EV00000988_Amendment_No.1.pdf

PDF 613 KB Posted

Attached to
Testing Services
Solicitation number
EV00000988
Issued by
Oklahoma County, Hobart City, Oklahoma

About this file

This Amendment No. 1 to Solicitation EV00000988 is issued by the Office of Management and Enterprise Services (OMES) Central Purchasing division on behalf of the Oklahoma Construction Industries Board and provides clarifications to the examination testing services solicitation through responses to 36 vendor questions submitted during the Q&A period that closed November 9, 2026. The amendment addresses the scope of work for developing, managing, and administering license examination programs for plumbing, electrical, mechanical, roofing, and home inspector trades in Oklahoma. Key clarifications include confirmation that the Board does not own existing exam content and will not share proprietary item banks with new vendors; the Board utilizes a pool-based examination process that generates unique exams for each test taker; current testing sites are located in Enid, Lawton, McAlester, Norman, Oklahoma City (two locations), Ponca City, Tulsa (three locations), Weatherford, and Woodward, with capability for national and international testing; the Residential Plumbing Contractor and Natural Gas Technical Trade exam contains 85 questions limited to 180 minutes, while the Residential Roofing Contractor Endorsement Technical Trade exam contains 50 questions limited to 150 minutes; the anticipated contract award date is January 27, 2027, with the current contract expiring February 15, 2027; and the contract term is one year with four one-year renewal options. Pricing evaluation focuses solely on ensuring proposed fees remain within statutory limits, with all other evaluation criteria scored on a 0-10 point scale without weighting, and mandatory requirements evaluated as pass/fail. The amendment confirms that examination fees are capped at $200.00 per examination; no ancillary fees beyond those listed in Board statutes and rules are permitted; background check requirements apply only to contractor personnel with physical access to Board property or systems; the vendor is responsible for exam development, subject matter expert identification, and psychometric analysis; Board personnel are not available to participate as subject matter experts in content development; and bidders must submit proposals through the Oklahoma Supplier Portal by the December 1, 2026 deadline. The document includes exam performance statistics for calendar years 2023, 2024, and 2025, showing pass/fail rates, no-shows, and retests by exam type, as well as a 24-page list of candidate home zip codes and corresponding testing center locations from October 1 through November 10, 2026.

View the file

Other files

File Type Posted
04_Attachment_C_-_Agency_Terms.docx DOCX document
06_Exhibit_2_-_Exam_Types.docx DOCX document
01_Agency-Bid-Instructions.docx DOCX document
03_Attachment_B_-_General_Terms.docx DOCX document
02_Attachment_A_-_Purpose.docx DOCX document
07_Exhibit_3_-_Exam_Stats.docx DOCX document
09_OMESformCP076.pdf PDF
05_Exhibit_1_-_Requirements_and_Scope.docx DOCX document
08_Exhibit_4_-_Pricing.docx DOCX document
10_OMESformCP004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMES FORM CP011 (11/2024) AMENDMENT OF SOLICITATION | Page 1 of 1

Central Purchasing

AMENDMENT OF SOLICITATION

GENERAL INFORMATION

Date of issuance 11/19/2026 Solicitation/Event # EV00000988

Requisition # 1700001581 Amendment #1

Hour and date specified for receipt of offers is changed:

No Yes, to this date: and this time: CST

Pursuant to OAC 260:115-7-30(d), this document shall serve as official notice of amendment to the solicitation identified above. Such notice is being provided to all suppliers to which the original solicitation was sent.

Suppliers submitting bids or quotations shall acknowledge receipt of this solicitation amendment prior to the hour and date specified in the solicitation by doing one of the following:

1. Sign and return a copy of this amendment with the solicitation response being submitted.

2. If the supplier has already submitted a response, this acknowledgement must be signed and returned before the solicitation deadline. All amendment acknowledgements submitted separately shall have the solicitation number and bid opening date printed clearly in the subject line of the email.

Return to:

Contracting officer Luan Pham

Phone

Email Luan.Pham@omes.ok.gov

DESCRIPTION OF AMENDMENT

a. This is to incorporate the following:

On behalf of the State of Oklahoma, OMES gives notice of:

• On behalf of the State of Oklahoma, the Office of Management and Enterprise Services (OMES) gives notice of the following questions concerning this solicitation, received during the Q&A period, which closed on 11/9/2026 at 3PM.

All the vendor questions we received and procurement/agency responses for those questions are on the following page.

b. All other terms and conditions remain unchanged.

SIGNATURES

Supplier company name

Date

Authorized representative name

Authorized representative signature

Discussion Forum Report

Date Of Issuance: 10/14/2026 Solicitation No. EV00000988

ISSUED FROM:

Luan Pham Luan.Pham@omes.ok.gov Contracting Officer Phone Number Email Address

Questions/Answers

Q 1. 1. Section 3.3. states "Any applicant who fails one of the two sections of the examination required for licensure/endorsement as a Contractor must only retake the section the applicant failed." Does the Board want this process to remain the same, or is it open to a different testing/retesting process?

RFP Section 3.3 reflects the wording in the current Administrative Rules.

2. Section 5.3.1. Examination Development states that "the selected bidder shall develop an examination question bank, both skilled technical trade and business and law sections, for each license/endorsement type." Does the Board own its own exam content?

If the contract is awarded to a new vendor, will the existing item banks be shared with/ provided to the new vendor?

The Board does not own its own exam content. Section 5.3.1. states that “the SELECT BIDDER SHALL DEVELOP AN EXAMINATION QUESTION BANK…” because that is what exam development requires and what is expected of the selected bidder. The current bank being used by the current vendor is proprietary and will not be shared.

3. Section 5.3.2 provides exam summary data for 2025. Can the Board please also provide exam summary data for 2023 and 2024? Can the Board also provide additional information on # of total registrations, pass/fail rates, no shows, retests, etc.?

See attachments.

4. Section 5.3.3. For the open book exams, is the Board open to a change in process where candidates cannot bring in their own materials into the testing center, but rather the reference materials are available for all candidates as pdf documents embedded within the testing platform?

No

5. Section 5.5. Examination Questions states "All information, documents, records, materials, software and software documentation pertaining to work required by the contract shall be made available upon request to the Board or its representatives for review, inspection, and if desired, reproduction." If the contract is awarded to a new vendor, will all item banks for all trades be made available to a new vendor?

6. Section 8.5. Describe the procedures for the development and management of Bidder's bank of examination questions, including the methods Bidder will employ to statistically analyze the performance of each question, and each examination as a whole, in order to provide reasonable assurance of the validity of each question, as well as the validity of the entire examination. Will item and exam statistics, reliability indices, and validation information (job analysis data and/or technical reports) for each examination be made available to the new vendor?

No, psychometrics is a key responsibility of the exam developer.

7. Section 8.8. Provide a short paragraph on your procedures for working with clients to obtain clients' approval of exam questions.

Does the Board have (internal or external) subject matter experts available to assist with item review and selection?

Board and Committee members have final approval of examinations after review of already developed exam items. They are not subject matter experts for purposes of exam development.

Q 2. 1. When will the Board’s answers to these questions submitted for

RFP # EV00000988 be available? The direction of our solution is largely dependent on how the Board responds to these clarification questions.

As soon as possible.

2. What is the anticipated contract award date?

While there are a lot of unknown variables that could change the date, the goal is January 27, 2027.

3. When will the first examination administrations need to begin under the new contract?

There is not a specific date, but the current contract ends on 02/15/2027, and while there is a possibility of an extension there is no guarantee how long the extension would be granted for. The goal is to avoid any time lapse of exam availability to test takers.

4. Would the Board please provide the evaluation criteria and maximum point allocation/percentage weighting of each criterion?

Mandatory requirements are scored as a pass/fail. All others are on a point scale from 0-10 and not weighted.

5. For the pricing portion of the evaluation, what methodology will be used to determine points related to pricing? How will an offeror’s total cost be calculated, for evaluation in the cost evaluation formula?

The only evaluation points related to pricing are related to making sure the pricing stays within the scope of the statute provided in the

RFP.

6. What is the maximum file size for uploads to the Oklahoma Supplier

Portal?

The system will let you know if a file is too big to upload.

7. On the Oklahoma Supplier Portal submission page for this RFP, a section requires for “Unit Bid Price” to be input. Since a pricing document will be provided with our bid, and there may be different fees for different exams, what would the Board like us to input for “Unit Bid Price”? (E.g., we have been directed to input 0 or 1 in past bids as a placeholder; is that how we may proceed? If not, please advise.)

Only the pricing listed in Exhibit 4 – Pricing will be considered. Any price can be listed as “Unit Bid Price” on the supplier portal.

8. How is the examination content currently being developed for each exam line? Is a single vendor currently developing the content for the exam? Are multiple vendors developing the content for the exams? If so, which vendors?

The current vendor has developed the exam bank currently used.

9. Are any third parties currently involved in the content development process? If so, who are those third parties? Will they continue to be involved in the exam development process going forward?

No, there are no subcontractors or multiple vendors.

10. How often does the current vendor perform job analyses for each exam currently offered? What is the expected frequency for job analyses to be conducted?

As statutory and regulatory/code changes are made, the vendor is expected to update test banks accordingly. Also, when new exam categories or reference materials are added or changed.

11. When were the most recent job analyses held for each occupation and exam line?

Not sure of the various times but most exams were analyzed and updated for the September 14, 2026, adoption of the updated “I”codes.

12. What procedures are the Board’s incumbent vendor using for pre-testing, item review, and form updates?

Candidates are approved to take exams by the Board, and those candidates are communicated to the vendor. We are unsure of what the current vendors internal procedures are.

13. What is the current schedule for ongoing content and exam reviews for each exam line by the incumbent exam provider? Does the Board wish to change that review schedule? If so, how frequently will each exam line need to be reviewed? Will some exam lines be reviewed under different schedules due to, say, lower annual exam volumes than others?

Exam questions are updated when statutory, regulatory or changes or updates to reference materials are made. Test questions are also reviewed by a subcommittee as needed for effectiveness and to evaluate if changes are needed.

14. Is the Mechanical Business and Law section of the Mechanical

Trades combination exams the same exam for all of the trade exam lines it compliments? In other words, is the content of the Mechanical Business and Law section always the same, regardless of which trade exam it's paired with? If so, is each exam published separately in the candidate delivery for reporting purposes? Is this the same for the Plumbing Business and Law and the Roofing Business and Law exams?

The Business and Law portion of the Mechanical Contractor exams cover the same reference materials. Not sure about exam publication as current vendor pulls items from pool so each exam is different. Business and Law portions of Contractor exams are over the same reference materials with variation for appropriate industry rules/regulations.

15. Does the Board currently own all, some, or none of its Oklahoma-specific test questions? Will that content be shared with the selected vendor? If so, please provide the following information:

a. How many state-specific items does the Board own for each individual license line that can be shared with the selected test vendor?

b. Are the state-specific items currently linked to test outline specifications, blueprints, or domains? Are these also licensed or owned by the Board? If so, will these also be shared with the selected vendor?

c. Will state-specific item banks be provided in a specific electronic format? Please specify the format.

d. Do any state-specific items use graphics or audio files? If so, for which exams and how many?

e. Are item statistics available for current state-specific items? If so, will the Board provide the statistics for each item?

f. Are the statistics Rasch (IRT) or Classical (p-values)?

The Board does not own its own exam content, and the content will not be shared with the selected vendor.

16. Regarding development of state-specific items:

g. Is the Board utilizing in-state, out-of-state, or both subject matter experts (SMEs) to assist with exam content development?

h. Does the Board or the vendor identify SMEs for the content development processes?

i. Will the Board’s personnel be available to participate in the content development processes?

The selected vendor is responsible for exam development, the SME’s, and the psychometrics used to develop those exams. Please see sections 8.6 and 8.7 of Exhibit 1. As stated in 5.3.1. the Board shall have final approval on the examination content for each license/endorsement type. The Board’s personnel is not available to participate as SME’s in the content development process.

17. Regarding exam delivery and exam form (aka exam version) development, does the Board utilize fixed-length linear forms (i.e., a set number of fixed exam forms or versions administered at random to candidates), or does it utilize an automated test assembly (ATA) pool-based process that dynamically generates unique exam forms for each candidate? If fixed linear forms are used, how many active forms are concurrently available for administration per exam line at any given time?

It’s our understanding the current vendor uses a pool-based process that generates unique exams for each test taker.

18. Do candidates only test in the state of Oklahoma? Do any candidates ever test in surrounding states or nationally?

The current vendor can provide testing sites nationally and internationally.

19. Can the Board please provide a list of all current testing sites available to exam candidates within and outside the state?

Currently contracted testing sites are: Enid, Lawton, McAlester, Norman, Oklahoma City (x2), Ponca City, Tulsa (x3), Weatherford and Woodward with ability to test outside of Oklahoma at current vendors sites using same proctoring requirements.

20. What are the expected annual exam volumes for the Residential

Plumbing Contractor and Natural Gas Technical Trade (*new exam) and the Residential Roofing Contractor Endorsement Technical Trade (*new exam)? Can the Board confirm that both of these exams are 180 minutes? Can the Board confirm the number of questions on each exam?

There is no way to predict what the exam volumes will be for any of the exams above. The Residential Plumbing Contractor and Natural Gas Technical Trade exam has 85 questions, limited to 180 minutes.

The Residential Roofing Contractor Endorsement Technical Trade exam has 50 questions limited to 150 minutes.

21. For each of the Board’s exams, can you please provide a specific list of the open book supplements that candidates use to take each exam?

They are too numerous to list here. The approved reference materials are listed in the current vendor candidate bulletin which can be found on CIB’s website under “Testing/Exam Information”.

22. Can any of the open book materials be built into the exam as PDF

(.pdf) references in lieu of being brought into the test center in physical format?

23. Can the Board please provide a list of file formats and images that are required to be displayed within the electronic testing system for each examination delivered?

24. Does the Board have any specific rules pertaining to what may or may not be brought into a test center for an open-book exam? Can the Board please confirm that all books or supplements that candidates use to take the exams are bound materials (i.e., not loose-leaf papers)?

There are restrictions on what materials may be used. Please see answer to question number 21 above for current materials allowed.

25. Could the Board provide an Excel file containing the zip codes of the testing candidates for 2024 and 2025? Specifically, this Excel file would contain records that reflect the year of testing and the corresponding home address zip code of each candidate that tested (2024, 73099, etc.; 2025, 73099, etc.). If this information is not available, could the Board provide candidate volume by test center location, city, metro area, county, or other geographical category?

No, we cannot provide an excel file containing the zip codes of the testing candidates. However, attached is a 24 page list of zip codes

vs. testing center data from October 1, 2026 through November 10, 2026.

26. Could the Board provide the candidate volume for exams that were retaken during each of the past two years, broken down by exam type?

Please see re-test information in Q1 - #3.

