DRFP 80GSFC24R0042 Terms and Conditions.pdf

PDF 1016 KB Posted

Attached to
Program and Analysis Control (PAAC VI) Support Services - Final Request for Propopsal (RFP) Federal contract opportunity
Solicitation number
80GSFC24R0042
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document is a Draft Request for Proposal (DRFP) for NASA's Program Analysis & Control (PAAC) VI Support Services contract. The solicitation seeks a contractor to provide Project Planning and Control (PP&C), Financial Services, and associated functions for NASA Headquarters, Langley Research Center, and Goddard Space Flight Center. The procurement will be conducted as an 8(a) small business set-aside for a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract with Cost Plus Fixed Fee task orders, with a 5-year effective ordering period.

Key details include a total contract value range of $1,000,000 minimum to $745 million maximum, with task orders to be issued under the contract. The contract will support NASA mission requirements across multiple centers, involving technical planning, financial management, and administrative support services. Potential contractors must possess a Secret-level facility security clearance and submit proposals electronically. An Industry Day is scheduled for March 28, 2025, and comments on the DRFP are due by March 24, 2025, to be submitted to the Contracting Officer, Sherry Barbour.

View the file

Other files for this federal contract opportunity

Other files attached to Program and Analysis Control (PAAC VI) Support Services - Final Request for Propopsal (RFP), newest first.
File Type Posted
80GSFC24R0042 FRFP Amendment 5 Final Signed.pdf PDF
80GSFC24R0042 FRFP Amendment 4 Final Signed.pdf PDF
Questions and Answers No 2 for FRFP PAAC VI - 10-1-25.pdf PDF
80GSFC24R0042 FRFP Amendment 3 Final Signed.pdf PDF
Final RFP GPM Exhibits 2-10 All IDIQ by CY Rev 1 - FRFP.xlsx XLSX spreadsheet
Enclosure 2 - Contract Historical Data Rev 1 - FRFP.pdf PDF
Enclosure 1 - GPM Rev 1 - FRFP.pdf PDF
80GSFC24R0042 FRFP Amendment 1 - 9-18-25 Final signed.pdf PDF
80GSFC24R0042 FRFP Amendment 2 Final Signed.pdf PDF
80GSFC24R0042 FRFP Amendment 1 - 9-18-25 Final signed.pdf PDF
Attachment A - Statement of Work - Amend 1.pdf PDF
Final RFP 80GSFC24R0042 SF33.pdf PDF
Final RFP Attachment B - IDIQ Cost-Type Rate Matrix--All IDI.pdf PDF
Final RFP Attachment J - Contract Data Requirements List (CD.pdf PDF
Final RFP Exhibits 1A-1B GPM IDIQ.xlsx XLSX spreadsheet
Final RFP GPM Exhibits 2-10 All IDIQ by CY.xlsx XLSX spreadsheet
Final RFP Exhibit 11A Total Compensation Rate Build-up Form.xlsx XLSX spreadsheet
Final RFP Attachment A - Statement of Work.pdf PDF
Final RFP Attachment F - Safety and Health Plan.pdf PDF
Final RFP Attachment I -Req Statements List.pdf PDF
Final RFP Attachment K - DD254.pdf PDF
Final RFP Enclosure 1 - GPM.pdf PDF
Final RFP Enclosure 3 - QASP.pdf PDF
Final RFP Exhibit 12 - Past Performance Questionnaire.pdf PDF
Final RFP Attachment D - IAGP.pdf PDF
Final RFP Attachment E - GFP.pdf PDF
Final RFP Attachment H.2 - OCI Avoidance Plan.pdf PDF
Final RFP Attachment N - Limitations on Subcontracting Report DRD.pdf PDF
Final RFP Enclosure 2 - Contract Historical Data.pdf PDF
Final RFP Attachment G - Contract Historical Data.pdf PDF
Questions and Answers for PAAC VI DRFP Final.pdf PDF
Industry Day Charts Final 3-24-25.pdf PDF
80GSFC24R0042 Amendment 1 Final 3-17-25 Signed.pdf PDF
DRFP 80GSFC24R0042 Terms and Conditions Final.pdf PDF
Attachment 1.pdf PDF
Industry Day Notice PAAC VI Virtual Final.pdf PDF
Enclosure 1 - GPM 3-14-25.pdf PDF
DRFP 80GSFC24R0042 SF33.pdf PDF
Attachment J - DRDs.pdf PDF
Attachment K - DD254.pdf PDF
Enclosure 4 - Sample Safety and Health Plan.pdf PDF
Attachment A - Statement of Work.pdf PDF
Attachment H - OCI Avoidance Plan.pdf PDF
Exhibit 11A Total Compensation Rate Build-up Form.xlsx XLSX spreadsheet
e-Lirbary on Sam.gov.zip ZIP file
DRFP 80GSFC24R0042 Cover Letter Final.pdf PDF
Attachment C - 533 Attach All IDIQ--Both Onsite and Offsite.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I -Req Statements List.pdf PDF
Enclosure 3 - QASP.pdf PDF
Show all 50

