Technical Inspection Guidelines for Fire Life and Safety Systems - City of Phoenix
This document constitutes Exhibit 1 to the City of Phoenix's Fire Life and Safety Systems Inspections, Testing and Repair contract, establishing comprehensive technical inspection guidelines for the contractor to perform system testing and inspections throughout the five-year contract term commencing January 1, 2027. The scope encompasses fiber optic annual inspections, automatic gate annual inspections, VESDA annual inspections, pre-action dry system inspections, fire alarm system annual inspections, and fire sprinkler system inspections, with all work performed in accordance with current NFPA standards, International Phoenix Fire Code (IPFC), NEC, UL, ASTM standards, and manufacturer guidelines. For fiber optic inspections, the contractor must conduct visual pathway and enclosure inspections, optical testing using Optical Loss Test Sets (OLTS) and Optical Time Domain Reflectometer (OTDR) analysis, connector cleanliness verification, pathway survivability testing, and grounding compliance verification. Automatic gate inspections require asset identification, environmental risk assessment, component documentation, pass/fail checklists against UL 325 and ASTM F2200 standards, corrective action planning, and photo documentation. VESDA inspections mandate sensitivity calibration testing, aspiration and airflow verification, filter replacement, pipe network integrity inspection, power supply testing, and fault annunciation verification. Pre-action system inspections include annual partial trip tests, gauge reading documentation, waterflow and valve alarm testing, control valve verification, air compressor inspection, safety valve testing, leak checks, and fire department connection inspection, with full-flow trip testing required triennially.
The technical guidelines establish detailed testing protocols and compliance standards without specifying pricing terms, payment structures, or funding sources within this exhibit. The contract operates under the City of Phoenix's Public Transit Department Disadvantaged Business Enterprise-Neutral (DBE-N) program, governing small business participation on FTA-assisted work under 49 CFR Part 26, requiring contractors to submit annual Small Business Participation Plans and monthly participation logs. Personnel performing work must hold NICET Level II, CSA Level II, or manufacturer-specific certifications, with backflow testing restricted to City-approved or ADEQ-certified testers and gas and special hazards work requiring five years of documented experience. Contractors must deliver comprehensive reports including asset identification, photographs, pass/fail checklists, and corrective action plans, notify the City's FLSC of system deficiencies, obtain authorization before repairs, and remain onsite until systems achieve full operational status. The work is performed at Phoenix Sky Harbor International Airport, Phoenix Deer Valley Airport, and Phoenix Goodyear Airport under Aviation Department supplemental terms requiring Title VI compliance, ADA/Section 504 adherence, employment verification, equal employment requirements, and heat illness prevention compliance, with no billable work authorized until the contractor receives a purchase order or contract documents.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1: TECHNICAL INSPECTION GUIDELINES
Rev 1, 11.20.26
Contractor shall comply with the system testing and inspection requirements identified in this Exhibit. All testing, inspection, maintenance, and related services shall be performed in accordance with the most current applicable NFPA standards, International Phoenix Fire Code (IPFC), NEC, UL and ASTM standards, manufacturer guidelines, and other applicable adopted codes and requirements. Contractor shall remain responsible for compliance with all applicable requirements throughout the term of the Contract.
1. FIBER OPTIC ANNUAL INSPECTION
All multi-mode fiber optic inspection for a fire alarm shall comply with IEC 61280-4-1 (Tier-1 IL testing), IEC 61300-3-35 (End-face inspection), ANSI/TIA-568.3-D (Performance compliance), NFPA 72 Chapter 14 (Inspection, Testing, and Maintenance) and manufactures requirements.
1.1. Visual Inspection (NFPA 72 Chapter 14)
1.1.1. Pathways: Verify fiber cables are dedicated, properly labeled, and structurally supported every 4 to 5 feet.
1.1.2. Enclosures: Check that splice trays, patch panels, and fiber distribution units are locked and free of dust.
1.1.3. Bend Radius: Ensure no cable violates the minimum dynamic or static bend radius (typically 10x to 20x cable diameter).
1.1.4. Fire-Stopping: Inspect all wall and floor penetrations to ensure intumescent fire-stop materials are intact.
1.2. Optical Testing & Diagnostics
1.2.1. Insertion Loss: Measure total optical attenuation using an Optical Loss Test Set (OLTS) to ensure it stays within the engineered decibel (dB) loss budget.
1.2.2. OTDR Analysis: Run an Optical Time Domain Reflectometer (OTDR) trace to locate macrobends, microbends, or structural stresses before they cause a circuit fault.
1.2.3. Connector Cleanliness: Inspect all fiber end-faces with a video probe per TIA/ISO 61300-
3-35 to ensure zero contamination in the optical core.
1.3. Pathway Survivability & Integrity (NFPA 72 Chapter 12)
1.3.1. Class Designation: Verify the fiber loop maintains its designated integrity (e.g., Class A loops must function despite a single open/break).
1.3.2. Survival Rating: Ensure fiber circuits spanning multiple fire zones meet required 1-hour or
2-hour fire-resistance ratings.
1.3.3. Fault Monitoring: Confirm that the fire alarm control panel (FACP) immediately triggers a trouble signal within 200 seconds of a fiber break or optical power drop.
1.4. Grounding & Power Compliance
1.4.1. Armored Fiber: Test that metallic armor or strength members are properly bonded to the grounding system per NEC 770.100.
1.4.2. Composite Cables: If the fiber shares a jacket with copper power conductors (Class 3 circuits), verify insulation integrity and voltage limits.
2. AUTOMATIC GATES ANNUAL INSPECTION
All automatic gate inspections shall comply with PFC, IBC, UL 325, OSHA 29 CFR 1910.217, NFPA 72, and manufactures requirements.
2.1. Asset Identification: Log the gate location, operator manufacturer, model number, serial number, and confirmed UL 325 Class rating (III or IV).
2.2. Environmental Risk Assessment: Document the surrounding terrain, visibility from control stations, and proximity to pedestrian walkways.
2.3. Component Ledger: Itemize every safety device (e.g., photo-eyes, edge sensors) with its model and exact monitoring type.
2.4. Pass/Fail Checklist: Include a line-by-line breakdown of the UL 325 and ASTM F2200 requirements listed above, marked as Pass, Fail, or N/A.
2.5. Corrective Action Plan: Detail a deficiency list for any failed items, specifying if the gate must be locked out until repaired.
2.6. Photo Documentation: Take clear, date-stamped photos of all posted warning signs, roller guards, positive stops, and the manufacturer's data plate.
3. VESDA ANNUAL INSPECTION
All VESDA inspections shall comply with PFC, NFPA 72 and manufactures requirements.
3.1. Sensitivity & Calibration Testing: Perform a system functional test using an approved aerosol smoke or calibrated test gas at the furthest sampling hole to verify the detector responds correctly to smoke and activates the alarm relays.
3.2. Aspiration & Airflow Verification: Measure airflow across all sampling pipes using a digital manometer (e.g., Magnehelic gauge) to check that the transport time and pressure are within the manufacturer’s baseline design parameters.
3.3. Filter Replacement: Replace the primary air filter. In dirtier environments, filters may need to be replaced on a semi-annual basis.
3.4. Pipe Network & Hole Integrity: Inspect accessible pipe networks. Verify that all pipes are securely supported and sampling holes are unobstructed. A backflush (clearing lines with compressed air or a reversible vacuum) is often performed to blow out any dust.
3.5. Power Supply Test: Test the primary power supply and verify standby battery capacity (including the charger) to ensure the system will run for 24 hours under standby and 5 minutes under alarm conditions.
3.6. Fault & Annunciation Checks: Verify that all fault signals (airflow faults, aspirator faults, power faults, and filter faults) properly transmit signals to the fire alarm control panel and central monitoring station.
3.7. Manufacturer Guidelines: Xtralis (the manufacturer of VESDA) provides specific Maintenance Guides that detail the required testing tools (e.g., LCD programmer, Safe Guard Aerosol) and exact parameter thresholds.
4. PRE-ACTION SYSTEMS DRY
All Pre-Action System inspections shall comply with PFC, NFPA 13, 25, and manufactures requirements.
4.1. Annually (Q3): Complete a partial trip test. Full-system visual inspections, exercise control valves, inspect low-point drains, and conduct a partial trip test of the valve (changing state from air to water without filling the entire pipe network)
4.2. Gauges: Inspect and record readings on air/nitrogen pressure and water supply pressure gauges to ensure normal operating ranges.
4.3. Waterflow and Valve Alarms: Test mechanical water motor gongs, vane-type waterflow devices, and pressure switches to verify they send signals to the fire alarm panel and off-site monitoring station.
4.4. Control Valves: Verify that all control valves are locked, sealed, or electrically supervised in the correct position (open/closed) and free from physical damage.
4.5. Detection Devices: Ensure that releasing/detection circuits and devices are functional.
4.6. Air Compressors: Visually inspect to ensure the unit is plugged in, powered, and functioning to maintain supervisory air.
