Exhibit 1 (1A-1D) Disaster Rate Schedules.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Statewide Emergency Remediation Services Bid Cancelled: 03/11/2026 - Addendum No. 1 – CANCELLATION Date Issued: 03/11/2026 Your reference
Solicitation number
3000025678
Issued by
East Baton Rouge Parish, Baton Rouge City, Louisiana

About this file

This file contains four rate schedules (Exhibits 1A-1D) for a statewide emergency remediation services contract in Louisiana. Exhibit 1A is a Labor Rate Schedule requiring contractors to submit hourly rates for nine mandatory positions including Project Manager, Assistant Project Manager, Certified Mold Remediation Technician, Dehumidification Technician, General Labor/Entry Technician, Health & Safety Officer, Remediation Technician, Remediation Supervisor, and Admin/Clerical staff, with contractors permitted to add additional positions that will not factor into award evaluation. Exhibit 1B is an Equipment Rate Schedule requiring daily rates for 57 mandatory equipment items ranging from portable air compressors and air scrubbers to dehumidifiers, generators, extraction systems, negative air machines, and various vehicles and trailers; contractors may submit discounted weekly or monthly rates that cannot exceed pre-determined maximums. Exhibit 1C is a Material Rate Schedule requiring unit rates for 51 mandatory items including adhesives, cleaners, protective equipment, filters, ducting, plastic sheeting, and various remediation supplies measured in gallons, boxes, rolls, and individual units. Failure to complete any of these three schedules will result in bid disqualification.

Exhibit 1D establishes an Additional Fees and Xactimate Discount Schedule allowing contractors to propose discount percentages for Xactimate software and markup percentages for billable expenses and subcontractor fees. The rates and fees in all schedules are inclusive, and no additional costs beyond those specified are permitted unless explicitly authorized in the contract terms. Contractors must designate the applicable region(s) for each rate schedule. The contract emphasizes that labor, equipment, and material rate schedules are comprehensive and final, with the Additional Fees schedule specifically limited to allowable subcontractor markups and billable expenses such as equipment rentals from third-party vendors, purchased supplies, and approved travel costs.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exh 1A Labor Sch Disaster

Labor Rate Schedule - Disaster Events
Mandatory items are listed on the rate sheet in bold Red Font. The Contractor shall enter the rate for these items and other labor positions the Contractor anticipates may be required to complete service request/projects under the awarded contract. Labor positions added on by the Contractor will not be factored into the award evaluation.
Failure to complete this schedule will result in disqualification of bid.

The Contractor is to enter the applicable Regions for this schedule in the field indicated below.

Disaster Labor Schedule is for Region(s):
Item#PositionPosition Description

Describe the position and when the position is used in relation to a project. Include years of experience required or certifications needed to hold the position, if applicable

(Years of experience must meet or exceed the ITB's requirements, when applicable)UoMRate
1Admin/Clericalhr
2Assistant Project Manager (APM)hr
3Certified Mold Remediation Tech (CRT)hr
4Dehumidification Technicianhr
5General Labor / Entry Technicianhr
6Health & Safety Officer (HSO)hr
7Project Managerhr
8Remediation Technician (skilled labor experienced in remediation work processes and equipment)hr
9Supervisor/ Remediation Supervisorhr
Additional positions to be listed below:
10
11
12

Exhibit 1A

Exh 1B Equip Sch Disaster

Equipment Rate Schedule - Disaster
Mandatory items are listed on the rate sheet in bold Red Font. The Contractor must enter rates for all of these items and may enter other equipment the Contractor anticipates may be required to complete service requests/projects under the awarded contract. Additional equipment added by the Contractor will not be factored into the award evaluation.
Failure to complete this schedule will result in disqualification of bid.
The Contractor is to enter the applicable Regions for this schedule in the field indicated below.
Disaster Equipment Schedule is for Region(s):To Be Completed By OSP/ORMCompleted by Contractor, IF offering a weekly/monthly rate less than the pre-determined weekly /monthly rate. A discounted rate may be provided on some or all items
Item#DescriptionUnitDaily RateWeekly Rate
(Daily x 4)Monthly Rate
(Weekly x3)Discounted Weekly RateDiscounted Monthly Rate
The Contractor, shall not complete the Weekly/Monthly Rate columns; these fields are pre-determined based on the ITB Attachment B Specifications. However, should the Contractor choose to provide a rate that is less than the pre-determined Weekly/Monthly Rate, the Contractor may complete the Discounted Weekly and/or Discounted Monthly Rate Columns (Columns G and H). A discounted rate may be provided to some or all equipment items. No weekly/monthly rate shall exceed the a pre-determined Weekly or Monthly Allowable Rate; any entries that exceed these rates will be deemed limited by and to the maximum allowance.
1Air Compressor, Portable, Electricea$ - 0$ - 0
2Air Scrubber, up to 1000 CFMea$ - 0$ - 0
3Air Scrubber, 1001-1400 CFMea$ - 0$ - 0
4Air Scrubber, 1401-2200 CFMea$ - 0$ - 0
5Air Scrubber, 2201 - 5000 CFMea$ - 0$ - 0
6Airless Sprayerea$ - 0$ - 0
7Carpet Machine (Cold)ea$ - 0$ - 0
8Converter Box, 220Vea$ - 0$ - 0
9Dehumidifier, portable, 110-159 ppdea$ - 0$ - 0
10Dehumidifier, portable, 70-109 ppdea$ - 0$ - 0
11Dehumidifier, portable, up to 69 ppdea$ - 0$ - 0
12Desiccant Dehumidifier 88-170 CFMea$ - 0$ - 0
13Desiccant Dehumidifier 171- CFMea$ - 0$ - 0
14Distribution Cable - 220V 50' segmentsea$ - 0$ - 0
15Distribution Panel - 100 Ampea$ - 0$ - 0
16Distribution Panel - 200 Ampea$ - 0$ - 0
17Distribution Panel - 50 Ampea$ - 0$ - 0
18Duct, Flex 12" (25')ea$ - 0$ - 0
19Duct, Flex 20" (25')ea$ - 0$ - 0
20DX Unit - 5 tonea$ - 0$ - 0
21Electrical, 3 gang Boxea$ - 0$ - 0
22Electrical, Cable, CamLock 100'ea$ - 0$ - 0
23Electrical, Cable, CamLock 50'ea$ - 0$ - 0
24Electrical, Cable, Quad Stringer, 50'ea$ - 0$ - 0
25Electrical, Quad Box, 10'ea$ - 0$ - 0
26Electrical, Quad Box, 20'ea$ - 0$ - 0
27Extraction Vacuum System, Truck Mountedea$ - 0$ - 0
28Extraction Vacuum, Shop Vac, Wet/Dryea$ - 0$ - 0
29Extractor, Flood Pumper, Portableea$ - 0$ - 0
30Extractor, Portable (hot)ea$ - 0$ - 0
31Fan, Axialea$ - 0$ - 0
32Fan, Centrifugalea$ - 0$ - 0
33Fan, Hurricaneea$ - 0$ - 0
34Generator, 10 kWea$ - 0$ - 0
35Generator, 20 kWea$ - 0$ - 0
36Generator, Hydroxl, Bossea$ - 0$ - 0
37Generator, Ozoneea$ - 0$ - 0
38Generator, up to 7500 wattsea$ - 0$ - 0
39High Pressure Drying System, Wall Cavity, Injectidry or similarea$ - 0$ - 0
40High Pressure Drying System, Floor, Injectidry or similarea$ - 0$ - 0
41Negative Air Machine, Up To 500 CFMea$ - 0$ - 0
42Negative Air Machine, 501-1400+ cfmea$ - 0$ - 0
43Personal Fall Protection (PFP) harness and Lanyardper person, per/day
44Personal Protection Equipment (Hard Hat, Goggles, Vest, Gloves)one time per/ person
45Pressure Washer - 1000 psi, cold water, electricea$ - 0$ - 0
46Pump, sump, 3/4" submersibleea$ - 0$ - 0
47Pump, trash 2"-4"ea$ - 0$ - 0
48Respirator, Half Mask, Reusableea$ - 0$ - 0
49Spider Boxea$ - 0$ - 0
50Trailer - Enclosed ≤20' (less than or equal to)ea$ - 0$ - 0
51Trailer - Flatbed 21' - 35'ea$ - 0$ - 0
52Vacuum, HEPAea$ - 0$ - 0
53Vacuum, HEPA 55 galea$ - 0$ - 0
54Vacuum, HEPA backpackea$ - 0$ - 0
55Vehicle, Box Truckea$ - 0$ - 0
56Vehicle, Pick-up, SUVea$ - 0$ - 0
57Vehicle, Van, Cargo/Passengerea$ - 0$ - 0
Additional positions to be listed below:
58$ - 0$ - 0
59$ - 0$ - 0
60$ - 0$ - 0
61$ - 0$ - 0
62$ - 0$ - 0
63$ - 0$ - 0
64$ - 0$ - 0
65$ - 0$ - 0
66$ - 0$ - 0
67$ - 0$ - 0
68$ - 0$ - 0
69$ - 0$ - 0
70$ - 0$ - 0
71$ - 0$ - 0
72$ - 0$ - 0
73$ - 0$ - 0
74$ - 0$ - 0
75$ - 0$ - 0
76$ - 0$ - 0
77$ - 0$ - 0
78$ - 0$ - 0
79$ - 0$ - 0
80$ - 0$ - 0
81$ - 0$ - 0
82$ - 0$ - 0
83$ - 0$ - 0

