Exhibit 12 Past Performance Questionnaire V1.pdf

PDF 54 KB Posted

Attached to
Software Engineering Services (SES III) Federal contract opportunity
Solicitation number
80GSFC20R0019
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This draft request for proposal concerns a software engineering services contract opportunity with the National Aeronautics and Space Administration Goddard Space Flight Center. The scope of work includes software systems engineering, flight and ground software development, science data systems, mission operations and verification, IT security, and software process improvement. The contract type will be cost-plus-fixed-fee indefinite delivery indefinite quantity with a five year ordering period. The solicitation number is 80GSFC20R0019 and proposals are due approximately 45 days after release of the final RFP on May 21, 2020. The North American Industry Classification System code is 541715 and the small business size standard is 1,000 employees. This will be an 8(a) set-aside. A Top Secret/SCI facility clearance is required by the proposal due date and for the life of the contract. Potential offerors are invited to review and comment on the draft RFP within 30 days of its release.

View the file

Other files for this federal contract opportunity

Other files attached to Software Engineering Services (SES III), newest first.
File Type Posted
SES III Final RFP Amendment 2.pdf PDF
SF30-SES III (003).pdf PDF
SES III Final RFP Amendment 01.pdf PDF
Enclosure DD - Contract Historical Data FINAL Rev 1.pdf PDF
EXHIBIT 12 Cover Page Past Performance Questionnaire.pdf PDF
Exhibits 1A-1C GPM Docs.pdf PDF
Attachment G-OCI Plan Cover Page.pdf PDF
Attachment M- IT Security Plan Cover Page.pdf PDF
Attachment A- Statement of Work SOW III 5-21-20 (updated).pdf PDF
Attachment C- Financial M. Reporting.pdf PDF
Enclosure AA - GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN SES III final document.pdf PDF
Attachment L GFP Doc 1.pdf PDF
Final SF33 SES III.pdf PDF
Attachment D-DD254.pdf PDF
Enclosure EE-IT Security Management Plan COMPARE TO ORIGINAL.pdf PDF
Exhibits 1A-1C Cover Page.pdf PDF
Enclosure BB- Scenarios.pdf PDF
Attachment F- Quality Assurance Plan Cover Page (002).pdf PDF
Exhibits 2-11 Documents.pdf PDF
Enclosure CC-GPM Final (002).pdf PDF
Attachment L- GFP Cover Page.pdf PDF
Attachment K IAGP Doc 1.pdf PDF
Attachment J - IT Security Applicable Docs List.pdf PDF
Exhibit 12 Past Performance Questionnaire V1.pdf PDF
SES III Final QAs 6.10.20.pdf PDF
SES III QAs dated 4-24-2020.pdf PDF
Attachment L- GFP Cover Page.pdf PDF
Attachment D - DD254 Cover Page.pdf PDF
Enclosure EE-IT Security Management Plan.pdf PDF
SES III DRFP GPM Exhibits 2A-11B.pdf PDF
Attachment K - IAGP Cover Page.pdf PDF
SES III DRFP Sect B thru M.pdf PDF
Attachment J - IT Security Applicable Docs List.pdf PDF
Attachment E Safety and Health Plan Cover Page (002).pdf PDF
Attachment B-IDIQ Cost-Type Rate Matrix.pdf PDF
Attachment D- DD254.pdf PDF
DRFP Cover Letter SES III Final.pdf PDF
Attachment H- Contract Historical Data.pdf PDF
Attachment G-OCI Plan Cover Page.pdf PDF
Enclosure BB- Scenario.pdf PDF
Attachment L GFP Doc 1.pdf PDF
Exhibits 1A-1C Cover Page.pdf PDF
Exhibits 2A-11B Cover Page.pdf PDF
Enclosure AA - GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN SES III final document.pdf PDF
Enclosure CC-GPM Final.pdf PDF
Attachment I PIV Attachment.pdf PDF
SES III-DRFP GPM Exhibits 1A-1C.pdf PDF
EXHIBIT 12 Cover Page Past Performance Questionnaire.pdf PDF
Attachment C- Financial M. Reporting.pdf PDF
Final SF33 SES III Rev 1.pdf PDF
Show all 50

Software Engineering Services (SES III) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80GSFC20R0019

EXHIBIT 12

PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS

(Updated May, 2018)

Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.

Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW Element. “Did not Perform” means that the specific SOW element was not performed under the contract.

Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not Rated.

The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections 5 and 6:

Very High

(VH)

The Offeror’s relevant past performance is of exceptional merit;

indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.

High

(H)

The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.

Moderate

(M)

The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.

Low

(L)

The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.

Very Low

(VL)

The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.

N/R Not Rated

Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.

RETURN THIS QUESTIONNAIRE TO: NASA Goddard Space Flight Center BY DUE DATE SPECIFIED IN RFP Attn: Lakeshia M. Robinson, Code 210.M Greenbelt, MD 20771 Phone: 301-286-8602 e-mail: Lakeshia.M.Robinson@nasa.gov mailto:Lakeshia.M.Robinson@nasa.gov

PAST PERFORMANCE QUESTIONNAIRE

1. Contract Information

A. Name of Company/Division Being Evaluated:_____________________

B. Address:_____________________________________________

C. Contractor Cage Code and/or DUNS number

D. Contract Number:_______________________________________

E. Contract Type:_________________________________________

F. Period of Performance (including options): From:______ To:_______

G. Total Contract Value:_____________________________________

H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________

2. Description of Contract

Briefly describe the services provided under this contract:

During the contract performance being evaluated, this firm was the:

Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________

Does a corporate or business relationship exist between the firm being evaluated and your organization?

Yes ___ No ___. If yes, please describe: ___________________________

3. Evaluator Information

Name: _____________________________________________________ Title: _______________________________________________________ Agency/Company: ____________________________________________ E-mail Address: _______________________________________________ Phone: ______________ Date Questionnaire Completed: _____________ Role in Program/Contract: ______________________________________ Length of Involvement in this Program/ Contract: _____________________

This form contains Source Selection Information when completed. See FAR 3.104. 3

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

SOW ELEMENT

PERFORMED

DID NOT

PERFORM

Software Systems Engineering - end-to-end software systems engineering for the development and the support of conceptual design, requirements specification, implementation and maintenance of software systems.

Flight Software and Systems - on-board, embedded software products that enable spacecraft hardware, science instruments and flight components to operate as an integrated on-orbit science observatory.

Development/Maintenance of Software Simulators (High and Moderate fidelity) Ground Software and Systems - requirements analysis, design, implementation, verification, validation, deployment and sustaining engineering for all types of ground software applications and architectures. System functionality can include; spacecraft command and control, flight dynamics, mission planning and scheduling, event monitoring and assessment, and telemetry trend analysis.

Science System Development - specification, design, development, installation, validation, modification, and operation of data systems for the acquisition, production, and distribution of data products. Development/migration of systems into a Cloud architecture.

Mission Operations/Flight System Verification and Validation - expertise of in-orbit operations engineering, operations planning and systems validation to ensure optimal operability of information systems.

Systems Administration/IT Security - Information Technology (IT) technical support to engineering facilities and associated end user devices. Inclusive of IT security-related initiatives such as leading the development, maintenance, and operations of system security plans for systems, supporting the development of policies and best practices checklists related to current and persistent IT security issues for lower level System Administrator’s (SA) use, and keeping abreast of current IT security related issues and mitigation processes.

Software Process Improvement – develop/maintain procedural requirements and guidance with companion process assets, tools, and training, as well as the website containing the library of assets, training documentation (including presentations, handouts, examples), and software specific lessons learned

Supporting Services - integrate, maintain and manage the secure Information Technology (IT) environment supporting research, engineering, and administrative information requirements;

including: (See six items below)

This form contains Source Selection Information when completed. See FAR 3.104. 4

1. Information Management/Architecture

2. Requirements Management

3. Configuration Management Services

4. Web Application Development and Maintenance

5. Software Tool Configuration/Management

6. Migration of server based software into a Cloud environment

This form contains Source Selection Information when completed. See FAR 3.104. 5

5. General Performance Survey

NO PERFORMANCE QUESTIONS PERFORMANCE RATING

(Please Circle)

QUALITY

1. Quality of services and support provided VH H M L VL N/R

2. Timely identification and mitigation of risks VH H M L VL N/R

3. Ability to identify and correct performance deficiencies in a timely manner VH H M L VL N/R

4. Demonstrated understanding and compliance with mission safety requirements VH H M L VL N/R

Comment:

SCHEDULE

5. Timeliness, quality, and accuracy of schedule estimates and reporting VH H M L VL N/R

6. Ability to meet/exceed schedule milestones VH H M L VL N/R

COST

7. Ability to establish realistic cost estimates and adhere to estimated costs VH H M L VL N/R

8. Ability to anticipate, identify and control cost growth. VH H M L VL N/R

BUSINESS/MANAGEMENT

9. Communicating/interfacing with Government and overall responsiveness to Government requests VH H M L VL N/R

10. Ability to effectively manage the contract including subcontractor performance, if applicable VH H M L VL N/R

11.

Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.

VH H M L VL N/R

12. Adequacy of Contractor’s system(s) for processing task orders and/or changes. VH H M L VL N/R

13. Ability to meet Small Business Subcontracting Plan Goals VH H M L VL N/R

This form contains Source Selection Information when completed. See FAR 3.104. 6

Section 6:

What is the Contract Value:

Initial Value Current Value Estimated Cost: $___________ $____________

Fee: $___________ $____________

Total Value: $___________ $_____________

What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?

What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?

For example (note, these example numbers may not relate to this specific procurement):

Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of $43,500,000 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $43,500,000 and associated period of performance for those expenditures, expressed in years, is 2.33 years.

Therefore, the Average Annual Cost/Fee Incurred to Date: $18,669,528 ($43,500,000/2.33 years)

Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:

If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.

Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost). If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.

Overall Contract Performance Rating (circle one)

Very High High Moderate Low Very Low

If less than Very High Performance Rating, please explain:

This form contains Source Selection Information when completed. See FAR 3.104. 7

Please add any other comments you may feel are pertinent.

Rater’s Signature Date

4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)

File details come from the government source that posted it. Updated .