27. Could the Board specify the number of each type of accommodation provided in each of the past two years?

No, we cannot specify, however, vendors are expected to comply with the Americans with Disabilities Act (ADA) of 1990, and exam accommodations must be made to meet a candidate’s needs.

28. Could the Board specify the time allotted for the administration of each exam?

Time allowed varies by exam. Due to the volume of the exams, see current vendors candidate bulletin which can be found on CIB’s website under “Testing/Exam Information” for current exam/time information.

29. Does the Board understand that the contractor will retain and own solely all rights, title and interest, including copyrights, of existing proprietary computer programs, source code, materials, and intellectual property that have been previously developed by the contractor or its 3rd party licensor (“Contractor Intellectual Property”), some of which may be trade secret, copyright, patent and trademark protected, and that any changes or modifications to the Contractor Intellectual Property suggested or required by the Board are hereby assigned by the Board to the contractor, and the contractor will own solely all rights, title, and interest, including copyrights, in such changes and modifications?

No, the Board does not agree with the characterization of this question and requests sufficient information and explanation upon which this question is based in order to present for legal review.

30. Does the Board understand and agree that if Board-specific items are developed for the Board then they shall become the property of the Board, and the contractor will continue to be the exclusive owner of existing test items provided or derived from the contractor’s general and state item banks ("Root Items")?

Presuming the answer to this question is yes, does the Board agree that for any items created or derived from Root Items or jointly developed under the Agreement, the Board shall have a non-exclusive and royalty-free license to use these items only in connection with the Board’s testing program?

No, the Board does not agree with the characterization of this question and requests sufficient information and explanation upon which this question is based in order to present for legal review.

31. Can the Board confirm that the background check requirements apply only to contractor personnel who will physically access the Board’s property or systems (e.g., on-site work or direct access to the Board’s IT infrastructure), and not to all personnel involved in the project remotely or indirectly?

See Section 14 of Attachment B. For purposes of this RFP, no successful vendor will have access to the Board’s IT infrastructure.

32. If the vendor has implemented a comprehensive, industry-standard background check program that applies to all of its employees prior to the start of their employment, will the Board agree that that background check process will satisfy any background screening requirements under this RFP and that additional background checks will not be required for employees assigned to this engagement?

The agency will review the background check information to see if it is sufficient. We still reserve the right to request additional background checks if needed.

33. Are any portion(s) of any examination fees remitted back to the Board? Or, does the vendor retain the full fee amounts?

No, CIB does not receive any fees from examinations.

34. Will the Board require any portion of the exam fee to be remitted to the Examination Board of Professional Home Inspectors for use of the National Home Inspector Examination? If so, in what amount?

No, the Board has no such requirement and no knowledge if the “EBPHI” has such requirement.

35. Does the Board require an examination eligibility approval for every candidate examination listed within this RFP? In other words, does the Board pre-authorize which candidates are eligible to test, and then pass the authorization information for those candidates on to the test administrator? Or does it work differently? If so, please explain.

Yes, the Board does require and provide examination eligibility and approval for every candidate and examination listed. The Board provides communication to the candidate about their approval to test, and a full list of eligible candidates to test and which exams they are eligible for are provided to the vendor.

36. What is the current percentage of candidates scheduling exams online vs. the percentage of candidates scheduling exams via telephone? Could the Board also please provide the annual call volume for 2025?

While we are unable to provide the number of exams scheduled online versus by telephone, here is the annual call volume from 2025:

2025 Month-over-Month Call Volume

Month Call Volume

January 208 February 197 March 247 April 238 May 231 June 230 July 196 August 217 September 187 October 185 November 171 December 158 2025 Total 2,465

37. Will the Board permit a subcontractor or subcontractors to conduct development work on the Board’s exams in collaboration with the selected vendor? Would the Board permit the selected vendor’s subcontractor to provide or facilitate a JTA for the development of the Board’s content?

Please see Exhibit 1, Section 7.1.

Q 3. 1. Timetable. What is the anticipated award date?

While there are a lot of unknown variables that could change the date, the goal is January 27, 2027.

2. Timetable. What is the expected start date for exam administration to begin on this new contract?

The goal is to avoid any time lapse of exam availability to test takers.

The current contract expires on 02-15-2027. With agreement the contract with current vendor could be extended. Expected start date would depend on who the selected vendor is, how long it takes to develop and approve the exams and how soon testing services could begin after award.

3. General. Is remote proctoring an option for exam delivery?

See Section 5.3.17. of Exhibit 1 which states “The Bidder shall monitor and physically proctor test sites during testing”.

4. Attachment A – Purpose, Section 2, Solicitation Criteria: Please share the scoring formula or evaluation criteria weighting to determine “best value”. How is price weighted in comparison to Mandatory Requirements and Response to Specifications?

Mandatory requirements are scored as a pass/fail. All others are on a point scale from 0-10 and not weighted.

5. Attachment A – Purpose, Section 2, Solicitation Criteria – Pricing Evaluation. Please explain how the proposed fees will be calculated and scored for the price evaluation. Will all fee lines be evaluated, and will they be averaged, weighted using the examination volumes in Exhibit 3, or evaluated using another method? If only certain fee lines will be evaluated, please identify them. Please also specify the percentage of the total evaluation score assigned to price.

The only evaluation points related to pricing are related to making sure the pricing stays within the scope of the statute provided in the RFP.

Mandatory requirements are scored as a pass/fail. All others are on a point scale from 0-10 and not weighted.

6. Exhibit 1 & Exhibit 4, Pricing and Ancillary Fees. Please clarify whether any ancillary fees, such as cancellation, rescheduling, or no-show fees, are permitted in addition to the examination administration fee. Exhibit 1, Section 8.28 prohibits additional fees, while Exhibit 4, Pricing, requests information on other fees and cancellation or no-show policies. If ancillary fees are permitted, please identify any applicable restrictions.

Any fees not listed in the CIB statutes and rules are not allowed.

7. Agency Bid Instructions, Cover Page. The cover page classifies this bid as having no IT components. With this in mind, please confirm that neither a VPAT nor an ATO is required for this bid.

VPAT/ATO is not required for this bid.

8. Agency Bid Instructions, Section 6.1. Bidders are instructed to not include duplicative content amongst multiple sections. However, Agency Bid Instructions, Section 7.2, Executive Summary and Company Information, and Exhibit 1, Section 8.1, Management Summary, request overlapping company information. Please clarify:

a. Should bidders repeat this information in both sections or provide it once and cross-reference it in the other section. Please also confirm whether both sections will be scored and whether cross-referencing will satisfy both requirements without affecting scoring.

Please answer the questions listed on the Exhibit 1 instead of the Bid Instructions.

b. Where other requirements overlap, including Exhibit 1, Section 5- 7, may bidders provide a summary response to each requirement and cross-reference the section containing the detailed response? Please confirm whether this approach will fully satisfy the applicable requirements without affecting compliance or scoring.

The Board has no preference and will accept either.

9. Agency Bid Instructions, Section 8.1, p. 7. Please confirm whether bidders may submit the complete proposal through the Oklahoma Supplier Portal and also email a courtesy copy to the contracting officer, with the portal submission serving as the official submission.

Only the bid documents submitted through the event portal will be considered. It is not necessary to email a copy to the contracting officer.

10. Exhibit 1, Section 8.2, Implementation Plan. Please confirm that the selected vendor must be an EBPHI-approved provider to deliver and administer the National Home Inspector Examination.

The successful vendor must be able to access the National Home Inspectors Examination according to EBPHI requirements.

