Exh A - CDRLs.pdf

PDF 6 MB Posted

Attached to
NAWCAD WOLF, N00421-23-R-0004, MISSION SYSTEMS ENGINEERING (MSE)
Solicitation number
N00421-23-R-0004
Issued by

About this file

This document provides a draft solicitation for Mission Systems Engineering services to support the Ship & Air Integrated Warfare Division of the Naval Air Warfare Center - Aircraft Division in St. Inigoes, Maryland. The solicitation seeks engineering support, integration support, and logistics support for C6ISR programs and systems. Comments on the draft solicitation are due by April 4, 2023. The document includes a draft statement of work, labor categories and hours, and attachments in Section J. Industry is asked to provide feedback on the labor breakdown and mix of categories to effectively execute the statement of work. The solicitation number is N00421-23-R-0004 and is a follow-on to N00421-19-D-0002. The NAICS code is 541330 for engineering services up to $47 million in size. The PSC is A13 for research and development services.

View the file

Other files

File Type Posted
Att 06 - COR Designation Letter.docx DOCX document
Att 05 - List of Approved Subcontractors.docx DOCX document
Att T1 - Sample Tasks.docx DOCX document
Att 07 - OCI List.docx DOCX document
Att 02 - QASP CSP.pdf PDF
Att 08 - Wage Determination.pdf PDF
Att P2 - Contractor Performance Assessment Questionnaire (CPAQ).pdf PDF
Att 01 - Draft DD254.pdf PDF
Att 10 - ACOR Designation Letter.docx DOCX document
Att 03 - Data Item Transmittal Form.docx DOCX document
Att C1 - Cost Workbook.xls XLS spreadsheet
Att T2 - Key Personnel.docx DOCX document
Att C2 - Cost Price Narrative.docx DOCX document
Att 04 - List of Key Personnel.docx DOCX document
Att 09 - GFP Template.xlsx XLSX spreadsheet
N00421-23-R-0004 DRAFT MSE.docx DOCX document
Att S1 - SBPCD.docx DOCX document
Att P1 - Past Performance Information Form.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Status Report Monthly Progress Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368A (See Blk 16) SOW/PWS Para 3.1.3.1, 3.3.2.2.4 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Blk 16) MTHLY See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A EOM 10 DARP (See Blk 16) Reg Repro

16. REMARKS NAWCAD WOLF SAIW 0 1 0

Blk 4: The Contractor shall address the Data Item Description (DID) requirements as applicable with the exception of Para 3.2.3 “Itemized man-hours and costs” as this information will be delivered in a CDRL A005.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blk 12: Submit within five business days of the first full month of performance.

Blk 13: Reporting period is the last day of each month.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat unless otherwise approved by the Government. Deliver to the COR as defined in the Contract.

(See Blk 16)

15.TOTAL▬▬▬▬► 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Division Acquisition Lead Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _29_Pages.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

REQUIRED

SUBMISSION

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL FOR CONTRACTOR PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Data CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).

Item 10. Specify number of time data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.

Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.

Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV Item should normally be shown on the DD Form

1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MISC_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Trip/Travel Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-81943 NOT 1 SOW/PWS Para 3.1.5.1.3 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Blk 16) ASREQ (See Blk 16) See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A N/A See Blk 16 Reg Repro

16. REMARKS NAWCAD WOLF SAIW 0 1 0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blks 10, 12, and 13: The Contractor shall submit the deliverable within five business days following the completion of each trip.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Government Property (GP) Inventory Report Contractor Acquired Property (CAP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80441D (See Blk 16)

SOW/PWS Para 3.1.5.2, 3.3.2.2.4, 3.3.2.3.1, 3.3.2.3.2, 3.3.2.3.4, 3.3.2.3.5 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ONE/R 30 DPT EOC

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A N/A Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: In addition to the Data Item Description (DID) requirements, the Contractor shall also address the status of initiated procurements.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

15.TOTAL▬▬▬▬► 1 1 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Phase-Out Transition Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81945 NOT 1 SOW/PWS Para 3.1.8 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ONE/R 90 DPT EOC

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A N/A Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

Government. Deliver to the COR and Contracting Officer (KO) as defined in the Contract.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005

Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs)

Segregation of Cost and Invoice Requirements Reporting for TDLs

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81864A NOT 1 (See BLK 16) SOW/PWS Para 3.1.9 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) See Blk 16 See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A (See Blk 16) See Blk 16 See Blk 16 Reg Repro

16. REMARKS NAWCAD WOLF SAIW 0 1 0

Blk 4: The Contractor shall use the format listed in attachment x excel template Contracting Officer’s Representative (COR) only and attachment X excel template COR and project lead/Technical Point of Contact (TPOC) of section J of the Contract. The Contractor shall segregate costs incurred on the task order at the lowest level of performance, by TDL or the lowest level subtask stated in the TDL and invoicing shall be in accordance with Section G Payment Instructions. In addition, the Contractor shall also include summaries of work charged during the period covered, percentage of funds invoiced and expended, budgeted, and an Estimate at Completion (EAC) at the level identified within each TDL to represent the estimated cost of tasking for the Period of Performance (PoP) of the TDL. For this CDRL the Contractor shall not submit data or invoices on a Contract Line Item Number (CLIN) or total contract basis.

Blk 7: Deliverable submissions shall be submitted to the distribution list under block 14 and via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blk 8: This CDRL format will not require Government approval. However, if the COR communicates errors found in either the data deliverable or the format, the COR will determine if immediate correction is warranted or can be corrected in the next deliverable submission.

Blks 10, 11, 12, and 13: The first data submission is due 10 business days after the first full month of Contract performance and shall include data from Contract award through the end of the first month of performance, this data shall also be submitted with the first invoice.

Subsequent monthly data deliverables shall be submitted within 10 business days of the preceding month and with each monthly invoice. The data deliverable shall reflect the exact dollar amount and PoP as shown on the invoice. All data submittals shall be distributed to those identified in block 14.

Blk 14: Distribution and submittal by electronic media. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the Government. Distribution for format approval and Data deliverables is as follows:

Format approval:

N/A

Monthly Data Deliverables:

COR only deliverable: COR and NAWCAD Procurement Group Procuring Contracting Officer

(PCO)

COR & Project Lead/TPOC deliverable: COR and NAWCAD Procurement Group PCO and Project Lead/TPOC

NAWCAD Procurement Group PCO

0 1 0

15.TOTAL▬▬▬▬► 0 2 0

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_QCIC_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006 Quality Assurance Program Plan (QAPP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-81794A (See Blk 16) SOW/PWS Para 3.1.10 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ONE/R 45 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A N/A Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: The QAPP shall address all areas of work to be performed under the Contract to include hardware and software systems engineering, integration and installation, configuration management, logistics, and the Contractor’s method for monitoring and reporting on the identified metrics.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 15 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 15 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within 10 business days of receipt of Government feedback.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_QCIC_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 Inspection and Test Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-81110 NOT 2 SOW/PWS Para 3.1.10.1 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ONE/R 30 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A N/A Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 15 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 15 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within 10 business days of receipt of Government feedback.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

Division Acquisition Lead Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MISC_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008 Scientific and Technical Reports Summary Process Documentation

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80048 NOT 2 (See Blk 16) SOW/PWS Para 3.1.10.2.1 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ASREQ (See Blk 16) See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A See Blk 16 Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: The Contractor shall document and update all processes used to fabricate, assemble, modify, install, deploy, and test products. All procedures and work instructions shall be consistent with the Contractor’s Quality Assurance Program Plan (QAPP), CDRL A006.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 15 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 15 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within 10 business days of receipt of Government feedback.

Blks 10, 12, 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

Division Acquisition Lead Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009 NAVAIR Operations Security (OPSEC) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81999A SOW/PWS Para 3.2.5 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ONE/R 90 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A N/A Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _10_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MISC_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010 Technical Report - Study/Services Analysis and Findings Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B (See Blk 16) See Blk 16 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) AS REQ (See Blk 16) AS REQ (See Blk 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A AS REQ (See Blk 16) Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: Contractor format is acceptable if all mandatory data points from the Data Item Description (DID) are covered.

Blk 5: SOW/PWS Para 3.3.1.1.1, 3.3.1.2.1, 3.3.1.2.2, 3.3.1.3.1, 3.3.1.3.2, 3.3.1.3.3, 3.3.1.3.4, 3.3.1.3.5, 3.3.1.4.1, 3.3.1.4.2, 3.3.1.4.3, 3.3.1.4.4, 3.3.1.4.5, 3.3.1.5.2, 3.3.1.5.3, 3.3.1.5.4, 3.3.1.5.5, 3.3.1.6.1, 3.3.1.6.4, 3.3.2.1.1, 3.3.2.1.2, 3.3.2.2.1, 3.3.2.2.2, 3.3.2.2.3, 3.3.2.2.6, 3.3.2.2.7, 3.3.2.3.2, 3.3.2.3.3, 3.3.2.3.4, 3.3.2.4.1, 3.3.2.4.2, 3.3.2.5.4, 3.3.2.5.6, 3.3.3.1.1, 3.3.3.1.2, 3.3.3.1.3, 3.3.3.1.4, 3.3.3.2.1, 3.3.3.2.2, 3.3.3.2.3, 3.3.3.3.1, 3.3.3.3.2, 3.3.3.3.3, 3.3.3.3.4, 3.3.3.4.1, 3.3.3.4.2, 3.3.3.4.3, 3.3.3.4.4, 3.3.3.4.6, 3.3.3.4.7

