EVALUATION_Criteria.docx
DOCX document 16 KB Posted
- Attached to
- Architectural and Engineering Services for Phase II and III of the Volusia County Fairgrounds Master Plan
- Solicitation number
- 25-SQ-91LL
- Issued by
- Volusia County, Florida
About this file
The document is an Evaluation Criteria file for an Architectural and Engineering Services contract with Volusia County, Florida, detailing the scoring methodology for proposal evaluation. The contract opportunity seeks a qualified firm to provide comprehensive design and engineering services for Phases II and III of the Fairgrounds Master Plan, with four primary evaluation criteria: professional licenses/certifications (20% weight), project approach (40% weight), previous contract performance (20% weight), and quality and budget control (20% weight). Each criterion will be scored on a 0-5 point scale, with a total possible score of 20 points.
The project involves enhancing the Volusia County Fairgrounds through two distinct phases: Phase II focuses on improving functionality, accessibility, visibility, and environmental sustainability across five primary components, while Phase III centers on designing a versatile multi-use facility capable of accommodating diverse events and expanding community service capabilities. The evaluation process emphasizes not just technical capabilities, but also the bidder's historical performance, proposed methodology, and demonstrated ability to manage complex design and engineering projects within specified time and budget constraints.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION Criteria/Scoring
1. License, Certifications, etc.
Professional license, certifications, qualifications, and years’ experience of the staff for both the prime and sub consultants and key personnel as presented by resumes, education, and training.
Scoring Method:
0-5 Points Weight (Points):
20 (20% of Total)
2. Project Approach Overall project approach to support the needs and objectives of the project.
Scoring Method:
0-5 Points Weight (Points):
40 (40% of Total)
3. Previous Contracts and past performance with a minimum of Five (5) years of relevant experience Quality of performance for previous contracts and/or services.
Scoring Method:
0-5 Points
4. Quality and Budget Control Ability to meet time and budget requirements and quality control.
Scoring Method:
0-5 Points
File details come from the government source that posted it. Updated .