11. Exhibit 1 & Exhibit 2, Testing Site Locations. Exhibit 1 requires testing sites in Oklahoma City, Ponca City, Tulsa, Lawton, Woodward, and McAlester, while Exhibit 2 Mandatory Requirements permits sites within 10 miles of those cities. Please confirm whether sites outside city limits but within 10 miles are acceptable. If so, please specify how the 10-mile distance is measured.

Testing sites would need to be within a 10-mile radius of the listed cities.

12. Exhibit 1, Section 8.23 – Industry Experience and Resumes.

a. Resumes. Please confirm that you are requesting and evaluating resumes only for exam developers and psychometricians, and not for any staff outside of examination development?

Yes

b. Industry Experience. Please confirm that you are only requesting the “total number of years' experience” from exam development staff to be included in this total, and that industry experience of other key project team staff (e.g. Account Manager, Project Manager, Client Service) is not being evaluated.

Yes

13. Exhibit 1, Section 8.1 & Agency Bid Instructions, Section 7.2.

Please confirm what is meant by “average client size (i.e., employee count)”. As bidders may not have access to clients’ employee counts, please clarify the intent of this requirement and whether examination program size, measured by annual candidate or examination volumes, may be provided instead.

The intent of the requirement is to determine whether a bidder has the necessary experience to handle the number of exams and volume of test takers which can be explained using examination program size by license type and category, annual candidate or examination volumes by license type and category, etc.

Page1

From: 1/1/2023 To: 12/31/2023

Passed % Passed Failed % Failed Exams Total 163 52.5% 147 47.4% 310 350 98 51.5% 92 48.4% 190 210 84 65.6% 44 34.3% 128 143

185 42.1% 254 57.8% 439 465 192 57.4% 142 42.5% 334 351

5 83.3% 1 16.6% 6 7 204 65.5% 107 34.4% 311 341 72 69.2% 32 30.7% 104 111 11 25.5% 32 74.4% 43 52 1 100.0% 0 0.0% 1 1

10 66.6% 5 33.3% 15 16 119 53.8% 102 46.1% 221 244 134 60.9% 86 39.0% 220 243 255 41.6% 357 58.3% 612 646

4 100.0% 0 0.0% 4 5 31 96.8% 1 3.1% 32 32 1 50.0% 1 50.0% 2 3 4 80.0% 1 20.0% 5 7 1 100.0% 0 0.0% 1 1 1 50.0% 1 50.0% 2 2

36 50.7% 35 49.2% 71 92 28 33.3% 56 66.6% 84 106 0 0.0% 1 100.0% 1 1

21 50.0% 21 50.0% 42 42 11 37.9% 18 62.0% 29 34 95 33.4% 189 66.5% 284 309

142 48.7% 149 51.2% 291 335 321 37.7% 530 62.2% 851 922

2,229 48.1% 2,404 51.8% 4,633 5,071 Unlimited Electrical Jrny(PRE 11/01/2024) 71

Totals 438

Res Electrical Contractor(PRE 11/01/2024) 5 Res Electrical Jrny(PRE 11/01/2024) 25 Unlimited Electrical Con(PRE 11/01/2024) 44

OK Roofing Contractor Commercial Endorsement 22 OK Sheet Metal Contractor Technical 0 OK Sheet Metal Journeyman 0

OK Residential Journeyman Plumbing and Natural Gas 0 OK Residential Journeyman Plumbing and Natural Gas(PRE 01/23/2025) 0 OK Roofing Business and Law 21

OK Process Piping Journeyman Technical 0 OK Refrigeration Contractor 1 OK Refrigeration Journeyman 2

OK Plumbing Con And Gas(PRE 10/08/2026) 23 OK Plumbing Jrny and Gas(PRE 10/08/2026) 34 OK Process Piping Contractor Technical 1

OK Natural Gas Contractor Technical 0 OK Natural Gas Journeyman Technical 1 OK Plumbing Bus and Law(PRE 11/01/2026) 23

Mechanical Bus and Law 30 OK Limited Residential Installer 7 OK Limited Residential Journeyman - Mechanical 9

HVACR Jrny Limited 26 HVACR Jrny Unlimited 17 Limited Electrical Con(PRE 11/01/2024) 1

Electrical Bus and Law(PRE 11/01/2024) 40 HVACR Con Limited 20 HVACR Con Unlimited 15

Portion Pass Report

OKLAHOMA CONSTRUCTION INDUSTRIES BOARD

Date: 11/16/2026

Portion No Shows

From: 1/1/2024 To: 12/31/2024

Passed % Passed Failed % Failed Exams Total 34 57.6% 25 42.3% 59 66

129 48.8% 135 51.1% 264 286 89 52.9% 79 47.0% 168 185 95 65.9% 49 34.0% 144 156

234 47.4% 259 52.5% 493 527 187 51.3% 177 48.6% 364 384

0 0.0% 0 0.0% 0 1 0 0.0% 1 100.0% 1 1 2 66.6% 1 33.3% 3 4

190 67.1% 93 32.8% 283 314 66 55.9% 52 44.0% 118 122 15 31.9% 32 68.0% 47 53 2 100.0% 0 0.0% 2 4

19 82.6% 4 17.3% 23 23 95 54.2% 80 45.7% 175 176 24 60.0% 16 40.0% 40 57

123 56.4% 95 43.5% 218 241 244 39.1% 379 60.8% 623 649

2 50.0% 2 50.0% 4 4 27 79.4% 7 20.5% 34 35 1 100.0% 0 0.0% 1 1 1 50.0% 1 50.0% 2 3 0 0.0% 1 100.0% 1 2 0 0.0% 3 100.0% 3 3

42 43.2% 55 56.7% 97 114 29 22.3% 101 77.6% 130 153 2 66.6% 1 33.3% 3 3

15 36.5% 26 63.4% 41 45 0 0.0% 0 0.0% 0 2 3 50.0% 3 50.0% 6 6 9 32.1% 19 67.8% 28 32

27 34.6% 51 65.3% 78 85 118 37.8% 194 62.1% 312 325 28 48.2% 30 51.7% 58 67

122 46.3% 141 53.6% 263 291 89 43.8% 114 56.1% 203 227

315 39.3% 486 60.6% 801 874 2,378 46.7% 2,712 53.2% 5,090 5,521

Unlimited Electrical Jrny(PRE 11/01/2024) 73 Totals 431

Unlimited Electrical Con(PRE 03/27/2025) 9 Unlimited Electrical Con(PRE 11/01/2024) 28 Unlimited Electrical Jrny(PRE 03/27/2025) 24

Res Electrical Contractor(PRE 11/01/2024) 4 Res Electrical Jrny(PRE 03/27/2025) 7 Res Electrical Jrny(PRE 11/01/2024) 13

OK Sheet Metal Journeyman 4 Res Electrical Contractor 2 Res Electrical Contractor(PRE 03/27/2025) 0

OK Roofing Business and Law 17 OK Roofing Contractor Commercial Endorsement 23 OK Sheet Metal Contractor Technical 0

OK Refrigeration Journeyman 1 OK Residential Journeyman Plumbing and Natural Gas 1 OK Residential Journeyman Plumbing and Natural Gas(PRE 01/23/2025) 0

OK Process Piping Contractor Technical 0 OK Process Piping Journeyman Technical 1 OK Refrigeration Contractor 0

OK Plumbing Bus and Law(PRE 11/01/2026) 17 OK Plumbing Con And Gas(PRE 10/08/2026) 23 OK Plumbing Jrny and Gas(PRE 10/08/2026) 26