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 10, 12, and 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _11_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011 Requirements Traceability Verification Matrix (RTVM)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-82133 NOT 1 (See Blk 16) SOW/PWS Para 3.3.1.1.2 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) AS REQ (See Blk 16) AS REQ (See Blk 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A AS REQ (See Blk 16) Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: Contractor format is acceptable if all mandatory data points from the Data Item Description (DID) are covered.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 10, 12, and 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _12_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012

Integrated Program Management Data and Analysis Report (IPMDAR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81861C (See Blk 16)

SOW/PWS Para 3.3.1.1.2, 3.3.2.1.1, 3.3.2.1.2,

3.3.2.1.3 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ASREQ (See Blk 16) See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A N/A See Blk 16 Reg Repro

16. REMARKS NAWCAD WOLF SAIW 0 1 0

Blk 4: The Contractor shall address the Data Item Description (DID) requirements for Para

1.2.2 only. The Work Breakdown Structure (WBS) and schedules shall include enough detail to support tasking consistent with the level of complexity that the system may require.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blks 10, 12, 13: The Contractor shall submit the deliverable within five business days of the Government identifying the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _13_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_SESS_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013 Systems Engineering Management Plan (SEMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81785A (See Blk 16) SOW/PWS Para 3.3.1.4 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) AS REQ (See Blk 16) AS REQ (See Blk 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A AS REQ (See Blk 16) Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: The SEMP will encompass the project/program’s technical approach including processes, resources, metrics, applicable performance incentives, and the timing, conduct, and success criteria of technical reviews for tasking that includes system design or delivery.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 10, 12, and 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _14_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_MGMT_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014 Technical and Management Work Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81117A

SOW/PWS Para 3.3.1.4.1, 3.3.2.1.1, 3.3.2.1.2,

3.3.2.1.3 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) AS REQ (See Blk 16) AS REQ (See Blk 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A AS REQ (See Blk 16) Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blk 10, 12, and 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _15_ of _29_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_SESS_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A015 Product Engineering Design Data and Associated Lists

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81000F (See Blk 16)

SOW/PWS Para 3.3.1.5.2, 3.3.1.5.3, 3.3.1.5.4, 3.3.1.5.5, 3.3.3.4.1, 3.3.3.4.2, 3.3.3.4.3,

3.3.3.4.4 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ASREQ (See Blk 16) See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A See Blk 16 Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: The documentation shall identify all significant technical details necessary to properly integrate modify/upgrade and install the subject equipment or system. For hardware, material, spares, and other procurement tracking support, the reports shall identify various equipment categories, lead times, cognizant activities, National Stock Number (NSN) and non-NSN equipment, acquisition status, and overdue equipment and be in the form of an Government accessible electronic inventory system that shall track key information such as: Quantities, Vendor Information, Procurement and Receiving dates, Destination, System Assignments, Cost, Location.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If the Government does not provide comments within 10 business days of submission the CDRL is considered accepted.

Blk 8: The Government will have 10 business days to review and provide any written feedback.

If required, the Contractor shall submit the final deliverable within five business days of receipt of Government feedback.

Blks 10, 12, 13: The Contractor shall submit the deliverable within five business days after the Government identifies the requirement in writing.

Blk 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet

Division Acquisition Lead Contracting Officer’s Representative

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _16_ of _29_Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0007 A TDP_______ TM_______ OTHER_DRPR_____________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

SAIW Mission Systems Engineering TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A016

Engineering Documentation Product Drawings, Sanitized (Re-procurement)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-DRPR-81678A NOT 1 (See Blk 16) SOW/PWS Para 3.3.1.5.1 NAWCAD WOLF SAIW

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Blk 16) ASREQ (See Blk 16) See Blk 16

a. ADDRESSEE

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Blk 16) N/A See Blk 16 Reg Repro

16. REMARKS NAWCAD WOLF SAIW 1 1 0

Blk 4: New or revised engineering drawings shall be provided in a format consistent with TO SOW/PWSs and TDLs, which may include, but are not limited to AutoCAD, ComputerVision Computer-Aided Design and Drafting (CV CADD), or American Standard Code for Information Interchange (ASCII) format, which is compatible with the Initial Graphics Exchange Specification (IGES). The documentation shall identify all significant technical details necessary to properly integrate modify/upgrade and install the subject equipment or system.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .