This document is a NASA Past Performance Questionnaire, a detailed evaluation form used to assess a contractor's historical performance across multiple dimensions. The questionnaire is related to the Program and Analysis Control (PAAC VI) Support Services solicitation (80GSFC24R0042), which is an 8(a) set-aside competitive acquisition for a 5-year Indefinite Delivery Indefinite Quantity (IDIQ) contract. The scope of work includes critical project support services such as planning and scheduling, earned value management (EVM), resources and financial management, cost estimation, configuration management, documentation management, financial services, accounting, travel system processing, and project operations support.
The evaluation form provides a comprehensive rating methodology with performance levels ranging from Very High to Very Low across quality, schedule, cost, and business/management categories. Key submission details include returning the completed questionnaire to Sherry Barbour at NASA Goddard Space Flight Center by a to-be-determined date, with industry day scheduled for March 28, 2025, and comments on the Draft Request for Proposal due by March 24, 2025. The contract will support NASA Headquarters, Langley Research Center, and Goddard Space Flight Center, with the potential for Cost Plus Fixed Fee task orders.
View the file
Other files for this federal contract opportunity
Show all 50
Program and Analysis Control (PAAC VI) Support Services - Final Request for Propopsal (RFP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE QUESTIONNAIRE INSTRUCTIONS
(Updated May, 2018)
Sections 1-3 provide for contract-related descriptive information and identification of the evaluator.
Section 4 lists the major work elements within our Statement of Work (SOW). Please provide your assessment of the “relevant experience” and “performance” associated with our SOW evidenced within the contract for which you are a reference. “Experience” means a contractor who has performed work in the specific SOW Element. “Did not Perform” means that the specific SOW element was not performed under the contract.
Section 5 evaluates the contractor’s technical, schedule, and cost performance and management. (Additional pages may be used for comments if desired). If you cannot answer any questions, please circle “N/R” for Not Rated.
The following definitions are offered for your use in assigning a performance rating for each of the factors in Sections 5 and 6:
Very High
(VH)
The Offeror’s relevant past performance is of exceptional merit;
indicating exemplary performance in a timely, efficient, and economical manner; very minor (if any) problems with no adverse effect on overall performance.
High
(H)
The Offeror’s relevant past performance demonstrates very effective performance that would be fully responsive to contract requirements with contract requirements accomplished in a timely, efficient, and economical manner for the most part with only minor problems with little identifiable effect on overall performance.
Moderate
(M)
The Offeror’s relevant past performance demonstrates effective performance; fully responsive to contract requirements; reportable problems, but with little identifiable effect on overall performance.
Low
(L)
The Offeror’s relevant past performance meets or slightly exceeds minimum acceptable standards; adequate results; reportable problems with identifiable, but not substantial, effects on overall performance.
Very Low
(VL)
The Offeror’s relevant past performance does not meet minimum acceptable standards in one or more areas; remedial action required in one or more areas; problems in one or more areas which, adversely affect overall performance.
N/R Not Rated
Section 6 provides for evaluation of the contractor’s management of cost and award/incentive fee history.
RETURN THIS QUESTIONNAIRE TO NASA Goddard Space Flight Center BY TBD. Attn: Sherry Barbour , Code 174 Greenbelt, MD 20771 Phone: 301-286-6164 e-mail: Sherry.Barbour@nasa.gov
PAST PERFORMANCE QUESTIONNAIRE
1. Contract Information
A. Name of Company/Division Being Evaluated:_____________________
B. Address:_____________________________________________
C. Contractor Cage Code and/or DUNS number
D. Contract Number:_______________________________________
E. Contract Type:_________________________________________
F. Period of Performance (including options): From:______ To:_______
G. Total Contract Value:_____________________________________
H. Award Information: Competitive: Yes___ No___ Basis of Selection: Technical___ Cost/Price___ Other (specify)_________________________
2. Description of Contract
Briefly describe the services provided under this contract:
During the contract performance being evaluated, this firm was the:
Prime Contractor____ Significant Subcontractor ____ Team Member ____ Other (describe)____________________________________________
Does a corporate or business relationship exist between the firm being evaluated and your organization?
Yes ___ No ___. If yes, please describe: ___________________________
3. Evaluator Information
Name: _____________________________________________________ Title: _______________________________________________________ Agency/Company: ____________________________________________ E-mail Address: _______________________________________________ Phone: ______________ Date Questionnaire Completed: _____________ Role in Program/Contract: ______________________________________ Length of Involvement in this Program/ Contract: _____________________
This form contains Source Selection Information when completed. See FAR 3.104. 3
4. SOW Survey Relevance Ratings: Please check the appropriate blocks for Relevance (Performed or Did Not Perform)
SOW ELEMENT
PERFORMED
DID NOT
PERFORM
Planning & Scheduling: Correlate Schedules with Technical and approved Budgets. The Contractor shall interface with the technical product, element, or project leads and related resources personnel to correlate project schedules with the current approved budget profiles and plans.
EVM support to management. This includes but not limited to: EVM and IBR management training; Independent EVM assessments and reporting; Evaluation and implementation of EVM tools and interfaces; EVM Peer Reviews; Development and delivery of EVM and IBR training courses; creating and maintaining Center EVM documents and website content; and recommending EVM standards and processes.
