Att T1 - Sample Tasks.docx
DOCX document 31 KB Posted
- Solicitation number
- N00421-23-R-0004
About this file
This document contains a draft federal solicitation for Mission Systems Engineering services and related sample tasks. The Naval Air Warfare Center Aircraft Division intends to competitively procure Mission Systems Engineering support services, including C6ISR systems engineering, integration, and logistics support. The solicitation number is N00421-23-R-0004 and involves Engineering Services with a small business size standard of $47 million. The requirement is a follow-on to contract N00421-19-D-0002. The document provides sample tasks addressing requirements for team composition, technical approach, schedules, and level of effort. Industry feedback is requested on the labor categories and hours in the statement of work by April 4, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 06 - COR Designation Letter.docx | DOCX document | |
| Att 05 - List of Approved Subcontractors.docx | DOCX document | |
| Att 07 - OCI List.docx | DOCX document | |
| Exh A - CDRLs.pdf | ||
| Att 02 - QASP CSP.pdf | ||
| Att 08 - Wage Determination.pdf | ||
| Att P2 - Contractor Performance Assessment Questionnaire (CPAQ).pdf | ||
| Att 01 - Draft DD254.pdf | ||
| Att 10 - ACOR Designation Letter.docx | DOCX document | |
| Att 03 - Data Item Transmittal Form.docx | DOCX document | |
| Att C1 - Cost Workbook.xls | XLS spreadsheet | |
| Att T2 - Key Personnel.docx | DOCX document | |
| Att C2 - Cost Price Narrative.docx | DOCX document | |
| Att 04 - List of Key Personnel.docx | DOCX document | |
| Att 09 - GFP Template.xlsx | XLSX spreadsheet | |
| N00421-23-R-0004 DRAFT MSE.docx | DOCX document | |
| Att S1 - SBPCD.docx | DOCX document | |
| Att P1 - Past Performance Information Form.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SAMPLE TASKS | RFP N00421-23-R-0004 | ||
| Volume 1 - Technical | Attachment T1 | ||
| (Section L, Part B, paragraph 1.1.1) | Page 1 of 3 |
| Contractor Name: |
| Enter text here. |
I. SAMPLE TASK ONE (1)
Address the following in response to Sample Task One (1) in Section L, Part B, paragraph 1.1.1.1.1:
a.) Team:
b.) Assumptions:
c.) Technical Approach:
d.) Performance Risk Analysis:
e.) Work Breakdown Structure/Schedule:
f.) Models and Tools:
g.) Progress Tracking:
h.) Reports:
i.) Level of Effort:
II. SAMPLE TASK TWO (2)
Address the following in response to Sample Task Two (2) in Section L, Part B, paragraph 1.1.1.1.2:
a.) Team:
b.) Assumptions:
c.) Technical Approach:
d.) Performance Risk Analysis:
e.) Work Breakdown Structure/Schedule:
f.) Models and Tools:
g.) Progress Tracking:
III. SAMPLE TASK THREE (3)
Address the following in response to Sample Task Three (3) in Section L, Part B, paragraph 1.1.1.1.3:
a.) Team:
b.) Assumptions:
c.) Technical Approach:
d.) Performance Risk Analysis:
e.) Work Breakdown Structure/Schedule:
f.) Models and Tools:
g.) Progress Tracking:
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104