OK Natural Gas Contractor Technical 2 OK Natural Gas Journeyman Technical 0 OK Plumbing Bus and Law 1

Mechanical Bus and Law 31 OK Limited Residential Installer 4 OK Limited Residential Journeyman - Mechanical 6

Limited Electrical Con 1 Limited Electrical Con(PRE 03/27/2025) 0 Limited Electrical Con(PRE 11/01/2024) 1

HVACR Con Unlimited 12 HVACR Jrny Limited 34 HVACR Jrny Unlimited 20

Electrical Bus and Law 7 Electrical Bus and Law(PRE 11/01/2024) 22 HVACR Con Limited 17

Portion Pass Report

OKLAHOMA CONSTRUCTION INDUSTRIES BOARD

From: 1/1/2025 To: 12/31/2025

Passed % Passed Failed % Failed Exams Total 189 60.1% 125 39.8% 314 349 75 50.3% 74 49.6% 149 174 87 65.9% 45 34.0% 132 142

221 44.5% 275 55.4% 496 522 200 55.2% 162 44.7% 362 377 13 86.6% 2 13.3% 15 16 5 71.4% 2 28.5% 7 7

181 63.2% 105 36.7% 286 316 63 59.4% 43 40.5% 106 113 15 39.4% 23 60.5% 38 41 1 100.0% 0 0.0% 1 1

11 100.0% 0 0.0% 11 11 145 53.3% 127 46.6% 272 273

0 0.0% 0 0.0% 0 29 147 53.6% 127 46.3% 274 308 267 41.7% 372 58.2% 639 680

4 66.6% 2 33.3% 6 6 27 90.0% 3 10.0% 30 30 2 66.6% 1 33.3% 3 3 1 100.0% 0 0.0% 1 1 0 0.0% 4 100.0% 4 4 1 33.3% 2 66.6% 3 3 0 0.0% 0 0.0% 0 1

38 40.4% 56 59.5% 94 116 37 31.3% 81 68.6% 118 149 18 40.9% 26 59.0% 44 45 14 58.3% 10 41.6% 24 28 7 63.6% 4 36.3% 11 11

104 32.3% 217 67.6% 321 344 30 35.2% 55 64.7% 85 95

115 55.2% 93 44.7% 208 239 30 44.1% 38 55.8% 68 79

324 33.9% 629 66.0% 953 1037 88 40.3% 130 59.6% 218 236

2,460 46.4% 2,833 53.5% 5,293 5,786 Unlimited Electrical Jrny(PRE 03/27/2025) 18

Totals 493

Unlimited Electrical Con 31 Unlimited Electrical Con(PRE 03/27/2025) 11 Unlimited Electrical Jrny 84

Res Electrical Contractor(PRE 03/27/2025) 0 Res Electrical Jrny 23 Res Electrical Jrny(PRE 03/27/2025) 10

OK Roofing Contractor Commercial Endorsement 31 OK Sheet Metal Journeyman 1 Res Electrical Contractor 4

OK Residential Journeyman Plumbing and Natural Gas 0 OK Residential Journeyman Plumbing and Natural Gas(PRE 11/01/2026) 1 OK Roofing Business and Law 22

OK Refrigeration Contractor 0 OK Refrigeration Journeyman 0 OK Residential Contractor Plumbing and Natural Gas 0

OK Plumbing Jrny and Gas(PRE 10/08/2026) 41 OK Process Piping Contractor Technical 0 OK Process Piping Journeyman Technical 0

OK Plumbing Bus and Law 1 OK Plumbing Bus and Law(PRE 11/01/2026) 29 OK Plumbing Con And Gas(PRE 10/08/2026) 34

OK Limited Residential Journeyman - Mechanical 3 OK Natural Gas Contractor Technical 0 OK Natural Gas Journeyman Technical 0

Limited Electrical Con(PRE 03/27/2025) 0 Mechanical Bus and Law 30 OK Limited Residential Installer 7

HVACR Jrny Limited 26 HVACR Jrny Unlimited 15 Limited Electrical Con 1

Electrical Bus and Law 35 HVACR Con Limited 25 HVACR Con Unlimited 10

Portion Pass Report

OKLAHOMA CONSTRUCTION INDUSTRIES BOARD

Home Zip Code vs. Testing Center from 10-1-26 through 11-10-26

Primary Zip Test Center

74955 Tulsa - Oklahoma Safety Council

73160 OKLAHOMA CITY

73160 OKLAHOMA CITY

73082 Tulsa - Oklahoma Safety

Council

73034-6919 OKLAHOMA CITY

74012 TULSA (EAST 51ST)

74012 TULSA (EAST 51ST)

73068 OKLAHOMA CITY

73068 OKLAHOMA CITY

74112 Tulsa - Christiansen Aviation

Inc.

73114 OKLAHOMA CITY

74965 Bentonville - Legends Air Center

73078 Oklahoma City - Oklahoma Safety Council

74857 OKLAHOMA CITY

73054 OKLAHOMA CITY

73054 OKLAHOMA CITY

72761 Tulsa - Oklahoma Safety Council

72761 Tulsa - Oklahoma Safety Council

76002 OKLAHOMA CITY

73089 OKLAHOMA CITY

73089 OKLAHOMA CITY

72704 TULSA (EAST 51ST)

51250 TULSA (EAST 51ST)

74855 Oklahoma City - Oklahoma

Safety Council

73044 OKLAHOMA CITY

58436 BISMARCK

58436 BISMARCK

73135 OKLAHOMA CITY

74135 TULSA (EAST 51ST)

74701 Durant - Choctaw Nation of

Oklahoma 73170 Norman - Moore Norman

Technology Center

73505 TULSA (EAST 51ST)

74427 Tulsa - Oklahoma Safety

Council

73051 SFO OR SA DEPT SCHEDULING

ONLY

73159 Oklahoma City - Oklahoma

Safety Council

74883 OKLAHOMA CITY

73090 ATLANTA (Marietta) 74538 Ardmore - Southern Tech

73045 OKLAHOMA CITY

73045 OKLAHOMA CITY

74857 OKLAHOMA CITY

73012 OKLAHOMA CITY

74063 Tulsa - Christiansen Aviation

Inc.

74133 TULSA (EAST 51ST)

29407 CHARLESTON

29407 CHARLESTON

73047 SFO OR SA DEPT SCHEDULING

ONLY

73047 SFO OR SA DEPT SCHEDULING

ONLY

74074 OKLAHOMA CITY

74074 OKLAHOMA CITY

71764 MCALESTER

74966 MCALESTER

74055 Tulsa - Christiansen Aviation Inc.

74875 Oklahoma City - Oklahoma

74070 Tulsa - Christiansen Aviation Inc.

74604 Ponca City - Pioneer Technology Center

73135 Oklahoma City - Oklahoma Safety Council

73114 OKLAHOMA CITY

74435 Tulsa - Oklahoma Safety

Council

74011 TULSA (EAST 51ST)

73056 Enid - Autry Technology Center 74055-6979 Tulsa - Oklahoma Safety

Council

74829 SFO OR SA DEPT SCHEDULING

ONLY

74029 TULSA (EAST 51ST)

73129 OKLAHOMA CITY

74066 Tulsa - Christiansen Aviation

Inc.

