Att C1 - Cost Workbook.xls
XLS spreadsheet 5 MB Posted
- Solicitation number
- N00421-23-R-0004
About this file
This document contains a draft solicitation for mission systems engineering services and related attachments to support the Naval Air Warfare Center - Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) at St. Inigoes, Maryland. The solicitation number is N00421-23-R-0004 and seeks to procure engineering, integration, and logistics support services for command, control, communications, computers, cyber, combat systems, intelligence, surveillance, and reconnaissance systems within the Ship & Air Integrated Warfare Division's project portfolio. The North American Industry Classification System code is 541330 for engineering services and the small business size standard is $47,000,000. The Product Service Code is A13 for national defense research and development services. Industry is asked to review the draft solicitation and attachments, and provide specific comments on the labor categories, hours, and labor breakdown by April 4, 2023 to two Navy email addresses. The requirement is a follow-on to contract N00421-19-D-0002. Any final solicitation will be posted at https://sam.gov/.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 06 - COR Designation Letter.docx | DOCX document | |
| Att 05 - List of Approved Subcontractors.docx | DOCX document | |
| Att T1 - Sample Tasks.docx | DOCX document | |
| Att 07 - OCI List.docx | DOCX document | |
| Exh A - CDRLs.pdf | ||
| Att 02 - QASP CSP.pdf | ||
| Att 08 - Wage Determination.pdf | ||
| Att P2 - Contractor Performance Assessment Questionnaire (CPAQ).pdf | ||
| Att 01 - Draft DD254.pdf | ||
| Att 10 - ACOR Designation Letter.docx | DOCX document | |
| Att 03 - Data Item Transmittal Form.docx | DOCX document | |
| Att T2 - Key Personnel.docx | DOCX document | |
| Att C2 - Cost Price Narrative.docx | DOCX document | |
| Att 04 - List of Key Personnel.docx | DOCX document | |
| Att 09 - GFP Template.xlsx | XLSX spreadsheet | |
| N00421-23-R-0004 DRAFT MSE.docx | DOCX document | |
| Att S1 - SBPCD.docx | DOCX document | |
| Att P1 - Past Performance Information Form.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Attachment C1 Instructions | |||
| Green Cells are Formula Based | |||
| Yellow Cells require an Input | |||
| Only one workbook shall be prepared for the entire period of performance (one workbook for each Prime and one for each Subcontractor) | |||
| The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. | |||
| All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations. | |||
| All dollar figures shall be carried out no further than two decimal places (e.g., $25.50). | |||
| Instructions for Prime Contractor: | |||
| Base Year Column | Subsequent Year Columns | ||
| 1 | Fill in all Indirect Rates in the Indirect Rates and Fee Worksheet. Ensure formula are still intact. These rates will be pulled into the Cost Summary Spreadsheet. | D | E, F, G, H |
| Instructions for Term and Completion Cost Summary Worksheets | |||
| 2 | Enter Prime Contractor's name into cell A3. | A | N/A |
| 3 | Enter all Offeror's (Prime's) employee names (or the word "Prospective") in Column A on the Cost Summary Worksheet (starting at row 9). If necessary, insert additional rows--but ensure integrity of formulas. Labor categories with more than one person being proposed shall be listed multiple times (one row per employee). For example, if you are proposing four Senior Analysts, then the labor category "Senior Analyst" shall be listed four times along with applicable rates and information. | A | N/A |
| 4 | Use the drop-down in column B to enter the Labor Category from the Request for Proposal (RFP) that you will be utilizing. By utilizing this drop-down, the minimum realistic rate as stated in the Minimum Direct Labor Rates worksheet will fill in, in column G. Please see solicitation for additional guidance regarding the minimum realistic rate. Note - DO NOT use the drag feature to pull down a labor category to a subsequent row. This will not allow the formulas to work properly. | B | N/A |