Program and Analysis Control (PAAC VI) Support Services - Final Request for Propopsal (RFP) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRFP 80GSFC24R0042

PART I – THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

B-2

3 Task Plans Section B

GSFC 52.216-91

Section I

NFS 1852.216-80

As Required in Clause NFS 1852.216-80

NASA Task Order Management System

(TOMS)

4 Reports of Work Section C

GSFC 52.235-90

Section H

NFS 1852.235-73

As Required in Clause GSFC 52.235-90

As specified in Clause

5 Contract Historical Data

Section C

GSFC 52.211-91

Attachment G

30 Days after Contracting Officer Request

Electronic Format/ Contracting Officer

(CO)

6 NASA Financial Management Reports

Section G

GSFC 52.242-90

Section G

NFS 1852.242-73

Attachment C

Monthly and Quarterly in accordance with Attachment C

Electronic Format/CO, Contracting Officer’s Representative (COR), Resource Analyst (RA) & Regional Finance Office

7 Foreign Travel Requests and Foreign Travel Reports

Section G

NFS 1852.242-71

Foreign Travel Requests–30 days in Advance of Travel

Foreign Travel Reports–Due within 10 business days of the completion of travel.

As specified in CO’s travel approval

8 Requests for Government Property

Section G

NFS 1852.245-70

30 Days Prior to Acquire Date

Electronic Format/CO

B-3

9 Financial Report of NASA Property in the Custody of Contractors (NF 1018)

Section G

NFS 1852.245-73

Annual Report by October 15th and Final Report

NF 1018 Electronic Submission System

(NESS)

10 Supplemental Financial Report of NASA Property in the Custody of Contractors

Section G

GSFC 52.245-99

Monthly By the 21st of each Month and Final Report

Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov

11 Physical Inventory of Capital Personal Property Reporting

Section G

NFS 1852.245-78

Within 10 Days of Annual Physical Inventory

Property Administrator

12 Government Real Property Maintenance Plan

Section G

NFS 1852.245-83

30 Days after Contract Effective Date

Electronic Format/CO and COR

13 Contractor Acquired Government Property Reporting

Section G

GSFC 52.245-93

Quarterly by Jan 30, Apr 30, July 30, and Oct 30

Electronic and Hard Copy Format /CO and SEMO, Code

14 Reporting of Inventions

Section G

NFS 1852.227-72

Section I

FAR 52.227-11

Interim Reports Every 12 Months (or sooner to preserve Patent Rights) and Final Report within 3 Months after Contract Completion

Electronic or Hard Copy Format/New Technology Representative or Patent Representative

15 Safety & Health Plan

Section H

FAR 52.236-13--

Alternate I

30 Days After Contract Award

16 Safety & Health Reporting

Section H

NFS 1852.223-70

Section H

Monthly/Quarterly Reports and As Required

NASA Mishap Information System

(NMIS)