4.7. Oil Level: Check the oil level. If lubricated, change the oil at least annually.
4.8. Belts and Filters: Inspect drive belts for wear and check tension (should not have more than 1/2-inch of deflection). Clean or replace the air intake filter.
4.9. Safety Valve: Manually test the safety relief valve to ensure it pops off and resets properly.
4.10. Leak Check: Inspect all air lines, fittings, and the check valve for air leaks.
4.11. Alarm Verification: Ensure that the low-air alarm correctly signals the building Fire Alarm Panel.
4.12. Fire Department Connections (FDC): Visually check FDCs to ensure caps are in place, swivel connections turn freely, and the interior is free of debris.
4.13. Main Drain Test: Conduct a main drain flow test on the system riser to verify water supply pressure and ensure there is no blockage or closed valve in the supply line.
4.14. Partial Valve Trip Test: Perform a partial trip test of the pre-action valve to ensure it opens properly upon receiving a signal (Note: A full trip test is required annually)
4.15. Every three years (and immediately following any major system alteration): a full-flow trip test is strictly mandated.
5. FIRE ALARM SYSTEMS:
All fire alarm inspections shall comply with PFC, NFPA 72, manufactures requirements, and NFPA 25 where applicable.
5.1. Provide annual fire alarm and supervisory system test, inspection and reports for all panels, notification appliances, initiation devices, auxiliary devices, and control systems including all fire dampers serving all locations covered under this contract. Tests include, but are not limited to:
5.1.1. Test complete systems for grounded, open, and shorted circuits.
5.1.2. Test all alarm-initiating device for functions specified, and for the required alarm actions.
5.1.3. Test of the system for electrical supervision.
5.1.4. Test to verify that alarm signals will operate under specified trouble conditions.
5.1.5. Test to verify that the system will operate under specified trouble conditions.
5.1.6. Test to verify that the system will perform all specified tasks.
5.1.7. Test to verify that all required system actions function properly.
5.1.8. Test to ensure the alarm system transmits the appropriate signal to the alarm room in accordance with current PFC.
5.1.9. When performing fire alarm inspections, the Contractor may request that WSD provide an elevator contractor. This request shall be given to the FLSC five days in advance of the inspection.
5.2. Repair any deficiencies noted during the test and inspection within the timeframe allowed by Code.
6. FIRE SPRINKLER SYSTEMS:
All fire sprinkler inspections shall comply with PFC, NFPA 13,14, 25, manufactures requirements, and NFPA 72 where applicable.
6.1. Control Valves (OS&Y, PIV, Butterfly Valves)
Purpose: Ensure valves are open, supervised, and operable.
6.1.1. Verify valve is in the open position by visually confirming stem position or indicator plate.
6.1.2. Check valve supervision (tamper switches) for proper signal transmission.
6.1.3. Operate valve through full range if required for annual ITM.
6.1.4. Verify no leaks at packing, body, or connections.
6.2. Waterflow Alarm Devices (Vane/Paddle Switches, Pressure Switches)
Purpose: Confirm fire alarm activation upon water flow.
6.2.1. Initiate waterflow using inspector’s test valve or by flowing water through the system.
6.2.2. Confirm the alarm activates within the required time delay (typically <90 seconds per NFPA
6.2.3. but verify per specific system).
6.2.4. Verify signal reaches the fire alarm panel and monitoring service.
6.2.5. Reset the system and ensure alarms clear properly.
6.3. Gauges (System and Riser Gauges)
Purpose: Ensure pressures are correct for system type.
6.3.1. Read system gauge and confirm proper operating pressure.
6.3.2. Replace gauges older than 5 years or those showing damage/inaccuracy.
6.3.3. Compare main drain test results to previous year to confirm supply stability.
6.4. Piping & Fittings
Purpose: Detect signs of corrosion, mechanical damage, or leakage.
6.4.1. Walk all accessible piping and visually inspect for:
6.4.1.1. Corrosion
6.4.1.2. Mechanical damage
6.4.1.3. Leaks or staining
6.4.2. Verify hangers and seismic bracing are intact.
6.5. Fire Department Connection (FDC)
Purpose: Ensure firefighters can supply the system.
6.5.1. Verify caps or plugs are present, threads undamaged, and swivels rotate freely.
6.5.2. Check check-valve integrity (prevent backflow).
6.5.3. Ensure FDC signage is present and visible.
6.5.4. Confirm pathway from FDC to fire lane is accessible.
6.6. Main Drain Test
Purpose: Confirm the water supply performance is consistent year-to-year.
