This technical specifications document outlines the requirements for the ESB La Grande Maintenance Station Wash Bay Overhead Door Replacement project, a facility infrastructure upgrade undertaken by the State of Oregon. The project involves the comprehensive removal and replacement of two existing 14' x 14' overhead doors, gutters, siding, liner panels, track, and operator systems, with new rough openings widened to 16' x 13'-9". The base bid scope includes temporary structural support of trusses, installation of new glulam beams and framing per engineering specifications, new plywood sheeting with house wrap, custom cee jamb wraps, new siding and liner panels matching existing profiles and colors, and reinstallation of existing corner metal and gutters. The Request for Competitive Quote (RFCQ) was posted on March 20, 2025, with a submission deadline of April 8, 2025. Contractors must review the complete technical specifications and drawings (Exhibit 1 and Exhibit 2) to prepare comprehensive responses.

The base bid includes installation of two new ThermaSeal TM200 Commercial Raynor overhead doors (or approved equal) with stucco surface texture, white 2" thick insulated sections with R18.3 polyurethane foam, full view aluminum windows, and commercial Raynor COH411 operators with ControlHoist 2.0 gear drive systems. The specifications require 3" car wash rollers with stainless steel stems, normal headroom with 3" track and 15" radius, waterproof NEMA-4 rated components, Lift Master receivers, and multiple remotes. Two add alternate specifications are included: Add Alternate 1 provides for replacement of four sealed LED fixtures with new fixtures and EMT surface-mounted conduit ($1 est.), and Add Alternate 2 provides for installation of new 26-gauge metal ceiling liner panels with J-trim and 2 x 12 backing at eight locations. All proposed materials must be designed to mitigate salt corrosion given the wash bay's consistent exposure to salt. The contractor is responsible for all design, engineering, permitting, and coordination with the City of La Grande and ODOT project managers throughout plan review and construction. Prior to construction, ODOT project managers must review and approve all plans. Electrical work for LED installation must be performed by a licensed electrician.

View the file

Other files

File Type Posted
00013172 Preliminary Results.xlsx XLSX spreadsheet
ESB_RFCQ_Attachments_279C.Revised.docx DOCX document
00013172 Intent To Award.xlsx XLSX spreadsheet
Exhibit 2 Drawings.pdf PDF
Exhibit 1 Technical Specifications.Revised.doc DOC document
PrebidMeetingTopics.doc DOC document
Competitive Quote Pricing Form~3.xlsx XLSX spreadsheet
ESB_RFCQ_Attachments_279C.Final.docx DOCX document
PrebidSignInRoster.pdf PDF
256015 Notice Intent to Award.pdf PDF
Competitive Quote Pricing Form Revised.xlsx XLSX spreadsheet
ESB_RFCQ_279C.Final.docx DOCX document
Addendum 1~17.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 1 – TECHNICAL SPECIFICATIONS

ESB LAGRANDE MAINTENANCE OVERHEAD DOOR REPLACEMENT

PROJECT INFORMATION AND SPECIFICATIONS

Brand Name used in Specifications:

Any brand name listed in the specifications as “equivalent” or “equal” shall establish minimum requirements for quality, durability, function, etc. Other brands may be offered that are equal to or better than the brand named in the specifications.

Project Description:

The La Grande Maintenance Station wash bay doors are undersized and have experienced significant wear and tear over the years. This project includes removing the existing gutters, siding, liner panel, overhead door, track, and operator to widen the rough openings for the overhead doors. Contractor must provide design, engineering, and installation of a new 16’ x 13’9” overhead door per specifications. Contractor is also responsible to work with city of La Grande throughout plan review and the construction process; contractor must also apply and pay for any permit or review required by the AHJ. Proposed materials must mitigate salt corrosion, as the wash bay is consistently exposed to salt. Prior to construction, ODOT project managers need to review and approve plans.

Base Bid: Remove and dispose of two existing 14'x14' overhead doors, reframe end walls for installation of two new 16'x14' overhead doors, supply and install new overhead doors

· Two (2) overhead doors to be replaced and walls reframed per engineering:

· Temporarily support trusses with post and beam shoring.

· Install new glulam beam, double trimmers, hold downs, etc. per engineering.

· New overhead door rough openings: 16’-0” x 13’-9”.

· ¾” plywood sheeting, interior and exterior with house wrap.

· Custom cee jamb wrap, white, 24ga, no splices preferred.

· New J-trim, interior and exterior, no splices preferred.

· Install new siding at exterior and liner panel at interior walls.

· 24 gauge, match existing profile and colors.

· Reinstall existing outside corner metal, gutters, & downspouts.

· 16’-2” x 13’-9” ThermaSeal (TM200) Commercial Raynor Garage Door or approved equal.

· Stucco surface texture, white

· 2” thick sections.

· 26ga, insulated w/R18.3 Polyurethane foam.

· 2 rows of 4 aluminum full view windows in sections #3 and #4.

· Double end stiles, struts, seals, & pusher bumpers.

· Normal headroom, 3” track, 15” radius

· 3” car wash rollers, sealed nylon roller, stainless steel 7-1/4” stem.

· Commercial Raynor Operator COH411 or approved equal

· ControlHoist2.0, gear drive

· Waterproof NEMA-4

· Lift Master receiver and (7) remotes, N12 inside 3-button

· N4 outside 3-button opener – Remove existing surface mounter conduit and stub out wire in new wall prior to cover.

· NEMA-4 photo eyes

Add Alternate Specifications:

Add Alternate 1: Replace four existing sealed LED fixtures with similar new LED fixtures, provide EMT surface mounted conduit for any new wiring.

· Add 4 new sealed LED light fixtures to wash-bay.

· Match existing sealed LED fixtures or similar

· Provide EMT surface mounted conduit for any new wiring.

· Electrical work shall be done by a licensed electrician.

Add Alternate 2: Provide and install new metal liner panel on ceiling of wash-bay

· Ceiling panels can be 26 gauge, ¾” rib height, & white in color.

· Install J trim around perimeter

· Install 2 X 12 backing at the 8 locations for the overhead wash system prior to cover.

Revision: 5/7/24