This is a specification document for micro surfacing work issued by the City of Casselberry in Seminole County, Florida, as part of the PW 2309 Road Rehabilitation and ADA Pavement Improvements project (ITB-2025-1249). The specification details the materials, equipment, quality standards, and application procedures for constructing micro surfacing pavement, a mixture of polymer-modified emulsified asphalt, mineral aggregate, mineral filler, water, and additives that can be applied in variable thicknesses. The project encompasses approximately 7.267 miles of road rehabilitation across multiple city locations, with work including milling, resurfacing, curb ramp construction, sidewalk installation, and pavement markings. The specification requires contractors to use approved emulsified asphalt meeting AASHTO M 208 CSS-1h standards with a minimum of 3.0% polymer solids, 100% crushed stone aggregate from the Florida Department of Transportation's approved source list, and application rates ranging from 12 to 34 pounds per square yard depending on surface type and lift configuration. A non-mandatory pre-bid meeting was held on December 5, 2024, with bids due January 14, 2025, before 2:00 p.m., and the project requires 150 consecutive calendar days from Notice to Proceed for substantial completion with an additional 30 days for final completion.
The specification mandates that all contractors and subcontractors be FDOT prequalified in flexible paving and hot plant-mixed bituminous courses, with bidders required to submit minimum five micro-surfacing project references completed within the past two years in Florida municipalities, including project dates, square yardage treated, and government contact information. Contractors must possess at minimum four truck-mounted micro-surfacing machines and two self-loading machines at the time of bidding, subject to inspection by city staff as grounds for bid rejection if deficient. The specification establishes strict quality assurance requirements including computerized material monitoring systems, daily sampling and testing of mixture components, application rate tolerances of ±2 pounds per square yard, and acceptance limits for aggregate gradation and emulsified asphalt residual content. Weather limitations restrict application to temperatures above 50°F with no rain or standing water, and the contractor must provide a three-year warranty covering all labor, materials, hauling, traffic control, and striping to repair defective areas including debonding, delamination, bleeding, excessive raveling, and aggregate loss. Two bids were received totaling $5,399,711.18 from Cathcart Construction Company and $2,977,679.26 from MASCI General Contractor, Inc., against an engineer's estimate of $2,200,501.09 plus a 5% contract amendment allowance, with funding through the city's procurement process and award to the lowest responsive and responsible bidder.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICRO SURFACING.
SECTION 335
MICRO SURFACING
335-1 Description.
Construct a micro surfacing pavement with the type of mixture specified in the Contract Documents. Micro surfacing is a mixture of polymer-modified emulsified asphalt, mineral aggregate, mineral filler, water, and other additives, properly proportioned, mixed and spread on a paved surface.
The mix shall be capable of being spread in variable thickness cross-sections (wedges, ruts, scratch courses and surfaces) which, after curing and initial traffic consolidation, resists compaction throughout the entire design tolerance range of asphalt binder content and variable thickness to be encountered. The end product shall maintain a skid-resistant surface in variable thick sections throughout the service life of the micro surfacing.
The mix shall be a quick-traffic system that will be able to accept straight rolling traffic one hour after application.
335-2 Materials.
335-2.1 Emulsified Asphalt:
335-2.1.1 General Requirements:
Provide a quick-traffic, polymer-modified emulsified asphalt conforming to the requirements specified in AASHTO M 208 for CSS-1h as listed in Table 335-1. The cement mixing test shall be waived for this product.
The polymer material shall be co-milled into the asphalt or added to the emulsifier solution prior to the emulsification process. The amount of polymer modifier shall not be less than 3.0% polymer solids based on the asphalt content (by weight) and will be certified by the emulsified asphalt supplier.
The Engineer may waive the five-day settlement test, provided job-stored emulsified asphalt is used within 36 hours from the time of the shipment or the stored material has had additional emulsified asphalt blended into it prior to use.
335-2.1.2 Quality Tests:
The emulsified asphalt, and emulsified asphalt residue, shall meet the requirements of AASHTO M 208 for CSS-1h, with the following additions:
Table 335-1 Quality Tests for Emulsified Asphalt
AASHTO Test No. Emulsified Asphalt Property Specification Requirements AASHTO T 59 Residue after Distillation (1) 62% Minimum AASHTO T 59 Cement Mixing Not Required
Quality Tests for Emulsified Asphalt Residue
AASHTO T 53 Softening Point 135°F (57°C) Minimum
(1) Maintain the test temperature at 350°F (177°C) for 20 minutes.