Resources & Financial Management. The contractor shall formulate project budgets including labor, travel, and procurements detailed in the Work Breakdown Structure (WBS) structure of each project or program.
Cost Estimation. The contractor will develop project lifecycle cost estimates using NASA-approved commercial cost estimating tools. Working with Flight project scientists and systems engineers to validate technical baseline for cost estimation, advanced, and statistical cost modeling.
Configuration Management (CM). CM is a function which maintains the integrity of the mission or element build. CM is required by each Project office for in-house missions, as well as contracted ones, to be performed to comply with Agency and Center Guidance (Example: GPR
1410.2 or 400-PG-1410.2 or LMS-CP-804). Controlled documentation for hardware and software may encompass documents, drawings, program code, work order authorizations, parts lists, and other build documentation. Each mission is required to have a Configuration Management System (CMS) to keep track of programmatic, technical, and administrative issues and their resolution throughout its life.
Documentation Management. Control, Storage, Dissemination and Tracking of Project Documentation. The Contractor shall develop and update systems for the control, storage, and dissemination of all project documentation and configuration management-controlled documentation; and maintain systems for tracking and retrieving these materials and data.
Financial Services. The contractor shall provide comprehensive support for a portfolio of business systems and processes. Systems supported include, but are not limited to, SAP Core
This form contains Source Selection Information when completed. See FAR 3.104. 4
Financial, Business Objects (BOBJ) and Concur Government Edition (CGE). Collaboration with other organizations to provide support, system updates, and financial process information is required.
Accounting. The contractor shall provide professional accounting consulting support to NASA by analyzing, researching, and resolving complex accounting issues including, but not limited to, monthly and quarterly accounting activities, the annual financial statement audit, and advising on accounting standards and reporting requirements.
Travel System Processing. The contractor shall account for, prepare, and collect documentation for total travel (planned vs. actual); and coordinate travel arrangements in accordance with requirements for both domestic and OCONUS travel. Ensure funding is available and funding information is correct and accurate. Respond to inquiries from, and initiate inquiries to, travelers and other authorized personnel to secure additional or corrected information necessary for the processing of documents within the travel system.
Project Operations Support. The contractor shall provide operations support to programs, projects, and offices to include coordination of support activities, facility operations, Government property management, collaborations, technical documentation, project lifecycle reviews, and spaceflight hardware logistics.
This form contains Source Selection Information when completed. See FAR 3.104. 5
5. General Performance Survey
NO PERFORMANCE QUESTIONS PERFORMANCE RATING
(Please Circle)
QUALITY
1. Quality of services and support provided VH H M L VL N/R
2. Timely identification and mitigation of risks VH H M L VL N/R
3. Ability to identify and correct performance deficiencies in a timely manner VH H M L VL N/R
4. Demonstrated understanding and compliance with mission safety requirements VH H M L VL N/R
Comment:
SCHEDULE
5. Timeliness, quality, and accuracy of schedule estimates and reporting VH H M L VL N/R
6. Ability to meet/exceed schedule milestones VH H M L VL N/R
COST
7. Ability to establish realistic cost estimates and adhere to estimated costs VH H M L VL N/R
8. Ability to anticipate, identify and control cost growth. VH H M L VL N/R
BUSINESS/MANAGEMENT
9. Communicating/interfacing with Government and overall responsiveness to Government requests VH H M L VL N/R
10. Ability to effectively manage the contract including subcontractor performance, if applicable VH H M L VL N/R
11.
Ability to recruit and retain highly skilled personnel, including ability to fill key vacancies in a timely manner.
VH H M L VL N/R
12. Adequacy of Contractor’s system(s) for processing task orders and/or changes. VH H M L VL N/R
13. Ability to meet Small Business Subcontracting Plan Goals VH H M L VL N/R
This form contains Source Selection Information when completed. See FAR 3.104. 6
Section 6:
What is the Contract Value:
Initial Value Current Value Estimated Cost: $___________ $____________
Fee: $___________ $____________
Total Value: $___________ $_____________
What are the total contract expenditures to date (cost/fees to date based on invoices, reports, etc)?
What is the Annual Contract Value to Date (The current contract expenditures to date divided by the number of years of performance to date)?
For example (note, these example numbers may not relate to this specific procurement):
Assume your contract is a current five year contract, is still ongoing, and the latest cost report reflects a cost/fee of $43,500,000 through the first 2 years and 4 months (to date). In this example, current/total Contract Expenditures incurred to Date are $43,500,000 and associated period of performance for those expenditures, expressed in years, is 2.33 years.
Therefore, the Average Annual Cost/Fee Incurred to Date: $18,669,528 ($43,500,000/2.33 years)
Was there a cost overrun? ( ) Yes ( ) No If yes, please explain:
If this was an award fee contract, what are the individual and/or average ratings of performance by your organization? Please attach any available award fee letters or database entries.
Please comment on particularly strong/weak points of Contractor’s performance (technical, schedule, and/or cost). If the Overall Contract Performance Rating below is less than Very High, please provide some explanation in this section on why a higher rating was not provided.
Overall Contract Performance Rating (circle one)
Very High High Moderate Low Very Low
If less than Very High Performance Rating, please explain:
This form contains Source Selection Information when completed. See FAR 3.104. 7
Please add any other comments you may feel are pertinent.