6.6.1. Fully open the main drain valve.
6.6.2. Record residual pressure.
6.6.3. Compare with previous annual test values to identify restrictions or supply issues.
6.6.4. Close valve slowly and verify pressure returns to static.
6.7. Sprinkler Heads (All Types)
Purpose: Ensure sprinklers are unobstructed, undamaged, and within service life limits.
6.7.1. Inspect heads for paint, corrosion, loading (dust), mechanical damage.
6.7.2. Verify correct spacing, orientation, and temperature rating.
6.7.3. For standard-response heads:
6.7.4. Test at 50 years, then every 10 years after.
6.7.5. Replace heads that fail or any visibly damaged/corroded ones.
6.8. Supervisory Devices (Tamper, Pressure, Water Level Switches)
Purpose: Ensure correct supervisory notifications.
6.8.1. Operate each supervisory device according to manufacturer and NFPA 25.
6.8.2. Confirm supervisory signals appear correctly at the panel.
6.8.3. Reset devices and verify normal status.
6.9. Standpipes (If Part of System)
Purpose: Confirm firefighter hose connections are functional.
6.9.1. Flow test standpipe outlets to verify pressure and volume.
6.9.2. Perform 5-year hydrostatic testing of PRVs and standpipe system.
6.9.3. Confirm caps, threads, and valves are operational.
6.10. Monitoring System / Fire Alarm Interface
Purpose: Ensure sprinkler system integrates correctly with the fire alarm system.
6.10.1. Activate one waterflow zone and one supervisory zone.
6.10.2. Confirm transmittal to supervising station.
6.10.3. Check panel reset and silence functions
7. Quarterly
7.1. Perform Waterflow Alarm Test. This is the primary quarterly test for wet systems.
7.1.1. Locate the Inspector’s Test Connection on the most remote branch line.
7.1.2. Ensure the drain is directed to a safe discharge location.
7.1.3. Slowly open the test connection valve fully.
7.1.4. Observe the waterflow alarm (mechanical gong or electric alarm):
7.1.4.1. Alarm should activate within 5 minutes (typically much faster).
7.1.5. Verify alarm signal is received by:
7.1.5.1. Local audible/visual devices, and
7.1.5.2. Monitoring company (if system is monitored).
7.1.6. Close the test valve slowly to avoid water hammer.
7.1.7. Ensure the waterflow switch resets automatically.
7.2. Inspect the Fire Department Connection (FDC)
NFPA 25 requires quarterly visual inspection of all FDC components.
7.2.1. Verify caps or plugs are in place and undamaged.
7.2.2. Check that swivels rotate freely; lubricate if needed.
7.2.3. Ensure threads are clean and compatible.
7.2.4. Look into the FDC for debris or obstructions.
7.2.5. Verify the check valve is holding back pressure (no leakage).
7.2.6. Confirm FDC is unobstructed and visible from fire apparatus access.
7.2.7. Check signage for clarity and correctness (e.g., “AUTO-SPRINKLER”).
7.3. Verify Hydraulic Design Information Sign (Nameplate)
This must be present and readable.
7.3.1. Locate the hydraulic nameplate on the riser.
7.3.2. Confirm it is:
7.3.2.1. Legible
7.3.2.2. Securely attached
7.3.2.3. Matches the installed system design (density/area, K-factor, etc.)
7.4. Riser & System Valve Area Walkthrough
(Quarterly visual inspection tasks near riser)
7.4.1. Inspect riser piping for:
7.4.1.1. Leaks
7.4.1.2. Corrosion
7.4.1.3. Physical damage
7.4.2. Confirm gauges are not physically damaged.
7.4.3. Verify that the alarm check valve trim piping is intact.
7.4.4. Ensure valves in the riser area are:
7.4.4.1. In the correct position
7.4.4.2. Properly supervised (tamper switch or locked/sealed)
7.5. Supervisory Signal Testing (If Applicable)
Some components are required quarterly when present.
7.5.1. Inspect tamper switches for proper mounting.
7.5.2. Operate the switch (if permitted) to ensure:
7.5.2.1. Supervisory signal activates at the panel
7.5.2.2. Monitoring company receives the signal
7.5.3. Reset the switch and confirm signal clears
8. SPECIAL HAZARD SYSTEM
All special hazard system inspections shall comply with PFC, NFPA 2001, and manufactures requirements, and NFPA 72 where applicable.
8.1. Annual Functional Test Requirements
NFPA 2001 requires a complete functional test of the system, including detection, control, release mechanisms, and enclosure integrity.
8.2. Detection & Control System Testing
Verify that the system activates correctly through its detection logic.
8.2.1. Test smoke and/or heat detectors for proper activation.
8.2.2. Confirm cross-zone detection where required (system should only release when both initiating detectors activate).
8.2.3. Verify the fire alarm control panel activates alarms, release circuits, visual indicators, and outputs.
8.2.4. Confirm manual pull stations, abort switches, and time delays function as designed.
8.3. Release & Actuation System Testing
Ensure the system can actually discharge when required.
8.3.1. Test the electric or pneumatic actuators that open agent cylinders (no actual discharge needed).
8.3.2. Confirm signal pathways between detector → control panel → releasing device are
8.3.3. functioning.
8.3.4. Confirm proper operation of solenoids, initiators, and pressure switches.
8.3.5. Verify all safety interlocks respond correctly.
8.4. Cylinder & Agent Supply Inspection
Confirm cylinders are in serviceable condition and contain adequate agent.
8.4.1. Weigh or pressure-check each cylinder to ensure the agent quantity is within allowable limits.
8.4.2. Inspect cylinders for damage, corrosion, or leaks.
8.4.3. Confirm valves, hoses, and discharge heads are intact and unobstructed.
8.4.4. Ensure cylinders remain properly secured and labeled.
8.5. Piping & Nozzle System Inspection
Ensure unobstructed agent delivery.
8.5.1. Inspect discharge piping for tightness, damage, or unauthorized modifications.
8.5.2. Confirm pipe supports and hangers are secure.
8.5.3. Inspect nozzles for cleanliness, correct orientation, and evidence of tampering.
8.5.4. Verify nozzles still align with the original hazard coverage area.
8.6. Annual Room Integrity Test
NFPA requires verifying that the protected enclosure can retain agent for at least 10 minutes, typically through a door fan (enclosure integrity) test.
8.6.1. Conduct a fan-driven pressurization/depressurization test.
8.6.2. Measure leakage and compare against design concentration retention time.
8.6.3. Seal penetrations (cable trays, ductwork, wall gaps) if retention is inadequate.
8.6.4. Confirm room layout changes haven’t compromised containment.
8.7. Documentation Review
The annual inspection must verify that the system still matches its approved design.
8.7.1. Review as-built drawings and compare to current room configuration.
8.7.2. Ensure ventilation, ceiling tiles, walls, openings, and equipment placement haven’t changed coverage requirements.
8.7.3. Update maintenance logs, inspection records, and deficiency reports.
8.8. Additional Annual Requirements
8.8.1. System Signage & Safety Devices
8.8.1.1. Verify hazard signs, discharge warning signs, and safety placards are posted.
8.8.1.2. Check audible/visual pre-discharge alarms.
8.8.1.3. Verify egress routes are unobstructed.
8.8.2. Monitoring & Supervisory Functions
8.8.2.1. Confirm low-pressure/low-weight supervisory switches are functional.
8.8.2.2. Confirm system trouble/disable signals transmit correctly to monitoring stations
9. SEMI-ANNUAL
9.1. Agent Storage Cylinders
9.1.1. Verify cylinders are in the correct location and securely fastened.
9.1.2. Check pressure gauges are in the normal (green) range.
9.1.3. Confirm agent weight or pressure is within acceptable tolerance (typically within ±5% of full charge).
9.1.4. Inspect for damage, corrosion, or leakage.
9.1.5. Ensure valves, hoses, and actuators are intact and unobstructed.
9.1.6. Check manifold connections for tightness and leaks.
9.2. Distribution Piping
9.2.1. Inspect piping for damage, disconnections, or unauthorized modifications.
9.2.2. Ensure all pipe supports and hangers are secure and undamaged.
9.2.3. Confirm no new obstructions interfere with discharge routing.
9.3. Nozzles
9.3.1. Ensure nozzle orifices are clean and free from blockage (dust, paint, debris).
9.3.2. Confirm nozzles are correctly oriented as per design drawings.
9.3.3. Verify room layout has not changed in a way that would alter nozzle coverage.
9.4. Detection System
9.4.1. Check that smoke/heat detectors are clean and unobstructed.
9.4.2. Verify detectors are properly located and nothing blocks coverage.
9.4.3. Confirm sensitivity and device condition remain within listed range.
9.4.4. Ensure wiring and connections are intact.
9.5. Control & Release Components
9.5.1. Visually inspect control panel indicators and wiring.
9.5.2. Verify releasing devices, actuators, and solenoids are properly connected.
9.5.3. Ensure manual release stations are accessible and undamaged.
9.5.4. Check safety pins, seals, and mechanical interlocks.
9.6. Enclosure Integrity (Visual Review)
While the full door-fan test is annual, semi-annual inspections require verifying no changes have compromised room integrity.
9.6.1. Look for new penetrations (cables, ducts, conduits) that are unsealed.
9.6.2. Ensure walls, ceiling, and floor openings are properly sealed.
9.7. System Documentation & Signage
Ensure all system labels, warnings, and safety signs are still posted and legible.
9.7.1. Verify current inspection records are updated.
10. FIRE BACKFLOW ASSEMBLIES
All fire backflow assemblies inspections shall comply with PFC, UPC, NFPA 25, manufactures requirements, and NFPA 72 where applicable.
10.1. Test 1 — Differential-Pressure Backflow Test
Purpose: Confirms assembly prevents reverse flow contamination.
10.1.1. Connect calibrated differential pressure gauge to test cocks.
10.1.2. Test Check Valve #1 – must hold minimum differential (typically ≥1 psi DC, ≥2 psi RP).
10.1.3. Test Check Valve #2 – verify required closure.
10.1.4. RP / RPDA devices: Verify the relief valve opens at correct differential pressure.
10.1.5. Record readings on the jurisdiction-approved form and submit to the purveyor.
Key Note: A building must complete this test even if NFPA 25 testing is done. These tests do not replace each other.
10.2. Test 2 — NFPA 25 Annual Forward-Flow Test
Purpose: Confirms hydraulic performance for sprinkler demand.
10.2.1. Flow water through the backflow assembly at full system demand, including hose allowance. Measure downstream pressures and ensure no excessive pressure loss.
10.2.2. Compare performance to manufacturers listed friction-loss expectations.
10.2.3. Document any deficiencies or restrictions.
11. FIRE DOORS
All fire door inspections shall comply with PFC, NFPA 80, manufactures requirements, and NFPA 72 where applicable.
11.1. Verify Door Label
11.1.1. Confirm labels are present, intact, and legible on the door and frame.
11.2. Check for Damage, Holes, or Field Modifications
11.2.1. Inspect the door and frame for:
11.2.1.1. No open holes
11.2.1.2. No breaks or deformities
11.2.1.3. No non-approved modifications that would void the fire rating
11.3. Inspect Glazing and Vision Panels
11.3.1. Ensure:
11.3.1.1. Glazing is intact, not cracked
11.3.1.2. Vision-light frames and beads are present and secured
11.4. Examine Hinges and Door Hardware
11.4.1. Check:
11.4.1.1. Hinges are secure with no missing fasteners
11.4.1.2. Hardware aligns properly and functions
11.4.1.3. No broken, loose, or missing parts
11.5. Verify Door Clearances
11.5.1. Measure door gaps:
11.5.1.1. Clearance under door: within NFPA 80 limits
11.5.1.2. Clearance at meeting edges and jambs: within code tolerances
11.6. Test the Self-Closing Device
11.6.1. Open the door fully, then release it.
11.6.2. Door must:
11.6.2.1. Close completely
11.6.2.2. Without slamming or failing to latch
11.6.2.3. In pairs: inactive leaf must close before active leaf (coordinator test)
11.7. Verify Latching Hardware
11.7.1. Ensure:
11.7.1.1. Latch engages automatically
11.7.1.2. No auxiliary hardware interferes with closing or latching
11.7.1.3. (e.g., kick-downs, wedges, hold-opens not part of a listed system)
11.8. Inspect Seals & Gasketing
11.8.1. Confirm:
11.8.1.1. Edge seals and gasketing are present (where required), undamaged, and continuous
11.9. Confirm Proper Signage
11.9.1. Verify:
11.9.1.1. Fire door signage is compliant
11.9.1.2. Signage is securely attached
11.9.1.3. Signage does not exceed size limits and does not damage the door
11.10. Check for Obstructions
11.10.1. Ensure:
11.10.1.1. Door swings freely
11.10.1.2. No storage or items block the door or impede closure
11.11. Inspect Coordinators (for paired doors)
11.11.1. Test sequential closing:
11.11.1.1. Inactive leaf must close first
11.11.1.2. Active leaf should latch properly after
11.12. Inspect Thresholds and Floor Conditions
11.12.1. Verify:
11.12.1.1. Threshold is secure, not damaged
11.12.1.2. No tripping hazards or obstructions that would affect door operation
11.13. Review Overall Assembly Condition
11.13.1. Ensure the entire door assembly—including frame, hardware, seals, glazing, hinges, anchors—is intact and undamaged.
11.14. Documentation (NFPA 80 REQUIRED)
11.14.1. Recordkeeping must include:
11.14.1.1. Door ID or location
11.14.1.2. Date of inspection
11.14.1.3. Inspector name/qualification
11.14.1.4. Each deficiency found
11.14.1.5. Repairs or corrective actions taken
11.14.1.6. Confirmation that door passed or failed
12. GRAVITY-OPERATED SMOKE/HEAT VENTS
All gravity-operated smoke/heat vents inspections shall comply with PFC, NFPA 204, manufactures requirements, and NFPA 72 where applicable.
12.1. Perform Annual Visual Inspection
12.1.1. Exterior and interior condition of vent covers
12.1.2. Cracks, deformation, corrosion, UV damage
12.1.3. Fasteners present and secure
12.1.4. Seal/weather stripping intact
12.1.5. No debris on or around the vent
12.1.6. Adjacent roof and flashing in good condition
12.2. Inspect Fusible Links
12.2.1. Verify fusible link is clean, not painted, not corroded
12.2.2. Ensure temperature rating label is legible
12.2.3. Replace immediately if:
12.2.3.1. Painted
12.2.3.2. Missing
12.2.3.3. Bent/damaged
12.2.3.4. Shows signs of heat exposure
12.3. Operate Manual Release Mechanism
NFPA 204 requires hands-on operation during annual maintenance.
12.3.1. Locate manual release cord/handle.
12.3.2. Pull firmly to activate drop-out mechanism.
12.3.3. Confirm the following occurs:
12.3.3.1. Latch releases smoothly
12.3.3.2. Vent doors drop or open fully without assistance
12.3.3.3. No binding, sticking, or partial opening
12.4. Inspect Opening Components After Activation
With vent open, examine:
12.4.1. Hinges / pivot points for corrosion or binding
12.4.2. Restraint cables for tension, fraying, or wear
12.4.3. Travel path of the doors to ensure no obstructions
12.4.4. Interior frame surfaces for deterioration
12.4.5. Correct issues before placing system back into service.
12.5. Reset and Verify Closure (If Applicable)
Some drop-out vents may require replacement of fusible link or re-arming mechanism.
12.5.1. Reinstall or re-secure fusible link (if resettable type)
12.5.2. Confirm door rests in proper closed position
12.5.3. Ensure link is not overly tightened and aligns correctly
13. STANDPIPE HOSE CABINETS
All standpipe hose cabinets inspections shall comply with PFC, NFPA 1/101,14, 25, manufactures requirements, and NFPA 72 where applicable.
13.1. Access & Cabinet Condition
13.1.1. Ensure the cabinet is readily accessible (not blocked).
13.1.2. Check cabinet door for:
13.1.3. Damage, corrosion, missing parts
13.1.4. Door opens freely, glazing intact
13.1.5. Verify cabinet signage is visible: “FIRE HOSE” or equivalent.
13.2. Hose Valve Inspection
13.2.1. Confirm valve is the correct type and properly mounted.
13.2.2. Inspect the 1½-inch or 2½-inch hose valve for:
13.2.2.1. No leaks
13.2.2.2. No corrosion
13.2.2.3. No physical damage
13.2.3. Ensure handwheel operates freely.
13.2.4. Check valve threads for wear or cross-thread damage.
13.2.5. Inspect valve cap and chain (if provided).
13.3. Hose Assembly Inspection (If Hose Present)
NFPA 25 still requires inspection even if the building uses pressure-reducing systems or Relies solely on FDC supply.