73036 Weatherford - Southwestern

Oklahoma State University

74047 TULSA (EAST 51ST)

74047 TULSA (EAST 51ST)

73110 OKLAHOMA CITY

73110 OKLAHOMA CITY

73120 Oklahoma City - Oklahoma

Safety Council 74948 Tulsa - Oklahoma Safety

Council

74075 OKLAHOMA CITY

73052 Wayne - Mid America Technology Center

73052 Wayne - Mid America Technology Center

73102 OKLAHOMA CITY

73064 OKLAHOMA CITY

74063 TULSA (EAST 51ST)

74017 TULSA (EAST 51ST)

73096 Weatherford - Southwestern

Oklahoma State University

74047 TULSA (EAST 51ST)

74066 TULSA (EAST 51ST)

73701 Enid - Autry Technology Center

73044 OKLAHOMA CITY

72941 MCALESTER

72941 MCALESTER

73089 Oklahoma City - Oklahoma

Safety Council

73089 OKLAHOMA CITY

72715 OKLAHOMA CITY

73801 WOODWARD

74011 Tulsa - Oklahoma Safety Council

73644 WOODWARD

73127-7800 Oklahoma City - Oklahoma

Safety Council 74014 Tulsa - Oklahoma Safety

Council

73134 OKLAHOMA CITY

74107 Tulsa - Oklahoma Safety Council

74128 Tulsa - Oklahoma Safety Council

74429 Tulsa - Oklahoma Safety Council

74075 Ponca City - Pioneer Technology Center

74115 TULSA (EAST 51ST)

74134 AMARILLO - TECKLA

74134 AMARILLO - TECKLA

74055 Tulsa - Oklahoma Safety

Council 74055 Tulsa - Oklahoma Safety

Council

73013 OKLAHOMA CITY

73082 Lawton - Great Plains Technology Center

73082 Lawton - Great Plains Technology Center

74012 Tulsa - Christiansen Aviation

73160 OKLAHOMA CITY

84042 Ogden-Ogden Weber Technical College Testing Center

84042 Ogden-Ogden Weber Technical College Testing Center

74857 Oklahoma City - Oklahoma Safety Council

73020 TULSA (EAST 51ST)

74107-9306 TULSA (EAST 51ST)

73533 Lawton - Great Plains

Technology Center

73013 OKLAHOMA CITY

67061 Enid - Autry Technology Center 74337 Tulsa - Oklahoma Safety

Council 74015 Tulsa - Christiansen Aviation

Inc.

74107 TULSA (EAST 51ST)

73132 OKLAHOMA CITY

73119 Oklahoma City - Oklahoma Safety Council

73160 OKLAHOMA CITY

73082 Lawton - Great Plains

Technology Center

74834 OKLAHOMA CITY

74432 MCALESTER

74021 TULSA (EAST 51ST)

74426 MCALESTER

74426 MCALESTER

74701 Durant - Choctaw Nation of Oklahoma

74012 Tulsa - Oklahoma Safety Council

73703 Enid - Autry Technology Center

73118 OKLAHOMA CITY

74105 TULSA (EAST 51ST)

73401 Ardmore - Southern Tech 73401 Ardmore - Southern Tech

73051 SFO OR SA DEPT SCHEDULING

ONLY

74012 Tulsa - Christiansen Aviation

74114-6433 TULSA (EAST 51ST)

74469 Tulsa - Oklahoma Safety

Council

73115-2214 OKLAHOMA CITY

76013 FORT WORTH

74070 Tulsa - Christiansen Aviation Inc.

73945 OKLAHOMA CITY

73072 Oklahoma City - Oklahoma

Safety Council

73034 OKLAHOMA CITY

73034 OKLAHOMA CITY

73051 Oklahoma City - Oklahoma

Safety Council

74127 TULSA (EAST 51ST)

74426 MCALESTER

73170-7611 Oklahoma City - Oklahoma

Safety Council 71730 Durant - Choctaw Nation of

Oklahoma

74017 TULSA (EAST 51ST)

74728 MCALESTER

74728 MCALESTER

74834 OKLAHOMA CITY

74834 OKLAHOMA CITY

73010 Durant - Choctaw Nation of Oklahoma

73078 OKLAHOMA CITY

73078 OKLAHOMA CITY

73112 Oklahoma City - Oklahoma Safety Council

74430 MCALESTER

73162 OKLAHOMA CITY

73122 Oklahoma City - Oklahoma

Safety Council

73110 OKLAHOMA CITY

51250 TULSA (EAST 51ST)

73701 OKLAHOMA CITY

73701 OKLAHOMA CITY

74857 OKLAHOMA CITY

74037 Tulsa - Christiansen Aviation

Inc.

74037 Tulsa - Christiansen Aviation

Inc.

74014 Tulsa - Oklahoma Safety

Council 74014 Tulsa - Oklahoma Safety

Council

74014 TULSA (EAST 51ST)

73644 Weatherford - Southwestern

Oklahoma State University 74145 Tulsa - Oklahoma Safety

Council

73051 SFO OR SA DEPT SCHEDULING

ONLY

74020 Tulsa - Christiansen Aviation

Inc.

73080 Wayne - Mid America

Technology Center

80831 DALLAS/RICHARDSON

80831 DALLAS/RICHARDSON

74055 Tulsa - Oklahoma Safety

Council

74074 OKLAHOMA CITY

74133 TULSA (EAST 51ST)

73110 OKLAHOMA CITY

74429 TULSA (EAST 51ST)

74429 TULSA (EAST 51ST)

74107 TULSA (EAST 51ST)

28031 CHARLOTTE - TYVOLA

EXECUTIVE PARK

28031 CHARLOTTE - TYVOLA

EXECUTIVE PARK

73731 WOODWARD

73008 OKLAHOMA CITY

74429 Tulsa - Oklahoma Safety

Council 74112 Tulsa - Oklahoma Safety

Council

75098 OKLAHOMA CITY

75098 OKLAHOMA CITY

74630 Enid - Autry Technology Center

74055 TULSA (EAST 51ST)

73570 Lawton - Great Plains

Technology Center

66770 SPRINGFIELD MO

73099 Oklahoma City - Oklahoma

Safety Council 73075 Wayne - Mid America

Technology Center 74114 Tulsa - Christiansen Aviation

Inc.

74436 Tulsa - Oklahoma Safety

Council

73075-6407 OKLAHOMA CITY

74953 MCALESTER

74701 Durant - Choctaw Nation of

Oklahoma

74128 TULSA (EAST 51ST)

73505 Lawton - Great Plains

Technology Center

73051 SFO OR SA DEPT SCHEDULING

ONLY

73064 OKLAHOMA CITY

74421 Tulsa - Christiansen Aviation Inc.

73044 OKLAHOMA CITY

74804 OKLAHOMA CITY

74604 Ponca City - Pioneer

Technology Center

73120 OKLAHOMA CITY

73160 OKLAHOMA CITY

74014 Tulsa - Christiansen Aviation

Inc.

73401 OKLAHOMA CITY

73401 OKLAHOMA CITY

74146 TULSA (EAST 51ST)

73067 Lawton - Great Plains Technology Center

74104 TULSA (EAST 51ST)

50009 OLATHE

74014 Tulsa - Oklahoma Safety

72901 MCALESTER

72901 MCALESTER

73034-5300 OKLAHOMA CITY

74729 Durant - Choctaw Nation of

Oklahoma 74127 Tulsa - Oklahoma Safety

Council

74332 TULSA (EAST 51ST)

74332 TULSA (EAST 51ST)

74332 TULSA (EAST 51ST)

73701 Enid - Autry Technology Center 73701 Enid - Autry Technology Center

73036 OKLAHOMA CITY

73051 SFO OR SA DEPT SCHEDULING

ONLY

73044 Oklahoma City - Oklahoma

Safety Council

74037 TULSA (EAST 51ST)

74037 TULSA (EAST 51ST)

74110 TULSA (EAST 51ST)

73170 OKLAHOMA CITY

73170 OKLAHOMA CITY

74145 TULSA (EAST 51ST)

74145 TULSA (EAST 51ST)

74145 TULSA (EAST 51ST)

74145 TULSA (EAST 51ST)

73119-3715 Oklahoma City - Oklahoma

Safety Council

74037 TULSA (EAST 51ST)

74037 TULSA (EAST 51ST)

74447 Tulsa - Christiansen Aviation

Inc.

75491 DALLAS/RICHARDSON

75491 DALLAS/RICHARDSON

75491 DALLAS/RICHARDSON

75491 DALLAS/RICHARDSON

74361-8747 TULSA (EAST 51ST)

74008 TULSA (EAST 51ST)

ONLY

74470 Tulsa - Christiansen Aviation

Inc.

78130 San Antonio - Innovative Minds

73008 Oklahoma City - Oklahoma Safety Council

74019 Shreveport - Shreveport Training and Testing Center

73160 Oklahoma City - Oklahoma Safety Council

73045 OKLAHOMA CITY

73160 Oklahoma City - Oklahoma Safety Council

74365 Tulsa - Oklahoma Safety Council

74804 OKLAHOMA CITY

78703 AUSTIN - (IH35)

78703 AUSTIN - (IH35)

73013 OKLAHOMA CITY

74432 MCALESTER

73099 Oklahoma City - Oklahoma

Safety Council

73099 OKLAHOMA CITY

74365 TULSA (EAST 51ST)

72704 TULSA (EAST 51ST)

74745 MCALESTER

73109 Oklahoma City - Oklahoma

Safety Council 73159 Oklahoma City - Oklahoma

Safety Council 74134 Tulsa - Oklahoma Safety

Council

73639 WOODWARD

73448 Ardmore - Southern Tech 73481 Ardmore - Southern Tech 73051-9708 Wayne - Mid America

Technology Center 73160 Oklahoma City - Oklahoma

73051 OKLAHOMA CITY

67901 WOODWARD

67901 WOODWARD

85901 TULSA (EAST 51ST)

85901 TULSA (EAST 51ST)

74878 Wayne - Mid America

Technology Center

73120 OKLAHOMA CITY

73120 OKLAHOMA CITY

73093 Wayne - Mid America Technology Center

73110 OKLAHOMA CITY

73068 OKLAHOMA CITY

73159-2923 OKLAHOMA CITY

36067 HUNTSVILLE

74012 Tulsa - Oklahoma Safety

Council

74127 TULSA (EAST 51ST)

74066 OKLAHOMA CITY

73084 OKLAHOMA CITY

73160 Oklahoma City - Oklahoma

Safety Council 73010 Norman - Moore Norman

Technology Center 73010 Norman - Moore Norman

Technology Center

73099 OKLAHOMA CITY

73099 OKLAHOMA CITY

65803 TULSA (EAST 51ST)

74701 Durant - Choctaw Nation of

Oklahoma

74953 MCALESTER

73131 OKLAHOMA CITY

73131 OKLAHOMA CITY

74864 OKLAHOMA CITY

73160 Oklahoma City - Oklahoma

74070-1771 TULSA (EAST 51ST)