B-4

NFS 1852.223-75

Section H

GSFC 52.223-91

17 Personal Identity Verification (PIV) Documentation and Reporting

Section H

GSFC 52.204-99

HQ 52.204-98

10th Day of the Month and As Required

Electronic Format and Hard Copy/COR & Code 240

18 Virginia and Local Sales Taxes

Section H

LaRC 52.229-92

30 Days after Contract Effective Date

Electronic Format/CO

19 Equal Opportunity Reports

Section I

FAR 52.222-26

As Specified by

FAR 52.222-26

Electronic Format/CO & Code

20 Certificate of Insurance

Section I

FAR 52.228-5

FAR 52.228-7

Section I

NFS 1852.228-75

As Specified by

FAR52.228-5

FAR 52.228-7

Electronic Format/CO

21 Subcontract Notification

Section I

FAR 52.244-2

30 Days Prior to Subcontract Award Date

Electronic or Hard Copy Format/CO

22 IT Security Awareness Training

Section I

NFS 1852.204-76

Section J Attachment J, DRD 002

Annual on Anniversary Date of Initial Training

Electronic Format/CO and COR

23 IT Security Role- Based Training

Section I

NFS 1852.204-76

Annual on Anniversary Date of Initial Training.

Evidence of

Format/CO and COR

B-5

Section J Attachment J, DRD 002

Completion Due Annually

24 Service Contract Reporting

Section I

FAR 52.204-14

FAR 52.204-15

Annually by October 31 and Revisions, if needed, by November 30 https://www.sam.gov

25 Federal Acquisition Supply Chain Security Act Orders (FASCSA) Report

Section I

FAR 52.204-30

As specified by

FAR 52.204-30,

Within 3 business days from the date of identification or notification

NOTE: Unless otherwise specified, “day” means “calendar day”.

(End of clause)

GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES

(COST REIMBURSEMENT). (MAR 2022)

(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $1,000,000. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $745M. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.

(b) The minimum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals or exceeds the minimum amount stated in paragraph (a).

(c) The maximum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals the maximum amount stated in paragraph (a).

(d) The maximum amount, if reached, precludes the issuance of further orders for supplies or services under this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the Changes clause.

B-6

GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST

REIMBURSEMENT). (APR 2022)

(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in Attachment B, to calculate the proposed estimated costs for all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.

(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.

(c) The Government and Contractor agree that the fixed fee percentage specified in Attachment B shall be used to calculate the fixed fee dollars on all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.

(End of clause)

GSFC 52.232-94 ESTIMATED COST INCREASES. (DEC 2005)

(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order. Notification shall not be delayed pending preparation of a proposal.

(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.

(c)(1) The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:

Incurred costs to date

Projected cost to completion

Total cost at completion

B-7

Current negotiated estimated cost

Requested increase in estimated cost

(2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:

(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.

(ii) Supporting explanation for the increases and projections, sufficient for the Government to understand the reasons for the increased estimated cost.

80GSFC24R0042

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-1

GSFC 52.211-91 SCOPE OF WORK. (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachment A; Safety and Health Plan, Attachment F; Requirements Statement List, Attachment I and task orders issued hereunder.

(End of clause)

GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER

SOFTWARE. (MAR 2008)

In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following:

NONE

(End of clause)

GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA). (MAR 2022)

(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance.

Reports shall address the accomplishments and progress of all work performed under each Task Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.

(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed Task Order that summarizes the results of the entire Task Order, including recommendations and conclusions based on the experience and results obtained. The Final Task Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order. The final report shall also include the final incurred cost for the Task Order.

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C-2

(c) Submission. The Contractor shall submit the reports required by this clause as follows:

Copies Report Type Addressee Mail Code

1 M, F Contracting Officer (CO) 174

1 M, F Contracting Officer's Representative (COR) 155

1 M, F Task Monitor See Task Order

[M=Monthly Report, F=Final Report]

(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order

SECTION D - PACKAGING AND MARKING

D-1

1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT.

(JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

Goddard Space Flight Center Building 35, Code 279 Greenbelt, MD 20771

OR

SECTION D - PACKAGING AND MARKING

D-2

NASA/Headquarters 300 E. Street SW Washington, D.C. 20546

OR

NASA Langley Research Center 4 South Marvin Street, Bldg. 1206 Hampton, VA 23681-2199

As specified in individual Task Orders issued

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

SECTION E - INSPECTION AND ACCEPTANCE

E-1

Clauses incorporated by reference:

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1):

52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT. (APR 1984)

(End of by reference clauses)

GSFC 52.246-92 ACCEPTANCE -- SERVICES. (APR 2022)

The Contracting Officer or authorized representative will accomplish acceptance at the NASA/Goddard Space Flight Center, NASA Headquarters, NASA/Langley Research Center or as specified in individual task orders issued. For the purpose of this clause, the Contracting Officer's Representative delegated on this contract is the authorized representative. The Contracting Officer reserves the right to unilaterally designate a different Government agent as the authorized representative. The Contractor will be notified by a written notice or by a copy of the delegation of authority if different representative is designated.

(End of clause)

GSFC 52.246-102 INSPECTION SYSTEM RECORDS. (APR 2013)

The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

SECTION F - DELIVERIES OR PERFORMANCE

F-1

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1):

52.242-15 STOP-WORK ORDER. (AUG 1989) – ALTERNATE I (APR 1984)

(End of by reference clauses)

GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)

The effective ordering period of this contract shall be for a period of 5 years from the contract effective date of TBD.

(End of clause)

GSFC 52.237-92 PLACE OF PERFORMANCE - SERVICES. (NOV 2013)

The services to be performed under this contact shall be performed at the following location(s):

GSFC Facilities and Installation, Langley Research Center (LaRC) and NASA HQ. Other NASA Centers, Contractor Facilities and/or alternate places of performance may be specified in individual task orders issued.

(End of clause)

GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING. (FEB 2016)

Shipments of the items required under this contract shall be to:

Receiving Officer

Goddard Space Flight Center Building 35, Code 279 Greenbelt, Maryland 20771

GSFC Wallops Flight Facility Building F-19 Wallops Island, VA 23337

SECTION F - DELIVERIES OR PERFORMANCE

F-2

NASA Headquarters 300 E. Street SW Washington, DC 20546

OR

Langley Research Center 4 South Marvin Street (Bldg. 1206) Hampton, VA 23681

OR

Other NASA Centers, or alternate places of performance specified in individual task orders issued.

Marked for:

Technical Officer: TBD, Code TBD Building: TBD Room: TBD Contract No.: TBD Item(s) No.: TBD

Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.

SECTION G - CONTRACT ADMINISTRATION DATA

G-1

NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES:

1852.216-75 PAYMENT OF FIXED FEE. (DEC 1988)

1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT

REPRESENTATIVE. (APR 2015)

1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES. (DEC 1988)

1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING. (NOV

2004)

1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED PROPERTY.

(AUG 2015)

1852.245-75 PROPERTY MANAGEMENT CHANGES. (JAN 2011)

1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY. (AUG 2015)

(End of by reference clauses)

1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT. (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

G-2

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

G-3

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

(End of clause)

1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY. (JUN

2018) ALTERNATE I (JAN 2011)

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

Notify the cognizant property custodian, Contracting Officer’s Representative (COR), and the Installation Security Officer immediately if theft of Government property is suspected or property cannot be located

Identify Government property equipment that is no longer considered necessary for performance of the contract.

Ensure that equipment is turned in to the Property Disposal Officer through the cognizant property custodian when no longer needed. This is the only acceptable procedure for disposal of Government property.

G-4

Do not relocate Government property within Government premises or remove Government property from Government premises without written approval.

Ensure that Government property, including property leased to the Government, is used only for the purposes of performing the contract.

Ensure that Government property is protected and conserved.

