This document is the Evaluation Criteria for Award for Solicitation FA8203-24-R-0004, which is for the F-15 Shimmy Damper Actuator Remanufacture. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis.

Price will be evaluated by adding the extended prices for the basic award and option quantities to determine the Total Evaluated Price. Technical Acceptability will consist of two subfactors - Approved Source and Property Management Plan (PMP). Offerors must be an approved source, or satisfy the requirements to become an approved source, in order to be technically acceptable. Offerors must also submit a PMP that discusses the voluntary consensus standards or industry-leading practices they will follow regarding Government Furnished Property.

View the file

Other files

File Type Posted
FA8203-24-R-0004-0005 (Shimy Damper) Revise Closing Date Req Delivery SOW.pdf PDF
SOW_F-15_NWS_Shimmy_Damper_Acuator_2024_Dec_4.pdf PDF
FA8203-24-R-0004-0004 (Shimmy Damper) Extend Sol Closing Date 26 Nov 2024.pdf PDF
CDRL 82128 GFM Monthly Req Inventory Report.pdf PDF
RDL shimmy damper version 4.pdf PDF
CDRL 81634 GFM END ITEM.pdf PDF
Sol Amd FA820324R0004-0003 Shimmy Damper.pdf PDF
CAVAF_GFM_App_B__05Sep2024.pdf PDF
SOW_F-15_NWS_Shimmy_Damper_Acuator_2024_Sep_5.pdf PDF
GFP FA820324R0004_1.pdf PDF
Evaluation Criteria For Award (Shimmy Damper) Sol FA8203-24-R-0004 dtd 21 May 24.pdf PDF
RFP Amd FA8203-24-R-0004 (Shimmy Damper ) Extend Closing Date to 10 June 2024.pdf PDF
Form_158_Packaging_Shimmy_Damper_PR_23_00839.pdf PDF
CDRL_A010_IUID_Marking_Activity_Verification_Report.pdf PDF
GFP_Attach_Shimmy_Damper.pdf PDF
CDRL_A008_Engineering_Change_Proposal.pdf PDF
SPI_packaging_002671046.pdf PDF
SOW_F_15_NWS_Shimmy_Damper_Acuator_2024_March_8.pdf PDF
SOW_Preservation_Packaging_Marking_PR_23_00839.pdf PDF
RQR_Shimmy_Damper_Sol_PR_23_00839.pdf PDF
CDRL_A007_AFTO_Form_95.pdf PDF
CAV_AF_Reporting_Requirements.pdf PDF
CDRL_A006_Program_Status_Report.pdf PDF
CDRL_A002_Quality_Deficiency_Reporting.pdf PDF
Repair_Data_List_Shimmy_Damper_PR_23_00839.pdf PDF
CDRL_A005_Annual_Inventory_Report.pdf PDF
IUID_Checklist_Shimmy_Damper_PR_23_00839.pdf PDF
FA8203-24-R-0004 (Shimmy Damper) RFP.pdf PDF
CDRL_A004_CFM_END_ITEM_REPORTING.pdf PDF
CDRL_A001_Request_for_Deviation.pdf PDF
CDRL_A003_CDM_Monthly_Production_Report_Template.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION CRITERIA FOR AWARD

SOLICITATION: FA8203-24-R-0004

For purposes of award, offers will be evaluated based on the Lowest Price Technically Acceptable

(LPTA).

Factor 1 - Price Price will be evaluated by adding the extended prices for basic award and option quantities (i.e. Total Evaluated Price (TEP)). An example of the extended prices evaluation is provided below for reference.

CLIN DESCRIPTION PROPOSED CLIN AMOUNT

0001 Basic Award – Remanufacture $ 0002 Basic Award – CDRLs NSP 0003 Option 1 – Remanufacture $ 0004 Option 1 – CDRLs NSP 0005 Option 2 – Remanufacture $ 0006 Option 2 – CDRLs NSP 0007 Option 3 – Remanufacture $ 0008 Option 3 – CDRLs NSP 0009 Option 4 – Remanufacture $ 0010 Option 4 – CDRLs NSP

TOTAL EVALUATED PRICE $

Factor 2 – Technical Acceptability Technical Acceptability will consist of two subfactors – (a) Approved Source and (b) Property Management Plan (PMP).

(a) Subfactor 1 - Approved Source: Technical Acceptability will be evaluated by the offeror being listed as an approved source. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. List of approved source(s) is provided below.

Approved Source(s) Cage Code Moog 94697 Heroux-Devtek 36164

Alternate sources shall refer to the attached “Repair Qualification Requirements” for procedures that must be satisfied to become an approved source for this requirement. Award of the subject solicitation may not be delayed due to alternate sources notifying the appropriate government contracting office of intent to qualify as an approved source for this requirement.

(b) Subfactor 2 – Property Management Plan: Technical Acceptability will be evaluated by the offeror submitting as part of their proposal a Property Management Plan (PMP) that discusses the voluntary consensus standards (VCSs) or industry-leading practices (ILPs) that they intend to follow regarding Government Furnished Property (GFP) FAR 45.201(c)(4). The items being provided for remanufacture are considered GFP. The Government Contracting Officer (CO) will evaluate the PMP for adequacy IAW FAR requirements. The PMP will be incorporated into the resulting contract upon award.