74501-6374 MCALESTER

73110 Oklahoma City - Oklahoma

Safety Council

73069 OKLAHOMA CITY

75050 Dallas - Dallas Training and

Testing Center 74006 Tulsa - Oklahoma Safety

Council 73538 Lawton - Great Plains

Technology Center

74106 TULSA (EAST 51ST)

73170 OKLAHOMA CITY

73170 OKLAHOMA CITY

74864 OKLAHOMA CITY

73160 Oklahoma City - Oklahoma

Safety Council

73051 SFO OR SA DEPT SCHEDULING

ONLY

73703 Enid - Autry Technology Center

74930 MCALESTER

74930 MCALESTER

74804 OKLAHOMA CITY

74804 OKLAHOMA CITY

73099 Oklahoma City - Oklahoma Safety Council

73099 Oklahoma City - Oklahoma Safety Council

73051 SFO OR SA DEPT SCHEDULING

ONLY

73072 Oklahoma City - Oklahoma Safety Council

73111 OKLAHOMA CITY

73162 OKLAHOMA CITY

74133 TULSA (EAST 51ST)

73020 OKLAHOMA CITY

74010 TULSA (EAST 51ST)

73130 OKLAHOMA CITY

73018 Ardmore - Southern Tech 73018 Ardmore - Southern Tech

75074 DALLAS/RICHARDSON

75074 DALLAS/RICHARDSON

73010 OKLAHOMA CITY

37042 ABILENE (PIONEER)

74014 TULSA (EAST 51ST)

74014 TULSA (EAST 51ST)

74032 Ponca City - Pioneer

Technology Center 73010 Norman - Moore Norman

Technology Center 73448 Shreveport - Shreveport

Training and Testing Center

74429 TULSA (EAST 51ST)

74403 Tulsa - Oklahoma Safety Council

73010 OKLAHOMA CITY

73010 OKLAHOMA CITY

37212 Tampa - Tampa Training and Testing Center

37212 Tampa - Tampa Training and Testing Center

73139 Oklahoma City - Oklahoma Safety Council

73026 OKLAHOMA CITY

92618 Memphis - Cybersecurity

Institute at Lab Four 92618 Memphis - Cybersecurity

Institute at Lab Four 73008 Oklahoma City - Oklahoma

Safety Council

74014 TULSA (EAST 51ST)

74014 TULSA (EAST 51ST)

74017-4236 Tulsa - Oklahoma Safety

33982 Tampa - Tampa Training and

Testing Center

74110 TULSA (EAST 51ST)

74073 Shreveport - Shreveport

Training and Testing Center

74073 TULSA (EAST 51ST)

74073 Shreveport - Shreveport Training and Testing Center

74073 TULSA (EAST 51ST)

72956 Bentonville - Legends Air Center

74044 Tulsa - Christiansen Aviation Inc.

73099 Oklahoma City - Oklahoma Safety Council

74105 SFO OR SA DEPT SCHEDULING

ONLY

73160 OKLAHOMA CITY

73078 OKLAHOMA CITY

73099 Oklahoma City - Oklahoma

Safety Council 73099 Oklahoma City - Oklahoma

Safety Council

66071 OLATHE

74954 OKLAHOMA CITY

74954 OKLAHOMA CITY

77040 Houston East - Innovative

Minds

73162 OKLAHOMA CITY

74017 Tulsa - Oklahoma Safety

Council

75160 DALLAS/RICHARDSON

75160 Ardmore - Southern Tech

75160 DALLAS/RICHARDSON

75160 Ardmore - Southern Tech 74346 Tulsa - Oklahoma Safety

Council

73036 OKLAHOMA CITY

73159 Oklahoma City - Oklahoma

73078 OKLAHOMA CITY

73170 Oklahoma City - Oklahoma

64870 SPRINGFIELD MO

73099 OKLAHOMA CITY

73065 Oklahoma City - Oklahoma Safety Council

73065 Oklahoma City - Oklahoma Safety Council

74429 TULSA (EAST 51ST)

74533 Durant - Choctaw Nation of Oklahoma

74063 TULSA (EAST 51ST)

73130 OKLAHOMA CITY

73110 OKLAHOMA CITY

73170 OKLAHOMA CITY

74601 Ponca City - Pioneer

Technology Center

74804 OKLAHOMA CITY

73072 OKLAHOMA CITY

73130 Oklahoma City - Oklahoma

Safety Council 74764 Durant - Choctaw Nation of

Oklahoma

73128 OKLAHOMA CITY

73128 OKLAHOMA CITY

74342 Tulsa - Christiansen Aviation Inc.

75063 Ardmore - Southern Tech 75063 Ardmore - Southern Tech

73086 TULSA (EAST 51ST)

73049 OKLAHOMA CITY

73662 SFO OR SA DEPT SCHEDULING

ONLY

74037 Tulsa - Christiansen Aviation Inc.

74037 Tulsa - Christiansen Aviation Inc.

73099 Oklahoma City - Oklahoma

73099 Oklahoma City - Oklahoma

72955 MCALESTER

80007 FORT COLLINS

80007 FORT COLLINS

73130 OKLAHOMA CITY

73030 Oklahoma City - Oklahoma

Safety Council

75173 DALLAS/RICHARDSON

75173 DALLAS/RICHARDSON

74403 TULSA (EAST 51ST)

74403 TULSA (EAST 51ST)

73010 Oklahoma City - Oklahoma

Safety Council

74129 TULSA (EAST 51ST)

74953 MCALESTER

74075 OKLAHOMA CITY

74075 Ponca City - Pioneer

Technology Center 74538 Oklahoma City - Oklahoma

Safety Council 74726 Durant - Choctaw Nation of

Oklahoma

64836 SPRINGFIELD MO

67124 WOODWARD

73601 Weatherford - Southwestern

Oklahoma State University 73601 Weatherford - Southwestern

Oklahoma State University

73012 OKLAHOMA CITY

72842 MCALESTER

74361 TULSA (EAST 51ST)

73132 OKLAHOMA CITY

73032 Ardmore - Southern Tech 72719 Bentonville - Legends Air

Center 72719 Bentonville - Legends Air

Center

74436 MCALESTER

74033 Tulsa - Christiansen Aviation

73529 Lawton - Great Plains Technology Center

76082 Durant - Choctaw Nation of Oklahoma

74066 TULSA (EAST 51ST)

73159 Oklahoma City - Oklahoma Safety Council

74033 Tulsa - Christiansen Aviation Inc.

73099 Oklahoma City - Oklahoma Safety Council

73064 Oklahoma City - Oklahoma Safety Council

73010 Oklahoma City - Oklahoma Safety Council

73115-2224 OKLAHOMA CITY

73165 OKLAHOMA CITY

73106 OKLAHOMA CITY

75135 TULSA (EAST 51ST)

75135 TULSA (EAST 51ST)

50276 WEST DES MOINES

72774 Tulsa - Oklahoma Safety Council

73040 OKLAHOMA CITY

74107 TULSA (EAST 51ST)

73099 OKLAHOMA CITY

73099 OKLAHOMA CITY

74833 Tulsa - Oklahoma Safety Council

73702 Enid - Autry Technology Center 74075 Ponca City - Pioneer

Technology Center

73153 OKLAHOMA CITY

74019 TULSA (EAST 51ST)

74003 TULSA (EAST 51ST)

74003 TULSA (EAST 51ST)

73099 OKLAHOMA CITY

74106 TULSA (EAST 51ST)

78541 ABILENE (PIONEER)

74447 TULSA (EAST 51ST)

74019 Tulsa - Christiansen Aviation Inc.

27330 Bellevue - Brainseed Testing Center

73160 Norman - Moore Norman Technology Center

74883 MCALESTER

73160 Oklahoma City - Oklahoma

Safety Council 74533 Durant - Choctaw Nation of

Oklahoma

74059 OKLAHOMA CITY

74066 TULSA (EAST 51ST)

73057-1007 Wayne - Mid America

Technology Center

64834 SPRINGFIELD MO

32092 Jacksonville - Jacksonville

Training and Testing Center 32092 Jacksonville - Jacksonville

Training and Testing Center 73099 Oklahoma City - Oklahoma

Safety Council

73078 OKLAHOMA CITY

73078 OKLAHOMA CITY

73110 OKLAHOMA CITY

74075 OKLAHOMA CITY

73034 OKLAHOMA CITY

74820 OKLAHOMA CITY

74110 TULSA (EAST 51ST)

73008 Oklahoma City - Oklahoma

74428 MCALESTER

70546 Shreveport - Shreveport

Training and Testing Center

73099 OKLAHOMA CITY

73099 OKLAHOMA CITY

74011 Tulsa - Oklahoma Safety

Council

73170 TULSA (EAST 51ST)

79705 MIDLAND - WESTWOOD

VILLAGE SHOPPING CENTER

79705 MIDLAND - WESTWOOD

VILLAGE SHOPPING CENTER

73051 SFO OR SA DEPT SCHEDULING

ONLY

74953 MCALESTER

73106 OKLAHOMA CITY

73762 OKLAHOMA CITY

73112 OKLAHOMA CITY

74008 Tulsa - Christiansen Aviation Inc.

74804 OKLAHOMA CITY

74804 OKLAHOMA CITY

74132 Tulsa - Christiansen Aviation Inc.

74467 Tulsa - Christiansen Aviation Inc.

74055 Tulsa - Oklahoma Safety Council

74055 Tulsa - Oklahoma Safety Council

73108 OKLAHOMA CITY

73108 OKLAHOMA CITY

73701 Enid - Autry Technology Center 73099 Oklahoma City - Oklahoma

Safety Council 73127 Oklahoma City - Oklahoma

Safety Council

74467 TULSA (EAST 51ST)

73401 Ardmore - Southern Tech

73129-8657 OKLAHOMA CITY

73130 OKLAHOMA CITY

73130 OKLAHOMA CITY

73701 Enid - Autry Technology Center 74020 Tulsa - Christiansen Aviation

Inc.

73018 Norman - Moore Norman

Technology Center 73099 Oklahoma City - Oklahoma

Safety Council

73142 OKLAHOMA CITY

72753 Tulsa - Oklahoma Safety

Council 73456 Ardmore - Southern Tech 73068 Wayne - Mid America

Technology Center

73013 OKLAHOMA CITY

78702 RIVERSIDE - MISSION GROVE

74464 TULSA (EAST 51ST)

73738-0302 Enid - Autry Technology Center 75501 Shreveport - Shreveport

Training and Testing Center 75501 Shreveport - Shreveport

Training and Testing Center 73064 Oklahoma City - Oklahoma

Safety Council 73130-1133 Oklahoma City - Oklahoma

Safety Council

74745 OKLAHOMA CITY

73099 OKLAHOMA CITY

73099 OKLAHOMA CITY

74133 Tulsa - Oklahoma Safety Council

64804 SPRINGFIELD MO

73013 OKLAHOMA CITY

73501 Lawton - Great Plains Technology Center

73159 Oklahoma City - Oklahoma Safety Council

73013 OKLAHOMA CITY

73507 Lawton - Great Plains Technology Center

73052 Wayne - Mid America Technology Center

74105 TULSA (EAST 51ST)

74132 TULSA (EAST 51ST)

73044 OKLAHOMA CITY

73115 OKLAHOMA CITY

73115 OKLAHOMA CITY

73503 Norman - Moore Norman

Technology Center

74604 OKLAHOMA CITY

74441 Tulsa - Oklahoma Safety

Council

73051 SFO OR SA DEPT SCHEDULING

ONLY

73051 SFO OR SA DEPT SCHEDULING

ONLY

73013 OKLAHOMA CITY

73093 Wayne - Mid America

Technology Center 73093 Wayne - Mid America

Te…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .