CDRL_A003_CDM_Monthly_Production_Report_Template.pdf

PDF 285 KB Posted

Attached to
F-15 Shimmy Damper Actuator Remanufacture
Solicitation number
FA8203-24-R-0004
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that outlines the reporting requirements for a federal contract opportunity related to the remanufacture of F-15 Shimmy Damper Actuators. The CDRL specifies the details for the required monthly production report, including the format, distribution, and submission schedule. Key details include:

The contractor must provide a monthly CDM (Contract Depot Maintenance) Production Report within 10 business days of the previous month's end. The report must include inventory accountability, production metrics, and totals for each repair location. Distribution is limited to the Department of Defense and authorized contractors. The CDRL also includes export control and destruction notices. The contract opportunity this CDRL is associated with is for the remanufacture of F-15 Shimmy Damper Actuators, with a solicitation number of FA8203-24-R-0004.

View the file

Other files

File Type Posted
FA8203-24-R-0004-0005 (Shimy Damper) Revise Closing Date Req Delivery SOW.pdf PDF
SOW_F-15_NWS_Shimmy_Damper_Acuator_2024_Dec_4.pdf PDF
FA8203-24-R-0004-0004 (Shimmy Damper) Extend Sol Closing Date 26 Nov 2024.pdf PDF
CDRL 82128 GFM Monthly Req Inventory Report.pdf PDF
RDL shimmy damper version 4.pdf PDF
CDRL 81634 GFM END ITEM.pdf PDF
Sol Amd FA820324R0004-0003 Shimmy Damper.pdf PDF
CAVAF_GFM_App_B__05Sep2024.pdf PDF
SOW_F-15_NWS_Shimmy_Damper_Acuator_2024_Sep_5.pdf PDF
GFP FA820324R0004_1.pdf PDF
Evaluation Criteria For Award (Shimmy Damper) Sol FA8203-24-R-0004 dtd 21 May 24.pdf PDF
RFP Amd FA8203-24-R-0004 (Shimmy Damper ) Extend Closing Date to 10 June 2024.pdf PDF
Form_158_Packaging_Shimmy_Damper_PR_23_00839.pdf PDF
CDRL_A010_IUID_Marking_Activity_Verification_Report.pdf PDF
GFP_Attach_Shimmy_Damper.pdf PDF
CDRL_A008_Engineering_Change_Proposal.pdf PDF
SPI_packaging_002671046.pdf PDF
SOW_F_15_NWS_Shimmy_Damper_Acuator_2024_March_8.pdf PDF
SOW_Preservation_Packaging_Marking_PR_23_00839.pdf PDF
RQR_Shimmy_Damper_Sol_PR_23_00839.pdf PDF
CDRL_A007_AFTO_Form_95.pdf PDF
CAV_AF_Reporting_Requirements.pdf PDF
CDRL_A006_Program_Status_Report.pdf PDF
CDRL_A002_Quality_Deficiency_Reporting.pdf PDF
Repair_Data_List_Shimmy_Damper_PR_23_00839.pdf PDF
CDRL_A005_Annual_Inventory_Report.pdf PDF
IUID_Checklist_Shimmy_Damper_PR_23_00839.pdf PDF
FA8203-24-R-0004 (Shimmy Damper) RFP.pdf PDF
CDRL_A004_CFM_END_ITEM_REPORTING.pdf PDF
Evaluation_Criteria_For_Award_Shimmy_Damper_Sol_FA8203_24_R_0004.pdf PDF
CDRL_A001_Request_for_Deviation.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

xTDP: Off xTM: Off

OTHER:

DSYSTEMITEM:

E_CONTRACTPR_NO:

FCONTRACTOR:

16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.

Page2: 2 of_pages:

Reset:

xtm: Off
1_DATA_ITEM_NO: A/B/C/D/E003
2_TITLE_OF_DATA_ITEM: Contract Depot Maintenance (CDM) Monthly Production Report
3_SUBTITLE: CDM Production Monthly Status Report
4_AUTHORITY_Data_Acquisit: DI-PSSS-81995
5_CONTRACT_REFERENCE: SOW, para 5.2.3
6_REQUIRING_OFFICE: 417 SCMS/GUMD
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: D
10_FREQUENCY: MTHLY
11_AS_OF_DATE: SEE BLK 16
12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16
13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16
addressee1: 417 SCMS
draft1:
reg1: 1
repro1:
addressee2: 6040 Gum Lane
draft2:
reg2:
repro2:
addressee3: Bldg 1216
draft3:
reg3:
repro3:
addressee4: Hill AFB, UT
draft4:
reg4:
repro4:
addressee5: 84056
draft5:
reg5:
repro5:
addressee6: Attn: Tawny Gallegos
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: SEE BLK 16
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

tawny.gallegos@us.af.mil julie.hess@us.af.mil

3. Block 9:

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administrative or operational Use). (February 2019). Other requests for this document shall be referred to (417th SCMS/GUMD).

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

17_PRICE_GROUP: NSP
ESTIMATED_TOTAL_PRICE: 0.00
G_PREPARED_BY:
H_DATE: 7-Dec-2023
1_APPROVED_BY:
J_DATE: 7-Dec-2023
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A/B/C/D/E
xTDP: Off
xTM: Off
OTHER: PSSS
DSYSTEMITEM: F-15 Shimmy Damper
E_CONTRACTPR_NO: FD20202300839
FCONTRACTOR:
16_REMARKS_Continued:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE : For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17. For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3 Paragraph 17.

4. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 10 (ten) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS),

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report"

5. Block B & 1: The contractor shall generate data in support of the following performance period(s). Note: The contractor SHALL NOT generate data in support of an option until a receipt of a contract modification that exercises the option and obligates additional funding.

Exhibit Performance Period A Basic B Option 1 C Option 2 D Option 3 E Option 4

Page2: 2
of_pages: 2
Reset:
2023-12-07T12:45:05-0700
GALLEGOS.TAWNY.JEAN.1504119501
2023-12-07T12:45:36-0700
GALLEGOS.TAWNY.JEAN.1504119501

File details come from the government source that posted it. Updated .