| 5 | Enter all Prime labor categories in Column C (starting at row 9). In column C, insert the title of the labor category the Contractor will be utilizing. You are not required to utilize the Government's labor categories, however, each proposed labor category should appear in the column beside the Government labor category it is comparable to. Please note, in evaluation, the Prime Contractor's proposal will be compared to the RFP for hours and labor categories. | C | N/A |
| 6 | In column D, insert a "K" if the worker will be performing at the Contractor's facility or a "G" if they will be performing in Government spaces, or a "T" if you have a differing OH rate that you utilize for that particular person. NOTE - If utilizing "T" provide an explanation. If the procurement has various Government Site locations (example, WOLF and Pax River), utilize "G" for both locations; a distinction does not need to be made between these sites for evaluation purposes. | D | N/A |
| 7 | In column E, identify for the specific individual whether their fully burdened rate is calculated using the full-time or part-time fringe rate. Enter "F" for full-time or "P" for part-time. | E | N/A |
| 8 | In column G, insert the direct labor rate for each labor category proposed. If the rate being proposed is less than the minimum direct labor rate in the Minimun Direct Labor Rates worksheet, the cell will turn red. If this occurs for a prospecitive employee, an explanation should be included in your cost narrative. Note: subsequent rate columns (L, Q, V and AA) are formula-based and are calculated using the escalation for that year. Ensure Formulas remain intact. | G | Formula Driven - L, Q, V, AB |
| 9 | In column H enter the labor hours for each row. Enter hours for each subsequent year (columns M, R, W, AB) | H | M, R, W, AB |
| 10 | This workbook includes hidden columns to assist with the correct application of indirect rates (two columns after each Amount column for each year). If, per your accounting practices, you DO NOT apply overhead to your fringe rate, you may delete the calculations included in the hidden columns that assist with adding overhead to Fringe. | Forumla Driven - J, K | Forumla Driven - O, P, T, U, Y, Z, AD, AE |
| 11 | Escalation has been autopopulated based on the RFP. If, in accordance with the RFP, you are utilizing a rate that differs than what has already been filled in, you may change the value in the cell and provide an explaination in your cost narrative. | N/A | M, R, W, AB |
| 12 | For each subcontractor, enter the employee name (or the word "Prospective"), labor category, site, fully burdened rate and hours | A, B, D, G, H | L, M, Q, R, V, W, AA, AB |
| 13 | The minimum rate is blacked out in column F for Subcontractors. The minimum rate is analyzed at the direct labor rate; however, the rates included for Subcontractor's in the Offeror's (Prime's) submission will be fully burdened labor rates. | F | N/A |
| 14 | Note: If more Subcontractors are needed, the Offeror may add additional rows to accommodate them; however, please ensure integrity of formulas. If fewer Subcontractors are needed, hide the rows instead of deleting them. | ||
| 15 | Under Other Direct Costs, the proposed Travel and Material Costs should be entered in Columns I, N, S, X, and AB. | I | N, S, X, AB |
| 16 | Check to ensure the indirects are applied appropriatly to ODCs. If the formulas that are utilized do not match your accounting practices, either make an adjustment in the Indirects Rates and Fee tab or adjust the formula and note why changes were made. | I | N, S, X, AB |
| 17 | Check to ensure that the fee per hour calculation/value for 5252.232-9510 when multiplied by the total number of hours proposed, matches the "Total Fee (for Prime and Subcontractor Labor)" amount. |
NOTE: Section L, Part C, Paragraph 3.3.1.5 could result in hardcoding over the formula-based calculation for the "Total Fee (for Prime and Subcontractor Labor)".
| Steps to ensure the fee per hour calculation for 5252.232-9510 matches what is in your C2 (and, therefore, what will be utilized for CLIN values): Non-Performance Based/Level of Effort - The fee per hour is the total Fixed Fee proposed for all ordering periods divided by the total LOE hours for all ordering periods. Performance Based/Completion - The fixed fee is calculated based on the total fee proposed for all ordering periods divided by the total proposed costs for all ordering periods. | I | N, S, X, AB | ||
| Total Compensation Plan Worksheet Instructions | ||||
| 18 | In column B, include Yes or No to note if that benefit is provided by your company as part of your total compensation plan | N/A | N/A | |
| Hourly Burdened Composite Labor Rate Instructions | ||||
| 19 | There are four (4) separate worksheets associated with Hourly Burdened Composite Labor Rates. Column A identifies the Government labor category correlating to Section C of the RFP. Enter the proposed Hourly Burdened Composite Rate for each labor category during the applicable performance year (1-5) of the ordering period. Enter numbers only, in U.S. dollar format ($###.##), rounded to the nearest cent. The Hourly Burdened Composite Labor Rates shall include direct labor rates plus all applicable burdens, to include indirect rates, applicable escalation rates, subcontractor fee on subcontractor labor, and subcontractor pass-through costs (exclusive of prime fee on subcontractor's labor). The proposed Hourly Burdened Composite Labor Rate shall not include prime fee on prime labor, prime fee on subcontractor labor, Other Direct Costs (ODCs) such as Travel and Material, and Cost of Money (if proposed). The Hourly Burdened Composite Labor Rate is the sum of both the prime and all subcontractors' labor costs, as described above, for that labor category, divided by the total number of labor hours for that labor category. | B | C-F | |
| Instructions for Subcontractors: | ||||
| Green Cells are Formula Based | ||||
| Yellow Cells require an Input | ||||
| For your (the Subcontractor) cost build-up, utilize the "Prime" section of the Cost Summary worksheet. For all intents and purposes (other than A3) where it says Prime, you can replace "Prime" with "Subcontractor", or your company name. | ||||
| Base Year Column | Subsequent Year Columns | |||
| Indirect Rates and Fee Instructions | ||||
| 1 | Fill in all Indirect Rates in the Indirect Rates and Fee Worksheet, these rates will be pulled into the Cost Summary Spreadsheet. Ensure formula are still intact. | D | E, F, G, H | |
| Instructions for Term and Completion Cost Summary Worksheets | ||||
| 2 | Enter Prime Contractor's name into cell A3. | A | N/A | |
| 3 | Enter all subcontractor employee names (or the word "Prospective") in Column A on the Cost Summary Worksheet (starting at row 9). If necessary, insert additional rows--but ensure integrity of formulas. Labor categories with more than one person being proposed shall be listed multiple times (one row per employee). For example, if the Offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information. | A | N/A | |
| 4 | Use the drop-down in column B to enter the Labor Category from the Request for Proposal (RFP) you will be utilizing. By utilizing this drop-down, the minimum realistic rate as stated in the Minimum Direct Labor Rates worksheet will fill in, in column G. Please see solicitation for additional guidance regarding the minimum realistic rate. | B | N/A | |
| 5 | Enter all Subcontractor labor categories in Column C (starting at row 9). In column C, insert the title of the labor category being utilized. You are not required to utilize the Government's labor categories; however, each proposed labor category should appear in the column beside the Government labor category it is comparable to. Please note, in evaluation, your proposal will be compared to the RFP for hours and labor categories. | C | N/A | |
| 6 | In column D, insert a "K" if the worker will be performing at the Contractor's facility, a "G" if they will be performing in Government spaces, or a "T" if there is a different OH rate being utilized for that particular person. NOTE - If utilizing "T" provide an explanation. If the procurement has various Government Site locations (example, WOLF and Pax River), utilize "G" for both locations; a distinction does not need to be made between these sites for evaluation purposes. | D | N/A | |
| 7 | In column E, identify for the specific individual whether their fully burdened rate is calculated using the full-time or part-time fringe rate. Enter "F" for full-time or "P" for part-time. | E | N/A | |
| 8 | In column G, insert the direct labor rate for each row. If the rate that you are proposing is less than the minimum direct labor rate as included in the Minimun Direct Labor Rates worksheet, the cell will turn red. If this happens for a prospective employee, an explaination should be included in your cost narrative. Note: Subsequent rate columns (L, Q, V and AA) are formula-based and are calculated using the escalation for that year. | G | Formula Driven - L, Q, V, AB | |
| 9 | In column H, enter the labor hours for each row. Enter hours for each subsequent year (columns M, R, W, AB). | H | M, R, W, AB | |
| 10 | This workbook includes hidden columns to assist with the correct application of indirect rates (two columns after each Amount column for each year). If, per your accounting practices, you DO NOT apply overhead to your fringe rate, you can delete the calculations included in the hidden columns that assist with adding overhead to Fringe. | Formula Driven - J, K | Forumla Driven - O, P, T, U, Y, Z, AD, AE | |
| 11 | Escalation has been autopopulated based on the RFP. If, in accordance with the RFP, you are utilizing a rate that differs than what has already been filled in, you may change the value in the cell and provide an explaination in your cost narrative. | N/A | M, R, W, AB | |
| Total Compensation Plan Worksheet Instructions | ||||
| 12 | In column B, include Yes or No to note if that benefit is provided by your company as part of your total compensation plan | N/A | N/A |
Indirect Rates and Fee
| Indirect Cost Summary | |||||||
| Company Name: | |||||||
| Indirect Rates (%) | |||||||
| Indirect Cost Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | |
| Fringe | DO NOT ENTER DATA HERE | ||||||
| F | Fringe: Full Time | ||||||
| P | Fringe: Part Time | ||||||
| Overhead* | |||||||
| KTR | KTR Site OH | ||||||
| G | Gov Site OH | ||||||
| T | Other Site OH | ||||||
| G&A | |||||||
| G&A | |||||||
| G&A on ODCs | |||||||
| Subcontractor Handling | |||||||
| Material Handling (on ODC) | |||||||
| Material Handling (on sub) | |||||||
| SubcontractsHandling | |||||||
| Fee | |||||||
| Fee on Prime labor | |||||||
| Fee on Sub labor | |||||||
| *Note, this procurement does not designate any sites other than Government and Contractor site. The "Other Site" Overhead option is included in case the Contractor has multiple OH rates beyond Government and Contractor site. |
&C&"Times New Roman,Bold"UNCLASSIFIED &C&"Times New Roman,Regular"&8 &"Times New Roman,Bold"UNCLASSIFIED&R&"Times New Roman,Regular"&P of &N
Term Cost Summary
| COST SUMMARY SPREADSHEET | |||||||||||||||||||||||||||||||||||||||
| Prime Offeror Name: | |||||||||||||||||||||||||||||||||||||||
| Subcontractor Name (if applicable): | Escalation | 3.20% | Escalation | 3.20% | Escalation | 3.20% | Escalation | 3.20% | Escalation | ||||||||||||||||||||||||||||||
| Ordering Period Year 1 | Extra columns to apply overhead to Fringe | Ordering Period Year 2 | Extra columns to apply overhead to Fringe | Ordering Period Year 3 | Extra columns to apply overhead to Fringe | Ordering Period Year 4 | Extra columns to apply overhead to Fringe | Ordering Period Year 5 | Extra columns to apply overhead to Fringe | NO DATA IN THESE COLUMNS | Extra columns to apply overhead to Fringe | Total for All Years | |||||||||||||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | Site (K, G, T) | F/P | Minimum Direct Labor Rate | Rate | 1 | Hours | 1 | Amount | 1 | Overhead on Fringe Calc. | 1 | Fringe Amount | 1 | Rate | 2 | Hours | 2 | Amount | 2 | Overhead on Fringe Calc. | 2 | Fringe Amount | 2 | Rate | 3 | Hours | 3 | Amount | 3 | Overhead on Fringe Calc. | 3 | Fringe Amount | 3 | Rate | 4 | Hours | 4 | Amount | 4 | Overhead on Fringe Calc. | 4 | Fringe Amount | 4 | Rate | 5 | Hours | 5 | Amount | 5 | Overhead on Fringe Calc. | 5 | Fringe Amount | 5 | Rate | 6 | Hours | 6 | Amount | 6 | Overhead on Fringe Calc. | 6 | Fringe Amount | 6 | Hours | Total | Amount | Total | Row | |
| Prime Contractor Labor Cost | 0 | 7 | |||||||||||||||||||||||||||||||||||||
| Prime Contractor Direct Labor | 0 | 8 | |||||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 9 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 10 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 11 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 12 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 13 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 14 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 15 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 16 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 17 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 18 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 19 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 20 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 21 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 22 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 23 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 24 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 25 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 26 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 27 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 28 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 29 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 30 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 31 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 32 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 33 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 34 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 35 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 36 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 37 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 38 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 39 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 40 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 41 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 42 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 43 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 44 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 45 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 46 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 47 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 48 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 49 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 50 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 51 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 52 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 53 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 54 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 55 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 56 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 57 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 58 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 59 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 60 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 61 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 62 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 63 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 64 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 65 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 66 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 67 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 68 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 69 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 70 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 71 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 72 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 73 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 74 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 75 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 76 | ||||||||||||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 77 | ||||||||||||||||||||||||||||||
| Total Direct Labor Cost | 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 78 | |||||||||||||||||||||||
| 0 | Overhead on Fringe Calculation | $0.00 | Overhead on Fringe Calculation | Overhead on Fringe Calculation | Overhead on Fringe Calculation | Overhead on Fringe Calculation | Overhead on Fringe Calculation | 79 | |||||||||||||||||||||||||||||||
| Prime Indirect Labor Cost | 0 | Base | $ - 0 | Fringe Base KTR Site | Fringe Amount | Base | $ - 0 | Fringe Base KTR Site | Fringe Amount | Base | $ - 0 | Fringe Base KTR Site | Fringe Amount | Base | $ - 0 | Fringe Base KTR Site | Fringe Amount | Base | $ - 0 | Fringe Base KTR Site | Fringe Amount | Base | $ - 0 | Fringe Base KTR Site | Fringe Amount | 80 | |||||||||||||
| Overhead | KTR | K | 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 81 | ||||
| Overhead | Govt | G | 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 82 | ||||
| Overhead | Other | T | 0 | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 0.00% | $ - 0 | $ - 0 | Fringe Base Govt Site | Fringe Amount | 83 | |||||
| Subtotal Overhead | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 84 | ||||||||||||||||||||||||||||||
| Fringe Benefits | Full Time | F | 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 85 | ||||
| Fringe Benefits | Part Time | P | 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 86 | ||||
| Subtotal Fringe Benefits | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 87 | ||||||||||||||||||||||||||||||
| Subtotal | 0 | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | Fringe Base Telework | Fringe Amount | $ - 0 | 88 | ||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 89 | |||||||||||||||||||||||||
| Premium | Overtime Premium | 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 90 | |||||||||||
| G&A | G&A | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 91 | |||||||||||||||||
| Total Indirect Labor Cost | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 92 | ||||||||||||||||||||||||||||||
| Total Direct and Indirect Labor cost | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 93 | ||||||||||||||||||||||||||||||
| 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | 94 | ||||||||||||||||||||||||||
| FCCOM | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 95 | ||||||||||||||||||||||||
| Total Prime Contractor Labor Cost | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 96 | ||||||||||||||||||||||||||||||
| 0 | 97 | ||||||||||||||||||||||||||||||||||||||
| Subcontractor Labor Cost | 0 | 98 | |||||||||||||||||||||||||||||||||||||
| 0 | 99 | ||||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 100 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 101 | |||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 102 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 103 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 104 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 105 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 106 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 107 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 108 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 109 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 110 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 111 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 112 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 113 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 114 | ||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 115 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 116 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 117 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 118 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 119 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 120 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 121 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 122 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 123 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 124 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 125 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 126 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 127 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 128 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 129 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 130 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 131 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 132 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 133 | |||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 134 | ||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 135 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 136 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 137 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 138 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 139 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 140 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 141 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 142 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 143 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 144 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 145 