ESBD_520356_1780328639795_Attachment ENC-1_Camp Mabry BLD8 Trailer Placement.pdf

PDF 336 KB Posted

Attached to
Camp Mabry Temporary Modular Office Building
Solicitation number
TMD26-CFMO-RFI001
Issued by
Travis County, Texas

About this file

This is a site plan attachment document for the Texas Military Department's Camp Mabry Temporary Modular Office Building project in Austin, Texas. The attachment illustrates the proposed placement of a trailer (Building 8) at Camp Mabry and depicts the existing utility infrastructure at the site, including electrical systems (overhead and underground electrical lines, transformers, switches, meters, and junction boxes), water systems (valves, lines, and manholes), and wastewater systems (valves and lines). The document serves as a visual reference for vendors responding to the June 2026 Request for Information regarding the temporary modular office building, which will accommodate up to 150 personnel with specific functional requirements including enclosed offices, open workspace, conference rooms, secure areas, and full building systems. Mandatory site visits are scheduled for June 9 and June 10, 2026, at Building 37, Camp Mabry, 2200 W. 35th Street, Austin, Texas, with RFI responses due by July 14, 2026.

This attachment provides critical infrastructure information necessary for vendors to assess the feasibility of modular building placement and utility connections at the Camp Mabry location. The diagram identifies existing electrical transmission and primary/secondary lines, both overhead and underground, as well as water supply and wastewater infrastructure, enabling respondents to accurately estimate installation requirements, costs for setup and removal, and lead times for delivery and deployment. Vendors must submit cost proposals for rental, setup, and removal services, along with lease-to-own comparisons and maintenance service descriptions, via email in searchable PDF format to FY26RFIPORT@cfmo.mil.texas.gov. The temporary modular building will support office functions during building renovations estimated to run from March 2027 through March 2030.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

;,: Exter Light. . .

·········1

� Elec Meter

- OHE, Transmission ® Water Valve

OHE, Primary

@ r a Elec Xformer

Water Manhole

- OHE, Secondary.

Water line . Elec Switch

UGE, Primary /

® WW Valve■ Elec Junction e»rmmm @ Elec Manhole

••••• UGE, Secondary •••••• VvW Line

File details come from the government source that posted it. Updated .