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) (i) The Contractor shall not utilize the installation's central receiving facility for receipt of contractor-acquired property. However, the Contractor shall provide listings suitable for establishing accountable records of all such property received, on a monthly basis, to the SEMO.

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph

G-5

(a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.

(c) The following property and services are provided if checked:

[X] (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.

[X] (2) Office furniture.

[X] (3) Property listed in Attachment D

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.

[X] (4) Supplies from stores stock.

[X] (5) Publications and blank forms stocked by the installation.

[X] (6) Safety and fire protection for Contractor personnel and facilities.

[X] (7) Installation service facilities: IT services through NASA’s End User Services Program Office (EUSO) Enterprise Contract and other GSFC institutional and direct project founded IT facilities, services, and end-item contract vehicles (e.g. SEWP)

[X] (8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.

[X] (9) Cafeteria privileges for Contractor employees during normal operating hours.

[X] (10) Building maintenance for facilities occupied by Contractor personnel.

[X] (11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.

G-6

1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF

CONTRACTORS. (JAN 2017)

(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by

NASA.

(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.

(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.

(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address:

NASA/Goddard Space Flight Center, Supply and Equipment Management Branch, Code 273 8800 Greenbelt Road, Greenbelt, MD 20771, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.

(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.

(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors' procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention. Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period. Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.

G-7

(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the contractor has a value of $10 million or more, the contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.

(4) The Contracting Officer may, in NASA's interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.

(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.

1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR

52.245–1. (JAN 2011)

For performance of work under this contract, the Government will make available Government property identified below or in Attachment E of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245–1, Government Property, as incorporated in this contract.

The Contractor shall use this property in the performance of this contract at GSFC facilities and installations, NASA LaRC, NASA HQ, and at other location(s) as may be approved by the Contracting Officer. Under FAR 52.245–1, the Contractor is accountable for the identified property.

(End of clause)

1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS. (SEP 2017)

(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPD 8831.2, Facilities Maintenance and Operations Management.

(3) LAPD 8800.14, Real Property Management

G-8

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property.

The Contractor shall restore damaged property to its original condition at the Contractor's expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

(End of clause)

1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS. (JAN 2011)

(a) In addition to the requirements of the FAR Government Property Clause incorporated in this contract (FAR 52.245-1), the Contractor shall comply with the following in performance of any maintenance, construction, modification, demolition, or management activities of any Government real property:

(1) NPD 8800.14, Policy for Real Property Management.

(2) NPR 8831.2, Facility Maintenance Management.

(b) Within 30 calendar days following award, the Contractor shall provide a plan for maintenance of Government real property provided for use under this contract. The Contractor's maintenance program shall enable the identification, disclosure, and performance of normal and routine preventative maintenance and repair. The Contractor shall disclose and report to the Contracting Officer the need for replacement and/or capital rehabilitation. Upon acceptance by the Contracting Officer, the program shall become a requirement under this contract.

(c) Title to parts replaced by the Contractor in carrying out its normal maintenance obligations shall pass to and vest in the Government upon completion of their installation in the facilities.

The Contractor shall keep the property free and clear of all liens and encumbrances.

(d) The Contractor shall keep records of all work done to real property, including plans, drawings, charts, warranties, and manuals. Records shall be complete and current. Record of all transactions shall be auditable. The Government shall have access to these records at all reasonable times, for the purposes of reviewing, inspecting, and evaluating the Contractor's real

G-9 property management effectiveness. When real property is disposed of under this contract, the Contractor shall deliver the related records to the Government.

(e) The Contracting Officer may direct the Contractor in writing to reduce the work required by the maintenance program authorized in paragraph (b) of this clause at any time.

(End of clause)

GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS. (MAR 2022)

The following personnel are authorized to issue orders under this contract. All designated personnel are employed by the NASA’s Goddard Space Flight Center unless otherwise indicated:

Contracting Officer, GSFC, Code 174

GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING. (JUN 2014)

(a) Requirements. This clause provides the supplemental instructions referred to in NASA FAR Supplement (NFS) clause 1852.242-73. The NFS clause and NASA Procedural Requirements (NPR) 9501.2E, “NASA Contractor Financial Management Reporting”, establish report due dates and other financial management reporting requirements. NPR 9501.2E permits withholding of payment for noncompliance.

(b) Supplemental instructions. (1) Monthly (NF 533M) reports are required. Quarterly (NF 533Q) reports are also required. The reporting structure shall be in accordance with Attachment C of Section J of this contract.

(2) As stated in NPR 9501.2E, NASA strongly encourages electronic contractor cost reporting.

The preferred formats are Excel and Adobe. Contact the Contracting Officer for any E-Mail addresses that are not provided or which become noncurrent.

Distribution shall be as follows:

Contracting Officer, Code 174

E-Mail: TBD

Contracting Officer’s Representative, Code 155

E-Mail: TBD

Resources Analyst, Code 155

E-Mail: TBD

G-10

Regional Finance Office Cost Team, Code 155.2

E-Mail: GSFC-rfocateam@lists.nasa.gov

Administrative Contracting Officer (if delegated)

(c) Web site. NPR 9501.2E, “NASA Contractor Financial Management Reporting”:

http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E

(End of clause)

GSFC 52.245-93 REPORTS OF CONTRACTOR ACQUIRED GOVERNMENT

PROPERTY. (MAR 2014)

Refer to subparagraph (b)(1)(i) of NASA FAR Supplement clause 1852.245-71, "Installation Accountable Government Property--Alternate I" of this contract.

(a) Definition. "Controlled equipment" means all equipment with an acquisition cost of $5,000 or more, that has an estimated service life of 2 years or more, which will not be consumed or expended in an experiment, and selected items of equipment with an acquisition cost less than $5,000 that are designated, and identified as sensitive by Appendix C of NPR 4200.1 and by the GSFC Information and Logistics Management Division, Supply and Equipment Management Branch, Code 273.

(b) Property, regardless of value, shall not be purchased on the account of the Government unless authorized by the terms of the contract or approved by the Contracting Officer, including compliance by the contractor with the Subcontracts clause of this contract. Further, any purchase of equipment shall not be made until the equipment has been screened through NASA inventories and other authorized Federal excess sources for item availability in accordance with NASA FAR Supplement clause 1852.245-70.

(c) Immediately after the purchase of any controlled equipment, the Contractor shall submit a GSFC Form 20-4, Shipping Document, to the GSFC Supply and Equipment Management Branch, Code 273, for the purpose of entry of the controlled equipment data into the NASA Property, Plant and Equipment System (NASA PP&E). A copy of the GSFC Form 20-4 shall also be provided to the GSFC General Accounting Department, General Ledger Section, Code 157, within 5 working days. The GSFC Form 20-4, or other form acceptable to the GSFC Supply and Equipment Management Branch, must contain all of the data elements necessary to establish accountability, including both the contract number and the Contractor's purchase order number under which the equipment was purchased.

(d) The Contractor shall submit, on a quarterly basis, a report of all property acquired by the Contractor under the contract during the reporting period and to which the Government has title, regardless of acquisition value. This report must be submitted within 30 calendar days after the

G-11 end of each calendar year quarter; i.e., January 30, April 30, July 30, and October 30. Submittal shall be to the Contracting Officer and to the Supply and Equipment Management Officer, Code

273. For acquisitions of controlled equipment, the list shall include item description, acquisition date, acquisition value, manufacturer, model, serial number, location of the items, and GSFC property number. For all other acquisitions, the list shall include item description, quantity, cost, and location of the items. Controlled equipment previously reported on GSFC Form 20-4s, or on other forms, shall be included in the quarterly reports. Negative reports shall be submitted, if applicable.

(e) If the contractor maintains a stock inventory of Installation-Accountable Government Property with a minimum average value of $75,000, the Contractor shall comply with NPR

4100.1. The Contractor shall submit a monthly NASA Form 1489, Analysis of Physical Inventory Report; NASA Form 1324, Semi-annual Report of Personal Property Operations (for which periods end March 31 and September 30) and NASA Form 1619, Physical Inventory of Materials Annual Report (for which period ends September 30), within 5 working days of the end of the reporting period. The NASA Forms 1489, 1324 and 1619, should be submitted to the Supply and Equipment Management Officer, Code 273, with a copy to the Contracting Officer. A copy of NASA Form 1489 should be submitted to Code 157.2, General Ledger.

(End of clause)

GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY - ON-SITE AND OFF-SITE.

(APR 2016)

(a) Performance of this contract requires that Contractor personnel and any furnished and/or acquired Government property be located at both Government controlled and managed premises (onsite) and at Contractor controlled and managed premises (offsite). The requirements for control and accountability of Government property differ depending upon the location of the property. The applicability of the clauses in this contract to on-site and to off-site locations is indicated below.

(b) Clauses, if included in the contract, are applicable to both onsite and offsite locations.

FAR clause 52.245-1, “Government Property”

FAR clause 52.245-9, “Use and Charges”

NASA FAR Supplement clause 1852.245-70, “Contractor Requests for Government-Provided Property”

NASA FAR Supplement clause 1852.245-72, “Liability for Government Property Furnished for Repair or Other Services”

G-12

NASA FAR Supplement clause 1852.245-73, “Financial Reporting of NASA Property in the Custody of Contractors"

NASA FAR Supplement clause 1852.245-74, “Identification and Marking of Government Equipment”

NASA FAR Supplement clause1852.245-75, “Property Management Changes”

NASA FAR Supplement clause 1852.245-78, “Physical Inventory of Capital Personal Property”

NASA FAR Supplement clause 1852.245-79, “Records and Disposition Reports for Government Property with Potential Historic or Significant Real Value”

NASA FAR Supplement clause 1852.245-83, “Real Property Management Requirements”

GSFC clause 52.245-99, “Supplemental Financial Reporting of NASA Property in the Custody of Contractors”

(c) Clauses, if included in the contract, are applicable to offsite locations only.

NASA FAR Supplement clause 1852.245-76, “List of Government Property Furnished Pursuant to FAR 52.245-1”

(d) Clauses, if included in the contract, are applicable to onsite locations only.

FAR clause 52.245-2, “Government Property Installation Operation Services”

NASA FAR Supplement clause 1852.245-71, “Installation-Accountable Government Property"

NASA FAR Supplement clause 1852.245-77, “List of Government Property Furnished Pursuant to FAR 52.245-2”

NASA FAR Supplement clause 1852.245-82, “Occupancy Management Requirements”

GSFC clause 52.245-93, “Reports of Contractor Acquired Government Property”

(End of clause)

GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA PROPERTY

IN THE CUSTODY OF CONTRACTORS (JUN 2019)

(a) In addition to the annual 1018 reporting required under clause NFS 1852.245-73 of this contract, the Contractor shall submit monthly property financial reports as described below if, at either award or any time during contract performance, the cumulative amount of NASA property is $10 million or more.

(1) Monthly property financial reports shall be submitted including item-level supporting data for all items acquired/fabricated/modified where the total acquisition cost of the item is $500,000 or

G-13 more, in the contractor’s or its subcontractors’ possession. This data shall be submitted for all items in the property classifications of real property, equipment, special test equipment, special tooling, and agency peculiar property.

(2) Monthly data shall also be submitted for items of any acquisition cost in the classifications of materials and contract work-in-process (WIP). Specifically, itemized monthly data is required for materials and WIP line items when the estimated total acquisition cost of any item at completion will be $500,000 or more.

(b) The monthly reports shall be electronically submitted using the Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov using the format described in the CHATS user’s manual.

(c) Acquisition costs shall be developed using actual costs to the greatest extent possible, especially costs directly related to fabrication such as labor and materials. Supporting documentation shall be maintained and available for all amounts reported, including any amounts developed using estimating techniques.

(d) All adjustments shall be thoroughly explained and directly related to a specific Government Fiscal Year (GFY). If the GFY cannot be determined, the default shall be the previous GFY.

(e) Work Breakdown Structures (WBS) shall be provided for all Contractor acquired property (CAP), WIP, and any new materials acquired. The format shall be a five digit numerical level.

(i.e., 803-10). If the WBS is not identifiable, contact the NASA GSFC Property Office for further guidance, as provided in paragraph (f)(4) below.

(f)(1) The data required for the monthly submission is due the 21st day after the close of the month.

e.g., August 21 for the month ending July 31

September 21 for the month ending August 31

October 21 for the month ending September 30

(2) The monthly property financial reports required by this clause are separate from, and in addition to the annual NF 1018 reports.

(3) Both the NF 1018 report data and the September monthly report data are as of September 30.

Corrections in monthly report data shall be handled as adjustments in the next monthly report after discovery of the error. (e.g., Errors in the September monthly report shall be reported as adjustments in the October monthly report. The NF 1018 shall reflect the corrected numbers and the contractor shall provide a note regarding the corrected monthly report error under Comments in the NF 1018.) Errors in the NF1018 found after the November 30 submission shall be reported as adjustments in the NF 1018 for the next reporting year, unless immediate correction and resubmission are directed by NASA.

G-14

(4) Questions may be directed to the following individuals of the NASA GSFC Property Office:

Angela King, (301) 286-3543, email angela.c.king@nasa.gov

Timothy Kelly (301) 286-8819, email: timothy.e.kelly@nasa.gov

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1

NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES:

1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING. (NOV 2004)

1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING. (DEC 2015)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY. (FEB 2002) ALTERNATE I

(FEB 2006)

1852.235-73 FINAL SCIENTIFIC AND TECHNICAL REPORTS (DEC 2006)

52.236-13 ACCIDENT PREVENTION (NOV 1991) – ALTERNATE I (NOV 1991)

1852.242-72 DENIED ACCESS TO NASA FACILITIES. (OCT 2015)

(End of by reference clauses)

1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)

(a) The Contracting Officer has determined that this acquisition may give rise to a potential organizational conflict of interest. Accordingly, the attention of prospective offerors is invited to FAR Subpart 9.5 - Organizational Conflicts of Interest.

(b) The nature of these conflicts are that in performing this contract, there are situations where the services performed may give rise to the significant potential organizational conflicts of interest listed below.

(1) The contractor (or its proposed subcontractors), as part of its performance of a Government contract, has in some sense set the ground rules for another Government contract and could skew future competitions, whether intentionally or not, to their advantage. By virtue of their special knowledge of the agency's future requirements, the contractor or its proposed subcontractors would have an unfair advantage in the competition for those requirements.

H-2

(2) There is a concern that the successful contractor or its proposed subcontractor(s), as part of their performance of a Government contract, obtains access to another contractor’s proprietary, business confidential, or financial data and/or non-public Government information, which may provide the firm an unfair competitive advantage in a future competition. The Contractor shall protect this data/information from unauthorized use and disclosure and agrees not to use it, either directly or indirectly, in any proposals responding to a future Government solicitation.

(c) The restrictions upon future contracting are as follows:

(1) If the Contractor, through the performance of this contract, is required to develop specifications or statements of work that are to be incorporated into a solicitation, the Contractor shall be ineligible to perform the work described in that solicitation as a prime or subcontractor under an ensuing NASA contract. This restriction shall remain in effect for a reasonable time, as agreed to by the Contracting Officer and the Contractor, sufficient to avoid an unfair competitive advantage or potential bias (this time shall not be less than the duration of the initial production contract). NASA shall not unilaterally require the Contractor to prepare such specifications or statements of work under this contract.

(2) To the extent that the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as these data remain proprietary or confidential, the Contractor shall protect these data from unauthorized use and disclosure and agrees not to use them to complete with those other companies.

1852.225-70 EXPORT LICENSES. (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract.

In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining…

This is the start of the file's text. The full file is on GovTribe.