13.3.1. Open cabinet and inspect hose for:
13.3.2. Cuts, cracks, mildew, dry rot
13.3.3. Frayed or damaged jacket
13.3.4. Coupling damage
13.3.5. Ensure hose is properly racked / folded for quick deployment.
13.3.6. Verify nozzle is attached, unobstructed, and operable.
13.3.7. Annual Operational Testing of Hose Valve
13.3.8. NFPA 25 requires annual operational testing of the standpipe hose connection.
13.3.9. Slowly open the hose valve.
13.3.10. Ensure smooth opening and closing (no binding).
13.3.11. Confirm there are no leaks at valve stem or outlet.
13.3.12. Close valve fully and confirm it seats properly.
13.3.13. Cabinet Interior & Hardware Check
13.3.14. Inspect shelves, brackets, hose pins, and hardware for:
13.3.14.1. Rust
13.3.14.2. Loose fasteners
13.3.14.3. Broken or missing components
13.3.15. Verify hose, valve, and nozzle are secured properly and not resting on sharp or abrasive surfaces.
13.4. System Piping Inspection
13.4.1. Inspect visible piping feeding the hose valve.
13.4.2. Look for leaks, corrosion, mechanical damage, missing hangers, or vibration.
13.4.3. Ensure piping is protected from freezing (if applicable).
13.5. Main Drain / Pressure Verification
13.5.1. Inspect visible piping feeding the hose valve.
13.5.2. Look for leaks, corrosion, mechanical damage, missing hangers, or vibration.
13.5.3. Ensure piping is protected from freezing (if applicable).
14. CHLORINE SYSTEM NNUAL INSPECTIONS
14.1. Chlorine inspections
14.1.1. Will only be used a fact witness.
14.1.2. The WSD I&C and O&M techs will conduct the bump test activating chlorine sensors for low, high-level alarms.
14.1.3. Primary and secondary scrubbers, pull stations, and chlorine horn/strobes will be tested.
14.1.4. All chlorine functions will be tested.
14.1.5. Contractor will tag chlorine sensor, document all control functions and deficiencies.
14.1.6. Contractor will send electronic reports to the Fire Marshals office.
15. GAS SYSTEMS
All gas systems inspections shall comply with PFC, NFPA 820, and manufactures requirements, and NFPA 72 where applicable.
15.1. Gas Detection Calibration and Alarm Loops
Fixed gas detectors must be functionally tested and calibrated to ensure they can trigger alarms before gas reaches an explosive concentration.
15.1.1. Perform a Zero-Point Calibration: Ensure the monitor reads exactly 0% LEL for methane, 0 ppm for H₂S, and 20.9% for Oxygen in clean ambient air.
15.1.2. Apply Certified Test Gas: Secure a calibration shroud over the sensor and apply a known concentration of test gas (e.g., 50% LEL methane mixed with 25 ppm H₂S).
15.1.3. Verify Pre-Alarm (10% LEL Methane): Confirm that as the gas concentration rises, the system activates local audio/visual strobes at the entrance and within the space when methane hits exactly 10% LEL.
15.1.4. Verify High-Alarm (20% to 25% LEL Methane): Ensure a higher threshold forces the master fire panel to dispatch emergency services via the dialer and automatically engages emergency auxiliary ventilation fans.
15.1.5. Verify Telemetry: Confirm the exact numeric gas levels display accurately on the plant's master SCADA control screen.
16. Ventilation and Classification Interlocks
NFPA 820 allows areas to operate with standard electrical gear only if the ventilation systems are running continuously to prevent gas accumulation. You must prove the safety interlocks work when that ventilation fails.
16.1. Cut Power to the Ventilation Fan: Manually shut off the primary exhaust/supply fan for the hazardous area (such as a headworks room or wet well).
16.2. Check Inline Flow Sensors: Verify that the inline duct differential pressure or flow sensor registers zero-flow within seconds.
16.3. Verify the Failsafe Interlock Trip:
16.3.1. Ensure a "Ventilation Failure" alarm instantly registers at a constantly attended location
(SCADA or the fire panel).
16.3.2. For spaces "derated" by ventilation, verify that the interlock automatically de-energizes all non-explosion-proof power to that room to prevent a stray electrical spark from hitting pooling gas.
16.4. Test Auxiliary Power: Switch the facility to emergency generator power and confirm the ventilation monitoring sensors and gas detectors stay fully operational.
17. Fire Alarm Control Panel & Dialer Path Testing
This step ensures fire and trouble conditions successfully escape the facility to alert first responders.
17.1. Place System in Test Mode: Notify the central monitoring station that testing is underway to avoid accidental fire department dispatches.
17.2. Trip Initiating Devices: Use a smoke aerosol pole or heat gun to trip duct smoke detectors, area sensors, and activate manual pull stations.
17.3. Execute a Comm-Fail Test: Disconnect the primary internet connection (IP path) on your dialer.
Verify that the secondary cellular path takes over and reports the trouble back to the central station within the required window.
17.4. Load-Test Backup Batteries: Disconnect the primary AC breaker to the fire panel. Use a specialized battery load tester to verify the standby lead-acid batteries can hold a sufficient voltage drop under full alarm load.