Exh C H-1 TDM Lot 8 ENG_ADMIN CDRLS DRAFT.docx

DOCX document 928 KB Posted

Attached to
DRAFT RFP for H-1 Training Device Modernization Program Procurement, Upgrades to AH-1Z and UH-1Y Flight Training Devices
Solicitation number
N6134022R0030
Issued by

View the file

Other files

File Type Posted
Exh A H-1 TDM Lot 7 ENG_ADMIN CDRLS DRAFT.docx DOCX document
Att 2 H-1 TDM Lot 7 and 8 PRF DRAFT.docx DOCX document
H-1 Lot VII_VIII Draft RFP 4.29.pdf PDF
Exh E H-1 TDM Lot 8 Tech Pubs CDRLs DRAFT.docx DOCX document
Exh D H-1 TDM Lot 8 Logistics CDRLs DRAFT.docx DOCX document
Attachment 4 DIT Form.pdf PDF
Att 1 H-1 TDM Lot 7 and 8 SOW DRAFT_4.11.docx DOCX document
Exh B H-1 TDM Lot 7 Logistic CDRLs DRAFT.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H-1 Lot 8 Engineering & Admin CDRL Data Items Summary List

CDRL #
H-1 Lot 8 DELIVERABLES
ABBREVIATION
AUTHORITY
AU01, BA01, BG01, BN01, BU01, CA01 CG01. CN01, CU01
DOD RISK MANAGEMENT FRAMEWORK PACKAGE
RMF
DI-MGMT-82001A
AU02
SOFTWARE PRODUCT DESIGN
SPD
DI-SESS-82036
AU03, BA03, BG03, BN03, BU03, CA03, CG03, CN03, CU03
SOFTWARE PRODUCT PACKAGE
SPP
DI-IPSC-82090C
AU04, BA04, BG04, BN04, BU04, CA04, CG04, CN04, CU04
TEST PROCEDURES
TP
DI-NDTI-80603A
AU05, BA05
REQUIREMENTS TRACEABILITY VERIFICATION MATRIX
RTVM
DI-MGMT-82133
AU06
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION
SSDD
DI-IPSC-81432A
AU07, BA07, BG07, BN07, BU07, CA07, CG07, CN07, CU07
TRAINER CRITERIA REPORT
TCR
DI-MISC-81281
AU08, BA08, BG08, BN08, BU08, CA08, CG08, CN08, CU08
TRAINER MATH MODEL REPORT
TMMR
DI-ILSS-81185
AU09
REQUEST FOR VARIANCE (RFV)
RFV
DI-SESS-80640E
AU0A
ENGINEERING CHANGE PROPOSAL (ECP)
ECP
DI-SESS-80639E
AU0B, BA0B, BG0B, BN0B, BU0B, CA0B, CG0B, CN0B, CU0B
VISUAL SYSTEMS TEST PROCEDURES VISUAL
VS TP

DI-NDTI-80603A

AU0C, BA0C, BG0C, BN0C, BU0C, CA0C, CG0C, CN0C, CU0C
SYSTEM ENGINEERING REPORT (VSER)

VSER

OT-21-

AU0D
SYNTHETIC ENVIRONMENT DATABASE DESIGN DOCUMENT
SEDDD
DI-MSSM-82158
AU0E
NAVAIR PORTABLE SOURCE INITIATIVE (NPSI) DATASET DELIVERY
NPSI
DI- MGMT -82125
H001
CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT
CPSMR
DI-MGMT-80227
H002
INTEGRATED PROGRAM MANAGEMENT REPORT(IPMR)/INTEGRATED MASTER SCHEDULE
IMS
DI-MGMT-81861C
H003
CONFERENCE AGENDA
CNF AG
DI-ADMN-81249C
H004
CONFERENCE MINUTES
CNF MIN
DI-ADMN-81250C
H005
PRESENTATION MATERIAL
PM
DI-ADMN-81373

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 83 of 76

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT VIII
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F197-1 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AU01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. BLK 4: TAILOR OUT PARAGRAPH 2 AND SUBSEQUENT PARAGRAPHS OF DI-MGMT-82001

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

· REQUIREMENTS SELECTION TAB

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

6. BLK 13 – SEE TABLE BELOW

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

8. DELIVERY TO THE NAWCTSD ENGR AND PCO SHALL BE LETTER NOTIFICATION ONLY.

NAWCTSD PCO
0
SEE

BLK 16

NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT IX
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F227-2 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