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 146 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 147 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 148 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 149 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 150 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 151 | ||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 152 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 153 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 154 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 155 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 156 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 157 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 158 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 159 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 160 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 161 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 162 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 163 | |||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 164 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 165 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 166 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 167 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 168 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 169 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 170 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 171 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 172 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 173 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 174 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 175 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 176 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 177 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 178 | |||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 179 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 180 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 181 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 182 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 183 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 184 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 185 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 186 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 187 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 188 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 189 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 190 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 191 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 192 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 193 | |||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 194 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 195 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 196 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 197 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 198 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 199 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 200 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 201 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 202 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 203 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 204 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 205 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 206 | |||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 207 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 208 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 209 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 210 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 211 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 212 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 213 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 214 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 215 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 216 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 217 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 218 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 219 | ||||||||||||||||||||||||||||||
| Subcontractor (Name) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | 0 | - 0 | $ - 0 | - 0 | $ - 0 | 220 | |||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 221 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 222 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 223 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 224 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 225 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 226 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 227 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 228 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 229 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 230 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 231 | |||||||||||||||||||||||||||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | 232 | ||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 233 | ||||||||||||||||||||||||||||||
| Total proposed subcontractor cost (w/sub fee) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 234 | |||||||||||||||||||||||
| Prime contractor pass through (not including prime fee) | 0 | 235 | |||||||||||||||||||||||||||||||||||||
| Handling | Material Handling (on sub) | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 236 | |||||||||||||||||
| Handling | SubcontractsHandling(SH) | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 237 | |||||||||||||||||
| G&A | G&A | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 238 | |||||||||||||||||
| Other (if any) | 0 | 239 | |||||||||||||||||||||||||||||||||||||
| Total pass through (not including fee) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 240 | ||||||||||||||||||||||||||||||
| Total Subcontractor Cost including pass through | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 241 | ||||||||||||||||||||||||||||||
| 0 | 242 | ||||||||||||||||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 243 | |||||||||||||||||||||||
| 0 | 244 | ||||||||||||||||||||||||||||||||||||||
| Fixed Fee | 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | 245 | |||||||||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 246 | ||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 247 | ||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 248 | ||||||||||||||||||||||||||||||
| 0 | 249 | ||||||||||||||||||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 250 | ||||||||||||||||||||||||||||||
| 0 | 251 | ||||||||||||||||||||||||||||||||||||||
| Other Direct Costs | 0 | 252 | |||||||||||||||||||||||||||||||||||||
| Other Direct Costs (ODCs) | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 253 | ||||||||||||||||||||||||||||||
| Travel | 0 | $ - 0 | 254 | ||||||||||||||||||||||||||||||||||||
| Materials | 0 | $ - 0 | 255 | ||||||||||||||||||||||||||||||||||||
| 0 | 256 | ||||||||||||||||||||||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | Base | $ - 0 | 257 | |||||||||||||||||||||||||
| Handling | Material Handing (on ODC) | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 258 | |||||||||||||||||
| G&A | G&A | 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | 259 | |||||||||||||||||
| Total ODCs | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 260 | ||||||||||||||||||||||||||||||
| 0 | 261 | ||||||||||||||||||||||||||||||||||||||
| 0 | 262 | ||||||||||||||||||||||||||||||||||||||
| Total CPFF all CLINs (Labor and ODCs) | 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | 263 | |||||||||||||||||||||||
| Pass Through Analysis - Total for All Years | Amount | Percent | |||||||||||||||||||||||||||||||||||||
| Subcontractor proposed cost and fee | $0 | ||||||||||||||||||||||||||||||||||||||
| Pass Through Amount (not including fee) | $0 | ||||||||||||||||||||||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | $0 | ||||||||||||||||||||||||||||||||||||||
| Total Pass Through Amount (including fee) | $0 | 0.0% | |||||||||||||||||||||||||||||||||||||
| Fee Analysis - Total for All Years | Amount | Percent | |||||||||||||||||||||||||||||||||||||
| Prime Contractor Labor Cost | $0 | ||||||||||||||||||||||||||||||||||||||
| Fixed Fee for Labor Performed by Prime Contractor | $0 | 0.0% | |||||||||||||||||||||||||||||||||||||
| Fee Per Hour Calculation | |||||||||||||||||||||||||||||||||||||||
| See instructions tab for more info | |||||||||||||||||||||||||||||||||||||||
| Step 1 | Step 2 | Step 3 | |||||||||||||||||||||||||||||||||||||
| Fee Per Hour based on "Total Fee ( for Prime and Subcontractor Labor)" / Total Proposed Labor Hours | Fee Per Hour to use in | ||||||||||||||||||||||||||||||||||||||
| 5252.232-9510 | Fee Ceiling Value | ||||||||||||||||||||||||||||||||||||||
| - 0 | $0.00 | 0 |
&C&"Times New Roman,Bold"UNCLASSIFIED &C&"Times New Roman,Regular"&8 Source Selection Information - See FAR 2.101 and 3.104 &"Times New Roman,Bold"UNCLASSIFIED&R&"Times New Roman,Regular"&P of &N If utilizing an overtime premium, adjust the formulas as appropriate and note the change.
Completion Cost Summary
| COST SUMMARY SPREADSHEET | |||||||||||||||||||||||||||||||||||||||
| Prime Offeror Name: | |||||||||||||||||||||||||||||||||||||||
| Subcontractor Name (if applicable): | Escalation | 3.20% | Escalation | 3.20% | Escalation | 3.20% | Escalation | 3.20% | Escalation | 3.20% | |||||||||||||||||||||||||||||
| Ordering Period Year 1 | Extra columns to apply overhead to Fringe | Ordering Period Year 2 | Extra columns to apply overhead to Fringe | Ordering Period Year 3 | Extra columns to apply overhead to Fringe | Ordering Period Year 4 | Extra columns to apply overhead to Fringe | Ordering Period Year 5 | Extra columns to apply overhead to Fringe | NO DATA IN THESE COLUMNS | Extra columns to apply overhead to Fringe | Total for All Years | |||||||||||||||||||||||||||
| Cost Elements | Government Labor Category | Proposed Labor Category | Site (K, G, T) | F/P | Minimum Direct Labor Rate | Rate | 1 | Hours | 1 | Amount | 1 | Overhead on Fringe Calc. | 1 | Fringe Amount | 1 | Rate | 2 | Hours | 2 | Amount | 2 | Overhead on Fringe Calc. | 2 | Fringe Amount | 2 | Rate | 3 | Hours | 3 | Amount | 3 | Overhead on Fringe Calc. | 3 | Fringe Amount | 3 | Rate | 4 | Hours | 4 | Amount | 4 | Overhead on Fringe Calc. | 4 | Fringe Amount | 4 | Rate | 5 | Hours | 5 | Amount | 5 | Overhead on Fringe Calc. | 5 | Fringe Amount | 5 | Rate | 6 | Hours | 6 | Amount | 6 | Overhead on Fringe Calc. | 6 | Fringe Amount | 6 | Hours | Total | Amount | Total | Row | |
| Prime Contractor Labor Cost | 0 | 7 | |||||||||||||||||||||||||||||||||||||
| Prime Contractor Direct Labor | 0 | 8 | |||||||||||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 9 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 10 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 11 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 12 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 13 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 14 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 15 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 16 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 17 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 18 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 19 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 20 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | 21 | |||||||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 22 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 23 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 24 | ||||||||||||||||||||||||
| Employee Name or Prospective | $ - 0 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | $0.00 | $ - 0 | 0.00 | $ - 0 | 25 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .