 0
40High Pressure Drying System, Floor, Injectidry or similarea$ - 0$ - 0
41Negative Air Machine, Up To 500 CFMea$ - 0$ - 0
42Negative Air Machine, 501-1400+ cfmea$ - 0$ - 0
43Personal Fall Protection (PFP) harness and Lanyardper person, per day
44Personal Protection Equipment (Hard Hat, Goggles, Vest, Gloves)one time per person
45Pressure Washer - 1000 psi, cold water, electricea$ - 0$ - 0
46Pump, sump, 3/4" submersibleea$ - 0$ - 0
47Pump, trash 2"-4"ea$ - 0$ - 0
48Respirator, Half Mask, Reusableea$ - 0$ - 0
49Spider Boxea$ - 0$ - 0
50Trailer - Enclosed ≤20' (less than or equal to)ea$ - 0$ - 0
51Trailer - Flatbed 21' - 35'ea$ - 0$ - 0
52Vacuum, HEPAea$ - 0$ - 0
53Vacuum, HEPA 55 galea$ - 0$ - 0
54Vacuum, HEPA backpackea$ - 0$ - 0
55Vehicle, Box Truckea$ - 0$ - 0
56Vehicle, Pick-up, SUVea$ - 0$ - 0
57Vehicle, Van, Cargo/Passengerea$ - 0$ - 0
Additional Items to be listed below:
60$ - 0$ - 0
61$ - 0$ - 0
62$ - 0$ - 0
63$ - 0$ - 0
64$ - 0$ - 0
65$ - 0$ - 0
66$ - 0$ - 0
67$ - 0$ - 0
68$ - 0$ - 0
69$ - 0$ - 0
70$ - 0$ - 0
71$ - 0$ - 0
72$ - 0$ - 0
73$ - 0$ - 0
74$ - 0$ - 0
75$ - 0$ - 0
76$ - 0$ - 0
77$ - 0$ - 0
78$ - 0$ - 0
79$ - 0$ - 0
80$ - 0$ - 0
81$ - 0$ - 0
82$ - 0$ - 0
83$ - 0$ - 0
84$ - 0$ - 0
85$ - 0$ - 0

Page &P of &N

Exhibit 2B Exhibit 1B

Exh 2C Material Sch NonDisaster

Material Rate Schedule - Non-Disaster
Mandatory items are listed on the rate sheet in bold Red Font. The Contractor must enter the rates for all of these items based on the Unit of Measurement (UoM) provided and enter other materials the Contractor anticipates may be required to complete service requests/projects under the awarded contract. For all entries, other than Mandatory item, use the standard/customary units of measurement, e.g. gallon, bottle, box, can, lf, each, etc. Any items added by the Contractor will not be factored into the award evaluation.
If not already specified, when the UoM is a box, package, pad, roll, or similar, the Contractor must specify the count, amount, number, size, length, etc. of the material in the "Specify Packaging Count/Size" column.

Example: Desc=Dust cloths, UoM=Box, count=500; Desc=Lay Flat Duct 20", UoM = Roll, Count/Size=500 lf Failure to complete this schedule will result in disqualification of bid.

The Contractor is to enter the applicable Regions for this schedule in the field indicated below.

Non-Disaster Material Schedule is for Region(s):
Item#DescriptionUoMSpecify Pkg Count/Size for rl, box, sheet, carton (if not already specified)Unit Rate
1Adhesive Removergal
2Adhesive Spraycan
3All Purpose Cleanergal
4Bags, 6 mil, black, 50-60 gal, 50 ctbx50 ct
5Bags, Contractor, 3 mil, 50-60 gal, 50 ctbx50 ct
6Carpet Cleaner Solutiongal
7Carpet Degreasergal
8Chemical Sponges, Dry Cleaning Spongeea
9Clothing, Booties / Shoe Coverspair
10Clothing, Dust Coverallsea
11Clothing, Tyvek Coverall with Hood and Bootea set
12Degreaser, "green" Botancial, [ Supported by Safety Data Sheet providing transparency of ingredients]gal
13Disinfectant, Antimicrobial, "green" Botanical, Benefect or equivalent, [Free of phosphates & harsh solvents, Supported by Safety Data Sheet providing transparency of ingredients]gal
14Disinfectant, Antimicrobial, Microban or equivalentgal
15Encaspulant, Antifungicidal - Fosters 40-20 Fungicidal Protective Coating or equivalent (pigmented)gal
16Filter for Portable Dehumidifierea
17Filter, Air Scrubber - Carbon/Charcoalea
18Filter, Air Scrubber - HEPA, 99.97 or greater efficiencyea
19Filter, Air Scrubber - Pleated Secondary, MERV 8-13ea
20Filter, Air Scrubber - Pre-filter, MERV 8-13ea
21Filter, Air Scrubber - Primary media, MERV 8-13ea
22Filter, Vacuum - HEPA Dust Bagsea
23Filter, Vacuum - HEPA smallea
24Filter, Vacuum Bags, Backpackea
25Floor Protection, Carpet, Self Adhesive, 36", 200'rl200'
26Floor Protection, Ram Board, 38", 100'rl100'
27Glass Cleanergal
28Gloves, Latex Disposable, 100 ctbx100 ct
29Gloves, Leather palm workea
30Gloves, Nitrile Disposable, 100 ctbx100 ct
31Lay Flat Ducting, 4-6 mil, 20+" x 500 ' roll (20" and up)rl500' roll
32Lay Flat Ducting, 4-6 mil, under 20" x 500' rollrl500' roll
33Lay Flat Ducting, up to 3 mil, 20+" x 500 ' roll (20" and up)rl500' roll
34Lay Flat Ducting, up to 3 mil, under 20" x 500' rollrl500' roll
35Mop Headsea
36Odor Neutralizer Blockea
37Packing Box, Fileea
38Packing Box, Largeea
39Packing Box, Mediumea
40Plastic Sheeting, 4 mil, 20', 100'rl100'
41Plastic Sheeting, 6 mil, 20', 100'rl100'
42Plastic Sheeting, 6 mil, 12', 100'rl100'
43Respirator/Dust Mask, N-95ea
44Respirator, Cartridgesea
45Tacky/Sticky mats, per pad of 30 sheetspad
46Tape, Caution, 3", 1000'rl1000'
47Tape, Duct, 3", 50-60 ydrl50-60 yd
48Tape, packingrl
49Tape, painters tape, 2", 50-60 ydrl50-60 yd
50Towels, Cleaning Rags/Tshirt Wipers/Wiping Clothslb
51Towel, Dust Cloth, Treated, Bag, 50 countbag50 ct
52Towel, Microfiberea towel
53Towels, Terry Towelslb
Additional Items to be listed below:
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Page &P of &N

Exhibit 2C

Exh 2D AF-XD Sch NonDisaster

Additional Fees & Xactimate Discount Schedule - Non-Disaster
The additional fees allowed for a markup percentage only relate to subcontractor fees and billable expenses that are allowable under this ITB.
Failure to complete this schedule will result in disqualification of bid.

The Contractor is to enter the applicable Regions for this schedule in the field indicated below.

Additional Fees & Xactimate Discount Schedule is for Region(s):
Item#DescriptionDiscount %Fee/Charge %
1Xactimate Discount
2Billable Expense Markup; e.g., equipment rental from rental company (i.e., dumpsters, scaffolding, large generators, port-a-potty), purchased supplies (fuel), approved travel cost
4SubContractor Markup
Reminder:
Rate Schedules for materials, equipment, and labor are inclusive. Unless specified in this ITB, no additional fees, expenses, and/or costs are allowed.

The Additional Fees & Xactimate Discount Schedule allows for a markup percentage related to subcontractor fees and billable expenses that are allowable under this ITB. For example, equipment rental from a rental company as outlined under the Equipment Requirements section. Also, the use of a roofing contractor (who is not a vendor employee or part of its staff) to perform approved temporary repairs is permitted as per the subcontractor section.

Exhibit 2D