BA01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

9. BLK 4: TAILOR OUT PARAGRAPH 2 AND SUBSEQUENT PARAGRAPHS OF DI-MGMT-82001

10. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

11. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

12. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

13. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

14. BLK 13 – SEE TABLE BELOW

RMF PACKAGE ELEMENTS
DATE DUE

4. INVENTORY AND SYSTEM INFORMATION TAB

5. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

6. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

4. SELF ASSESSMENT TAB

5. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

6. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

3. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

4. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

2. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

15. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

16. DELIVERY TO THE NAWCTSD ENGR AND PCO SHALL BE LETTER NOTIFICATION ONLY.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT X
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F206-1 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

BG01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

17. BLK 4: TAILOR OUT PARAGRAPH 2 AND SUBSEQUENT PARAGRAPHS OF DI-MGMT-82001

18. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

19. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

20. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

21. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

22. BLK 13 – SEE TABLE BELOW

RMF PACKAGE ELEMENTS
DATE DUE

7. INVENTORY AND SYSTEM INFORMATION TAB

8. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

9. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

7. SELF ASSESSMENT TAB

8. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

9. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

5. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

6. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

3. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

23. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

24. DELIVERY TO THE NAWCTSD ENGR AND PCO SHALL BE LETTER NOTIFICATION ONLY.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT XI
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F215-1 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

BN01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT XII
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F196B-2 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

BU01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT XIII
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F227-5 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

CA01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT XIV
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F226-3 (UH-1Y)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

CG01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repro

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

3. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT XV
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F227-4 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

CN01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT XVI
TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM

(LOT VIII) 2F227-3 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

CU01
DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MGMT-82001A
SOW 210044 PARA 3.1.3.2
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
5TIMES
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS ATTACHMENT 6 TO THE RFP: “ATTACHMENT XX_RMF_PACKAGE_FORMAT.XLSX”.

3. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: SEE TABLE BELOW

DMRT RMF PACKAGE ELEMENTS
DATE DUE

· SYSTEM REGISTRATION TAB

EXCLUDE PROTOCOL AND PORTS IN THE DATA FLOW WORKSHEET

EXCLUDE PORTS IN THE SYSTEM INTERFACES WORKSHEET

FIRST SUBMISSION DUE TEN (10) BUSINESS DAYS PRIOR TO SRR II/SFR

RMF PACKAGE ELEMENTS
DATE DUE

1. INVENTORY AND SYSTEM INFORMATION TAB

2. COMPLETE ALL COLUMNS OF THE DATA FLOW WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

3. COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB

SECOND SUBMISSION DUE FORTY FIVE (45) BUSINESS DAYS AFTER CDR

1. SELF ASSESSMENT TAB

2. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

3. DRAFT CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

THIRD SUBMISSION DUE FIFTEEN (15) BUSINESS DAYS PRIOR TO TRR

1. PLAN OF ACTION AND MILESTONES (POA&M) RESULTS FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS FROM VULNERABILITY ASSESSMENT TOOLS)

2. FINAL CYBERSECURITY SYSTEMS ADMINISTRATION GUIDE (CSAG)

FOURTH SUBMISSION DUE TWENTY (20) BUSINESS DAYS AFTER IT-C1

1. VENDOR COMPLIANCE TEST REPORT FOR SOFTWARE (VCTRS)
FINAL SUBMISSION DUE AT FINAL PCA (FPCA)

7. BLK 14: DIGITAL MEDIA SHALL BE DELIVERED ON CD ROM OR VIA E-MAIL IF IT IS LESS THAN 6MB IN MICROSOFT WORD/EXCEL (COMPATIBLE WITH OFFICE 2016) FORMAT . E-MAIL ADDRESSES ARE LISTED IN SECTION F OF THE CONTRACT.

NAWCTSD PCO
0
SEE
NAWCTSD ENGR
0
SEE
NAWCTSD ISSM
1
SEE
NAWCTSD ISEO-CP
0
SEE
15. TOTAL
1
0
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A - LOT VIII
TDP _____ TM _____ OTHER SESS

D. SYSTEM/ITEM

ALL LOT VIII TRAINING DEVICES

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AU02
SOFTWARE PRODUCT DESIGN (SPD)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-SESS-82036
SOW 210044 PARA 3.2.26, 3.2.2.7
NAVAIR PMA-205, H1 TRAINING
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
3TIMES/R
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. CONTRACTOR AND SUBCONTRACTOR SPD INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.

2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547.

5. BLK 12: FIRST SUBMISSION SHALL BE DUE 30 BUSINESS DAYS PRIOR TO PDR.

6. BLK 13: SECOND SUBMISSION SHALL BE DUE 30 BUSINESS DAYS PRIOR TO CDR.

7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IFI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.

8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR AND NAWCTSD ISEO-CP.