335-2.1.3 Sampling, Certification, and Verification:
For the first load of emulsified asphalt produced for the project, the supplier shall submit a sample to the Engineer for testing before use. A pretest number will then be assigned by the Engineer, and the pretest number shall be furnished with all emulsified asphalt delivered to the project.
At any time during application, the Engineer may sample and test all subsequent loads of emulsified asphalt delivered to the project to verify and determine compliance with specification requirements. Where these tests identify material outside specification requirements, the Engineer may require the supplier to cease shipment of that pre-tested product. Further shipment of that pre-tested product to the owning agency’s projects will remain suspended until the cause of the problem is evaluated and corrected by the supplier to the satisfaction of the Engineer.
335-2.2 Aggregate:
335-2.2.1 General:
Use an aggregate consisting of 100% crushed stone. The aggregate shall be a crushed stone such as granite, slag, limestone, chat, or other high-quality aggregate, or a combination thereof. To assure the material is 100 percent crushed, the parent aggregate will be larger than the largest stone in the gradation used. Use aggregate source(s) from the list of aggregates available on the Florida Department of Transportation’s website and also meeting the requirements of this specification. The URL for obtaining the list of aggregates is: ftp://ftp.dot.state.fl.us/fdot/smo/website/sources/frictioncourse.pdf .
ftp://ftp.dot.state.fl.us/fdot/smo/website/sources/frictioncourse.pdf
335-2.2.2 Aggregate Quality Tests:
In addition to the requirements of FDOT Standard Specification Sections 901 and 902, meet the minimum aggregate requirements of Table 335-2.
Table 335-2 Quality Tests for Aggregate
AASHTO Test No. Aggregate Property Specification Requirements AASHTO T 176 Sand Equivalent 65 Minimum AASHTO T 104 Soundness 15% Maximum using Na2SO4 or
25% Maximum using MgSO4 AASHTO T 96 Abrasion Resistance (1) 30% Maximum
(1) The abrasion test will be performed on the parent aggregate.
335-2.2.3 Gradation Requirements:
When tested in accordance with FM 1-T 027 and FM 1-T 011, the target (mix design) aggregate gradation, including the mineral filler, shall be within the gradation range for a Type II mixture shown in Table 335-3, Column II.
Table 335-3 Mix Design Gradation Requirements
Sieve Size Type II Mix Design Range Percent Passing
Stockpile Tolerance from Mix Design Percent Passing
3/8 inch 100 N/A No. 4 90 – 100 ± 5% No. 8 65 – 90 ± 5% No. 16 45 – 70 ± 5% No. 30 30 – 50 ± 5% No. 50 18 – 30 ± 4% No. 100 10 – 21 ± 3% No. 200 5 – 15 ± 2%
The aggregate will be accepted from the stockpile located at the project. The stockpile will be accepted based on five quality control gradation tests conducted in accordance with FM 1-T 002. If the average of the five gradation tests is within the stockpile tolerances shown in Table 335-3, Column III for all of the sieve sizes, then the stockpile is accepted. If the average of the five gradation tests is not within the stockpile tolerances shown in Table 335-3, Column III, for any sieve size, remove the stockpiled material and replace it with new aggregate or blend other aggregate sources with the stockpiled material. Aggregates used in blending must meet the quality tests shown in Table 335-2 before blending and must be blended in a manner to produce a consistent gradation and sand equivalent value. If new aggregate is obtained or blending of aggregates is performed resulting in an aggregate that is not represented by the mix design, submit a new mix design to the Engineer for approval prior to production of the mix.
The Engineer may obtain stockpile samples at any time. If the average of five gradation tests conducted in accordance with FM 1-T 002 is not within the gradation tolerances shown in Table 335-3, Column III for any sieve size, cease production until the problem is corrected to the satisfaction of the Engineer.
Screen all stockpiled aggregates at the stockpile area prior to delivery to the paving machine to remove oversize material and non-desirable particles.
335-2.3 Mineral Filler:
If mineral filler is utilized in the mix design, use non air-entrained Portland cement or hydrated lime that is free from lumps. The Engineer will accept the mineral filler by visual inspection. The type and amount of mineral filler shall be determined by a laboratory mix design and will be considered as part of the aggregate gradation. An increase or decrease of less than one percent mineral filler may be permitted during production if it is found to result in better consistency or set times. Any changes to the percentage of mineral filler must meet the requirements of Table 335-5.
335-2.4 Water:
Utilize water that is potable and free of harmful soluble salts, reactive chemicals, or any other contaminants.
335-2.5 Additives:
Additives may be added to the mixture or any of the component materials to provide control of quick-trafficking properties. The additives to be used should be indicated on the mix design and be compatible with the other components of the mix.
335-2.6 Crack Filler:
Utilize a crack filler meeting the material requirements of Developmental Specification Section 305.
335-3 Mix Design.
Before work begins, the Contractor shall submit a mix design to the Engineer. The mix design must have an aggregate source used on five (5) similar projects and have been developed using the specific materials to be used on the project. The mix design shall be developed by an independent, accredited laboratory with no affiliation to the emulsion supplier and is endorsed by the International Slurry Surfacing Association (ISSA) and has experience in designing micro surfacing mixtures.
Submit the proposed mix design with supporting test data indicating compliance with all mix design criteria. Allow the Engineer a maximum of two weeks to either conditionally verify or reject the mix design.
Meet the requirements provided in Table 335-4. After the mix design has been approved, no substitutions to the mix design will be permitted, unless approved by the Engineer.
The Engineer will consider inadequate field performance of a mix as sufficient evidence that the properties of the mix related to the mix design have changed, and the Engineer will no longer allow the use of the mix design. The project will be stopped until it is demonstrated that those properties, or issues, have been sufficiently addressed.
Table 335-4 Mix Design Testing Requirements
ISSA Test No. Property Specification Requirements ISSA TB-139(1) Wet Cohesion:
@ 30 Minutes Minimum (Set) @ 60 Minutes Minimum (Traffic)
12 kg-cm Minimum
20 kg-cm or Near Spin Minimum ISSA TB-109 Excess Asphalt by Loaded Wheel
Tester (LWT) Sand Adhesion 50 g/ft2 Maximum
ISSA TB-114 Wet Stripping 90% Minimum ISSA TB-100 Wet-track Abrasion Loss:
One-hour Soak Six-day Soak
50 g/ft2 Maximum 75 g/ft2 Maximum
ISSA TB-147 Lateral Displacement Specific Gravity after 1,000 Cycles of 125 lb.
5% Maximum
2.10 Maximum
ISSA TB-113(1) Mix Time @ 77°F (25°C) Controllable to 120 Seconds Minimum
(1) The Cohesion test and Mixing Time test should be checked and reported for the highest temperatures expected during construction.
The mix design must clearly show the proportions of aggregate, emulsified asphalt, mineral filler, water, and additive usage based on the dry weight of the aggregate. Meet the mix design component material requirements provided in Table 335-5.
Table 335-5 Mix Design Component Material Requirements
Component Materials Specification Requirements Residual Asphalt 5.5 to 10.5% (by dry weight of aggregate) Mineral Filler 0.5 to 3.0% (by dry weight of aggregate) Polymer-based Modifier Minimum of 3.0% (solids based on asphalt weight content) Additives As needed Water As required to produce proper mix consistency
The materials (aggregates, emulsion, mineral filler, and additives) must be from the same source, grade and type used to develop the approved mix design. Any substitutions or alternate supplies must be preapproved by the Engineer. Changes in the aggregate source or emulsion source requires re-validating the mix design and the performance properties.
Blending, co-mingling and otherwise combining materials from two or more sources, grades or types is strictly prohibited. Aggregate stockpiles and emulsion material should be located at or near the job site in sufficient quantity for the job or designated parts of the job.
335-4 Equipment.
335-4.1 General:
Maintain all equipment, tools, and machines used in the performance of this work in satisfactory working condition at all times to ensure a high-quality product.
335-4.2 Mixing Equipment:
Use a machine specifically designed and manufactured to place micro surfacing. Truck mounted and self-loading continuous machines are acceptable. Mix the material with an automatic-sequenced, self-propelled micro surfacing mixing machine. It shall be a continuous-flow mixing unit able to accurately deliver and proportion the mix components through a revolving multi-blade, double-shafted mixer and to discharge the mixed product on a continuous-flow basis. The machine shall have sufficient storage capacity for all mix components to maintain an adequate supply to the proportioning controls. Four truck mounted machines will be required for all projects or roads one half mile or less in length.
Self-loading continuous machines shall be capable of loading materials while continuing to lay micro surfacing, thereby minimizing construction joints. Two self-loading machines will be required on all projects or roads greater than one half mile in length.
Self-loading continuous machines shall be equipped to allow the operator to have full control of the forward and reverse speeds during applications of the micro surfacing material and shall be equipped with opposite-side driver stations to assist in alignment.
The self-loading device, opposite-side driver stations, and forward and reverse speed controls shall be original equipment-manufacturer design.
335-4.3 Proportioning Device:
Provide and properly mark individual volume or weight controls for proportioning each material to be added to the mix (i.e., aggregate, mineral filler, emulsified asphalt, additives, and water).
335-4.4 Spreading Equipment:
Agitate and spread the mixture uniformly in the spreader box by means of twin-shafted paddles or spiral augers fixed in the spreader box. Provide a front seal to ensure no loss of the mixture at the road contact point. The rear seal shall act as a final strike-off and shall be adjustable. The spreader box and rear strike-off shall be so designed and operated that a uniform consistency is achieved and a free flow of material is provided to the rear strike-off. The spreader box shall have suitable means to hydraulically adjust the box width automatically while traveling behind the mixing unit, and be able to side shift the box to compensate for variations in the pavement geometry.
335-4.4.1 Secondary Strike-off:
Provide a secondary strike-off to improve surface texture. The secondary strike-off shall have the same adjustments as the spreader box. No burlap drags will be permitted on the final applications.
335-4.4.2 Rut-filling Equipment:
When required by the Contract Documents, micro surfacing material may be used to fill ruts, utility cuts, depressions in the existing surface, etc. When rutting or deformation is less than 1/2 inch, a full width scratch course may be applied with the spreader box using a metal or stiff rubber strike-off. Ruts of 1/2 inch or greater in depth shall be filled independently with a rut-filling box, either five or six feet in width. Ruts that are in excess of 1 1/2 inch in depth may require multiple applications with the rut-filling box to restore the cross-section.
When a rut box is used, emulsified asphalt content may be reduced by 0.5% of the mix design target. Any reduction of emulsified asphalt content must be within the tolerance of the job mix formulation listed in the mix design. Material placed with the rut-filling box shall have a 1/4 inch crown to allow for traffic consolidation. Before placing subsequent lifts, allow all rut-filling material to cure under traffic for at least 24 hours.
335-4.5 Auxiliary Equipment:
Provide suitable surface preparation equipment, traffic control equipment, hand tools, and any other support and safety equipment necessary to perform the work.
335-5 Calibration.
Calibrate each mixing unit to be used in the performance of the work in the presence of the Engineer prior to the start of construction. Previous calibration documentation covering the exact materials to be used may be acceptable, provided that no more than 60 days have lapsed. Document the individual calibration of each material at various settings, which can be related to the machine metering devices. Do not utilize any mixing unit on the project until the calibration has been completed and approved by the
Engineer. Any component replacement affecting material proportioning requires that the machine be recalibrated. No machine will be allowed to work on the project until the calibration has been completed and accepted.
335-6 Weather Limitations.
Do not apply micro surfacing if either the pavement or air temperature is below 50°F. Do not apply micro surfacing when there is the possibility that the finished product will freeze within 24 hours. Do not apply micro surfacing in the rain or when there is standing water on the pavement. The mixture shall not be applied when weather conditions prevent opening to traffic within a reasonable amount of time, as determined by the Engineer.
335-7 Surface Preparation.
335-7.1 General:
Remove any thermoplastic striping materials and retro-reflective pavement markers in the areas to be micro surfaced. Provide temporary striping as necessary to comply with Contract Documents. Immediately prior to applying the micro surfacing, clear the surface of all loose material, silt spots, vegetation, and other material that will negatively affect the quality of the micro surfacing, utilizing any standard cleaning method. If water is used for cleaning, allow any unsealed cracks to dry thoroughly before applying micro surfacing. Protect manholes, valve boxes, drop inlets and other service entrances from the micro surfacing mixture by a suitable method. The Engineer will approve the surface preparation prior to micro surfacing. No loose aggregate, either spilled from the lay-down machine or existing on the road, will be permitted.
335-7.2 Cracks:
Pre-treat any cracks in the surface of the pavement with a crack filler meeting the requirements of FDOT Developmental Specification Section 305 prior to the application of the micro surfacing. Fill any cracks with a width greater than 1/4 inch. Do not overfill the cracks. Crack filling material must cure for a minimum of 30 days prior to application of the micro surfacing.
335-7.3 Rumble Strips:
Where shoulders are not to be micro surfaced, prevent material from being applied to or entering any rumble strip depressions. If necessary, remove any material that enters the depressions. When rumble strips are to be micro surfaced, place a scratch course to fill the depressions prior to placing the final surface course.
335-7.4 Tack Coat:
Place a tack coat on all collector roads prior to constructing a micro surfacing course. A tack coat is not required on residential roads or between the leveling (scratch) course and the surface course provided the surface course is placed within 30 days of the leveling (scratch) course. If required, the tack coat should be type SS, type CSS, or the micro surfacing emulsified asphalt. It may consist of one part emulsified asphalt to three parts water and should be applied with a standard distributor. The distributor shall be capable of applying the tack evenly at a rate of 0.05-0.15 gal/yd2.
335-8 Application.
335-8.1 General:
Pre-wet the surface by fogging ahead of the spreader box with water. Adjust the rate of application of the fog spray to suit temperatures, surface texture, humidity, and dryness of the pavement.
The micro surfacing shall be of the desired consistency upon leaving the mixer. Carry a sufficient amount of material in all parts of the spreader box at all times so that complete coverage is obtained. Avoid overloading of the spreader box. Do not allow lumping, balling, or unmixed aggregate in the micro surfacing mixture.
Do not leave streaks, such as those caused by oversized aggregate, in the finished surface.
If excess streaking develops, stop production until the situation has been corrected.
Excessive streaking is defined as more than four drag marks greater than 1/2 inch wide and 4 inches long, or 1 inch wide and 3 inches long, in any 30 yd2 area. Do not permit transverse ripples or longitudinal streaks of 1/4 inch in depth or greater, when measured by placing a 10-foot straight edge over the surface.
335-8.2 Rate of Application.
The average application rate shall be in accordance with Table 335-6, unless otherwise specified in the Contract Documents. Full width application rates must be maintained within ± 2 lbs/yd2 of the specified rate. Application rates are based upon the weight of dry aggregate in the mixture. The maximum thickness of any single layer of micro surfacing at the edge of the pavement shall be 1/4 inch.
Table 335-6 Application Rates
AGGREGATE
TYPE
LOCATION APPLICATION RATE(1)
Type II
Collectors, Local Roads, and Airport
Runways
Single Application:
20-24 lbs/yd2
Double Application (two lifts):
Bottom: 14-18 lbs/yd2
Top: 16-20 lbs/yd2 Total: 30-34 lbs/yd2
Scratch or Leveling Course
As Required --- 12 lb/yd2 (minimum)
(1) Application rates are based upon the weight of dry aggregate in the mixture.
335-8.3 Joints:
Prevent excessive buildup, uncovered areas, or unsightly appearance on longitudinal and transverse joints. Provide suitable-width spreading equipment to produce a minimum number of longitudinal joints throughout the project. Place longitudinal joints on lane lines, where possible. Use half passes and odd-width passes only when absolutely necessary. Do not apply a half pass as the last pass of any area. Do not overlap longitudinal lane line joints by more than three inches. Do not construct joints having more than a 1/4 inch difference in elevation when measured by placing a 10-foot straight edge over the joint and measuring the elevation drop-off. Construct longitudinal joints so that water is not held at the joint. Construct transverse joints at the beginning and end project limits so that the elevation difference between the micro surfacing and the adjacent pavement does not exceed 1/4 inch.
335-8.4 Mix Stability:
Produce a micro surfacing mixture that possesses sufficient stability so that premature breaking of the material in the spreader box does not occur. The mixture shall be homogeneous during and following mixing and spreading. The mixture shall be free of excess water or emulsified asphalt and free of segregation of the emulsified asphalt and aggregate fines from the coarser aggregate. Do not spray water directly into the spreader box while applying micro surfacing material under any circumstances.
335-8.5 Handwork:
Utilize hand squeegees to provide complete and uniform coverage of micro surfaced areas that cannot be reached with the mixing machine. Lightly dampen the area to be hand worked prior to mix placement, if necessary. Care shall be exercised to leave no unsightly appearance from handwork. When performing handwork, provide the same type of finish as that applied by the spreader box.
335-8.6 Lines:
Construct straight lines along curbs and shoulders. Do not permit runoff on these areas.
Keep lines at intersections straight to provide a good appearance. If necessary, utilize a suitable material to mask off the end of streets to provide straight lines. Edge lines shall not vary by more than 2 inches horizontally.
335-8.7 Cleanup:
Remove micro surfacing mixture from all areas such as manholes, gutters, drainage structures, rumble strips, and as otherwise specified by the Engineer. On a daily basis, remove any debris resulting from the performance of the work.
335-8.8 Post Sweeping:
If required by the Engineer, broom the surface of any loose material within 48 hours after the completion of the micro surfacing. If directed by the Engineer, perform this operation again approximately seven to ten days after completion of the micro surfacing as needed.
Additionally, clean the surface, as necessary, prior to application of the final pavement markings.
335-9 Quality Assurance.
335-9.1 Material Monitoring:
Provide a computerized material monitoring system with integrated material control devices that are readily accessible and positioned so the amount of each material used can be determined at any time. Ensure the computer system is functional at the beginning of work and during each calibration. Provide a back-up electronic materials counter that is capable of recording running count totals for each material being monitored. Equip the mixer with a radar ground measuring device. The computer system shall have the capability to record, display and print the following information:
1. Individual sensor counts for emulsion, aggregate, cement, water, and additive.
2. Aggregate, emulsion, and cement output in pounds per minute.
3. Ground travel distance.
4. Spread rate in pounds per square yard.
5. Percentages of emulsion, cement, water, and additive.
6. Cumulative totals of aggregate, emulsion, cement, water, and Additive.
7. Scale factor for all materials.
335-9.2 Sampling and Testing:
The Engineer shall obtain one sample of micro-surfacing mixture each day of production.
The Engineer shall test each sample in accordance with FM 5-563 and FM 1-T 030 to determine the residual asphalt content and the gradation of the sample. Evaporate all water from the sample prior to testing. Determine the deviation of the test results for each sample from the mix design target values. Compare the deviation from the mix design to the mixture control tolerances shown in Table 335-7.
Table 335-7 Aggregate and Emulsified Asphalt - Acceptance Limits
Aggregate Tolerance from Mix Design Target Values
Percent Passing No. 4 Sieve ± 6 percent Percent Passing No. 8 Sieve ± 7 percent Percent Passing No. 50 Sieve ± 6 percent Percent Passing No. 200 Sieve ± 3.0 percent
Emulsified Asphalt Residual Asphalt Content of Mixture
± 0.6 percent
335-9.3 Application Rate:
Control the application rate for micro surfacing on a lot basis to within the “Total” range specified in 335-6. A lot will be considered as 0.10 lane miles. No additional compensation will be paid for micro surfacing application rates placed in excess of the “Total” specified range. The unit price for each deficient lot will be reduced by ten percent for each lb/yd2 rate less than the “Total” specified range. For application rates outside the “Total” specified range, stop production of the mixture and make adjustments to correct the problem to the satisfaction of the Engineer prior to resuming production.
Accept a pay reduction for deficient lot production or overlay the deficient area at full plan width and depth at no additional cost.
335-9.4 Experience:
All contractors and their subcontractors shall be FDOT prequalified in the work classes of flexible paving and hot plant–mixed bitum. courses. Bidders must submit with the bid a minimum of five (5) Micro-surfacing project references from a City or County in the State of Florida, that have been completed within the past two (2) years. Minimum experience requirement must be met by the Prime Bidder and not the proposed sub-contractor for this project. Bidders are required to submit detailed information: indicating the project date, number of square yards treated in each and phone number of the government official in charge of each project. Contractor shall be capable of meeting all the requirements of this specification at the time of the bid. The contractor shall have in their possession, in the State of Florida at the time of bidding, four (4) micro-surface truck mounted machines and two (2) self-loading machines as described in the equipment section of the specification. Staff shall have the option to inspect the Contractor’s equipment and if found deficient, it shall be the basis for rejection of Contractor’s bid.
335-10 Basis of Payment.
335-10.1 General:
The micro surfacing shall be paid for at the Contract unit price per square yard, completed and accepted. Such price and payment shall be full compensation for performing all micro surfacing work included in this section, and shall include the cost of all materials, including the cost of the emulsified asphalt and aggregate. Crack sealing, if required, shall be paid for under the appropriate pay item.
335-10.2 Payment Items:
Payment will be made under:
Item No. 335-1 Micro surfacing Per square yard Item No. 335-2 Rut fill/scratch course Per ton
Warranty:
The Contractor shall provide the City or County upon final acceptance of the micro surfacing work, a warranty period of three (3) years which shall include all labor, materials, hauling, traffic control and striping to repair the defective areas. Defective areas shall include debonding/delamination, bleeding, excessive raveling and aggregate loss exposing the old roadway surface. The Contractor shall perform all warranty work at no cost to the City or County.
MICRO SURFACING.