Page &P of &N

Exhibit 1B

Exh 1C Material Sch Disaster

Material Rate Schedule - Disaster
Mandatory items are listed on the rate sheet in bold Red Font. The Contractor must enter the rates for all of these items based on the Unit of Measurement (UoM) provided and enter other materials the Contractor anticipates may be required to complete service requests/projects under the awarded contract. For all entries, other than Mandatory item, use the standard/customary units of measurement, e.g. gallon, bottle, box, can, lf, each, etc. Any items added by the Contractor will not be factored into the award evaluation.
If not already specified, when the UoM is a box, package, pad, roll, or similar, the Contractor must specify the count, amount, number, size, length, etc. of the material in the "Specify Packaging Count/Size" column.

Example: Desc=Dust cloths, UoM=Box, count=500; Desc=Lay Flat Duct 20", UoM = Roll, Count/Size=500

Failure to complete this schedule will result in disqualification of bid.

The Contractor is to enter the applicable Regions for this schedule in the field indicated below.

Disaster Materials Schedule is for region(s):
Item#DescriptionUoMSpecify Pkg Count /Size for rl, box, sheet, carton (if not already specified)Unit Rate
1Adhesive Removergal
2Adhesive Spraycan
3All Purpose Cleanergal
4Bags, 6 mil, black, 50-60 gal, 50 ctbx50 ct
5Bags, Contractor, 3 mil, 50-60 gal, 50 ctbx50 ct
6Carpet Cleaner Solutiongal
7Carpet Degreasergal
8Chemical Sponges, Dry Cleaning Spongesea
9Clothing, Booties / Shoe Coverspair
10Clothing, Dust Coverallsea
11Clothing, Tyvek Coverall with Hood and Bootea set
12Degreaser, "green" Botancial, [Supported by Safety Data Sheet providing transparency of ingredients]gal
13Disinfectant, Antimicrobial, "green" Botanical, Benefect or equivalent, [Free of phosphates & harsh solvents, Supported by Safety Data Sheet providing transparency of ingredients]gal
14Disinfectant, Antimicrobial, Microban or equivalentgal
15Encaspulant, Antifungicidal - Fosters 40-20 Fungicidal Protective Coating or equivalent (pigmented)gal
16Filter for Portable Dehumidifierea
17Filter, Air Scrubber - Carbon/Charcoalea
18Filter, Air Scrubber - HEPA, 99.97 or greater efficiencyea
19Filter, Air Scrubber - Pleated Secondary, MERV 8-13ea
20Filter, Air Scrubber - Pre-filter, MERV 8-13ea
21Filter, Air Scrubber - Primary media, MERV 8-13ea
22Filter, Vacuum - HEPA Dust Bagsea
23Filter, Vacuum - HEPA smallea
24Filter, Vacuum Bags, Backpackea
25Floor Protection, Carpet, Self Adhesive, 36", 200'rl200'
26Floor Protection, Ram Board, 38", 100'rl100'
27Glass Cleanergal
28Gloves, Latex Disposable, 100 ctbx100 ct
29Gloves, Leather palm workea
30Gloves, Nitrile Disposable, 100 ctbx100 ct
31Lay Flat Ducting, 4-6 mil, 20+" x 500 ' roll (20" and up)rl500' roll
32Lay Flat Ducting, 4-6 mil, under 20" x 500' rollrl500' roll
33Lay Flat Ducting, up to 3 mil, 20+" x 500 ' roll (20" and up)rl500' roll
34Lay Flat Ducting, up to 3 mil, under 20" x 500' rollrl500' roll
35Mop Headsea
36Odor Neutralizer Blockea
37Packing Box, Fileea
38Packing Box, Largeea
39Packing Box, Mediumea
40Plastic Sheeting, 4 mil, 20', 100'rl100'
41Plastic Sheeting, 6 mil, 20', 100'rl100'
42Plastic Sheeting, 6 mil, 12', 100'rl100'
43Respirator/Dust Mask, N-95ea
44Respirator, Cartridgesea
45Tacky/Sticky mats, per pad of 30 sheetspad
46Tape, Caution, 3", 1000'rl1000'
47Tape, Duct, 3", 50-60 ydrl50-60 yd
48Tape, packingrl
49Tape, painters tape, 2", 50-60 ydrl50-60 yd
50Towels, Cleaning Rags/Tshirt Wipers/Wiping Clothslb
51Towel, Dust Cloth, Treated, Bag, 50 countbag50 ct
52Towel, Microfiberea towel
53Towels, Terry Towelslb
Additional items to be listed below:
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

Page &P of &N

Exhibit 1C

Exh 1D AF-XD Sch Disaster

Additional Fees & Xactimate Discount Schedule - Disaster
The additional fees allowed for a markup percentage only relate to subcontractor fees and billable expenses that are allowable under this ITB.
Failure to complete this schedule will result in disqualification of bid.

The Contractor is to enter the applicable Regions for this schedule in the field indicated below.

Additional Fees & Xactimate Discount Schedule is for region(s):
Item#DescriptionDiscount %Fee/Charge %
1Xactimate Discount
2Billable Expense Markup; e.g., equipment rental from rental company (i.e., dumpsters, scaffolding, large generators, port-a-potty), purchased supplies (fuel), approved travel cost
4SubContractor Markup
Reminder:
Rate Schedules for materials, equipment, and labor are inclusive. Unless specified in this ITB, no additional fees, expenses, and/or costs are allowed.

The Additional Fees & Xactimate Discount Schedule allows for a markup percentage related to subcontractor fees and billable expenses that are allowable under this ITB. For example, equipment rental from a rental company as outlined under the Equipment Requirements section. Also, the use of a roofing contractor (who is not a vendor employee or part of its staff) to perform approved temporary repairs is permitted as per the subcontractor section.

Exhibit 1D

File details come from the government source that posted it. Updated .