10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

NAWCTSD SW ENGR
1
SEE
NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
0
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
3
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT VIII
TDP _____ TM _____ OTHER IPSC

D. SYSTEM/ITEM

(LOT VIII) 2F197-1 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

AU03
SOFTWARE PRODUCT PACKAGE (SPP)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-IPSC-82090C
SOW 210044 PARAS 3.2.2.10.1.2

& 3.2.8.13.5.2.1

NAVAIR PMA-205, H1 TRAINING

7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
3 TIMES/R
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

1. CONTRACTOR AND SUBCONTRACTOR SPP INFORMATION SHALL BE COMBINED INTO A SINGLE DOCUMENT.

2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: FIRST SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.

6. BLK 13: SECOND SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.

7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.

8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.

10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

11. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.

NAWCTSD SW ENGR
1
SEE
NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
0
SEE
NAWCTSD ILSM
0
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

C O N T R A C T D A T R E Q U I R E M E N T S L I S T

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A LOT IX
TDP _____ TM _____ OTHER IPSC

D. SYSTEM/ITEM

(LOT VIII) 2F227-2 (AH-1Z)

E. CONTRACT/PR NO.
F. CONTRACTOR
N61340XXC00XX
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

BA03
SOFTWARE PRODUCT PACKAGE (SPP)
N/A
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-IPSC-82090C
SOW 210044 PARAS 3.2.2.10.1.2

NAVAIR PMA-205, H1 TRAINING

7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
XX
REQUIRED
3 TIMES/R
SEE BLK 16
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES

Final

A

N/A
SEE BLK 16
draft
reg
repr

16. REMARKS

2. BLK 8: THE GOVERNMENT WILL HAVE TWENTYONE (21) BUSINESS DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE GOVERNMENT REVIEW PERIOD STARTS ON THE DUE DATE SPECIFIED HEREIN FOR EACH SUBMISSION OR ON THE ACTUAL SUBMISSION DATE, WHICHEVER COMES LAST.

3. BLK 8: REVIEWING OFFICE IS NAWCTSD CODE GT 5.2.4

4. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE: DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense (DoD) and US DoD Contractors only; (Administrative and Operational Use Only) 01 January 2021). Other requests shall be referred to PEO(CS)/PMA-205, 47123 Buse Road, RADM William A. Moffett Building, Patuxent River, Maryland, 20670-1547

5. BLK 12: FIRST SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO DT-1 (CPI) AND SHALL INCLUDE THE COLD START AND INSTALLATION PROCEDURES.

6. BLK 13: SECOND SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO IT-1 (IPI) AND SHALL INCLUDE ALL MEDIA FOR NON-COMMERCIAL ITEM SOFTWARE. CONTRACTOR SHALL MAKE THE COMMERCIAL ITEM SOFTWARE MEDIA AVAILABLE FOR GOVERNMENT USE WHILE PERFORMING THE COLD START AND INSTALLATION PROCEDURES.

7. BLK 13: THIRD (FINAL) SUBMISSION SHALL BE DUE 10 BUSINESS DAYS PRIOR TO FINAL PCA AND SHALL INCLUDE THE DELIVERY OF ALL SOFTWARE CONFIGURATION ITEMS (INCLUDING DATABASES AND COMMERCIAL ITEM MEDIA) REQUIRED TO ACCOMPLISH THE TRAINER SYSTEM COLD START AND INSTALLATION PROCEDURES.

8. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE CONTRACT.

9. BLK 14: ALL REPRODUCIBLE SUBMISSIONS SHALL BE POSTED IAW THE SOW. ALL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN AN EDITABLE ELECTRONIC FORMAT IN MICROSOFT WORD 2016 COMPATIBLE FORMAT. ADDITIONALLY, FINAL REPRODUCIBLE SUBMISSIONS SHALL BE DELIVERED IN ELECTRONIC FORMAT ON CD-ROM TO FOLLOWING ADDRESSEES: NAWCTSD SW ENGR, NAWCTSD ENGR, NAWCTSD ISEO-CP AND NAWCTSD ILSM.

10. BLK14: DELIVERY TO THE NAWCTSD PCO SHALL RECEIVE LETTER OF NOTIFICATION. EMAIL ADDRESS IS PROVIDED IN SECTION F OF THE CONTRACT.

11. THE DELIVERABLE SHALL BE FREE OF ALL PROPRIETARY MARKINGS, WITH THE EXCEPTION OF MARKINGS ON COMMERCIAL ITEM SOFTWARE.

NAWCTSD SW ENGR
1
SEE
NAWCTSD ENGR
1
SEE
NAWCTSD ISEO-CP
0
SEE
NAWCTSD ILSM
0
SEE
NAWCTSD PCO
0
SEE
15. TOTAL
2
0
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

CATTIEN NGUYEN, NAWCTSD SW ENGR

S. COLN, PMA-205 DAPMTS

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .