This is a construction document set issued by the Texas Historical Commission for roof replacement work at the French Legation State Historic Site, a National Register-listed property and designated Texas Historic Landmark located at 802 San Marcos Street, Austin, Texas. The project (HSD-2025-016) involves removal of existing cedar shake roofing and replacement with new cedar shake roofing on the historic house, kitchen, and privy structures, along with related flashing, accessories, and incidental repairs to window sills and dormer siding. The scope of work includes removal and legal offsite disposal of existing cedar shake roofing down to lath boards or plywood, replacement of damaged lath boards to match existing conditions, installation of new shakes and flashing per specifications, repair or replacement of window sills at dormer windows, and replacement of damaged siding at dormer window vicinity. The contractor must comply with the Secretary of Interior's Standards for the Treatment of Historic Properties and current Cedar Shake & Shingle Bureau recommendations, with certain exceptions permitted for historic structures. A site representative will conduct inspections, and the contractor must observe state business hours unless alternative arrangements are made in advance. The contractor shall provide all materials, labor, and equipment; submit product information and shop drawings for approval prior to commencing work; and may utilize site water and power at no cost.
The project specifications require premium-grade, kiln-dried western red cedar shakes treated with fire-retardant chemicals, 18 inches long and one-half inch thick at the butt, with 5-inch weather exposure and widths between 4 and 9 inches. All fasteners must be stainless steel and approved for use with fire-retardant-treated shakes, and all sheet metal flashing shall be 26-gauge minimum galvalume metal. The contractor must have not less than five years of successful experience in wood shake or shingle roofing installations and must have completed at least five similar roofing installations evenly spaced over the past five years. A pre-installation mock-up is required for review and written acceptance prior to starting final work, demonstrating proper assembly of materials including exposure, laps, joints, felts, and fasteners. The contractor shall provide a five-year installer's guarantee against leaks and defects and must furnish a minimum of 10 percent extra stock of installed shakes in clearly labeled bundles for owner storage. The contractor is responsible for job site safety, temporary restroom facilities for employees, protection of adjacent surfaces and existing vegetation, daily debris collection and proper disposal, and repair of any construction damage to pre-construction conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
East 11 th Street
East 7 th Street
East 8 th Street
East 9 th Street
East 10 th Street
East 8 th Street
I-3
Fr on ta ge
R oa d
I-3
Fr on ta ge
R oa d
Sa n
M ar co s
St re et
W al le r S tre et
Ly di a St re et
Br an ch S tre et
Em ba ss y
D riv e
French Legation State Historic Site
Construction Documents Set: 5/5/26
Texas Historical Commission P.O. Box 12276
Austin, TX 78711-2276 Phone - 512.463.3297
A-0.0 - GENERAL NOTES
A-0.1 - WOOD SHAKE ROOF SPECIFICATIONS
A-0.2 - WOOD SHAKE ROOF SPECIFICATIONS
A-1.0 - SITE PLAN
A-3.0 - LEGATION HOUSE ROOF PLAN
A-3.1 - KITCHEN & PRIVY ROOF PLAN
A-4.0-A-4.3 - LEGATION HOUSE ELEVATIONS
A-7.0 - DETAILS
A-8.0 & A-8.1 - EXISTING PHOTOGRAPHS
SCOPE OF WORK SUMMARY:
BASE BID:
1. REMOVE EXISTING CEDAR SHAKE ROOF,
FLASHING, ETC. DOWN TO LATH
BOARDS/PLYWOOD ON HISTORIC HOUSE,
KITCHEN, & PRIVY. DISPOSE OF MATERIAL
LEGALLY, OFFSITE.
2. REPLACE DAMAGED LATH BOARDS TO
MATCH EXISTING ON HISTORIC HOUSE
3. INSTALL NEW SHAKES, FLASHING AND
ACCESSORIES ON HISTORIC HOUSE,
KITCHEN, & PRIVY. SEE SPECIFICATIONS,
A-0.1 & A-0.2
4. REPAIR/REPLACE WINDOW SILLS @
DORMER WINDOWS.
5. REPLACE DAMAGED SIDING @ DORMER
WINDOWS
VICINITY MAP:INDEX OF DRAWINGS:
PROJECT #: HSD-2025-016
EXHIBIT XVII
CONSTRUCTION DOCUMENTS
HOUSE & KITCHEN ROOF REPLACEMENT
French Legation State Historic Site 802 San Marcos Street, Austin, TX 78702
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
THE TEXAS HISTORICAL COMMISSION (THC) ISSUES THESE CONSTRUCTION
DOCUMENTS TO QUALIFIED INDIVIDUALS OR FIRMS TO REPLACE EXISTING
CEDAR SHAKE ROOFING WITH NEW REPLACEMENT CEDAR SHAKES,
INCLUDING RELATED MATERIALS AND ACCESSORIES ON THE FRENCH
LEGATION STATE HISTORIC SITE.
THE FOLLOWING GENERAL NOTES APPLY IN ALL CASES TO THE GENERAL
CONDITIONS ENCOUNTERED AND PROVIDE A REFERENCE FOR THE
CONTRACTOR TO THE SCOPE OF WORK, INTENT AND THE REQUIRED
STANDARDS.
PART 1 - GENERAL NOTES
1.1 ALL WORK MUST COMPLY WITH ALL APPLICABLE LOCAL, STATE AND
FEDERAL ORDINANCES, CODES AND STANDARDS.
A. FRENCH LEGATION STATE HISTORIC SITE IS LISTED ON THE
NATIONAL REGISTER OF HISTORIC PLACES AND IS DESIGNATED AS
A REGISTERED TEXAS HISTORIC LANDMARK.
B. WORK MUST COMPLY WITH THE SECRETARY OF INTERIOR'S
“STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES.
C. WORK MUST COMPLY WITH THE MOST CURRENT PUBLICATION BY
THE CEDAR SHAKE & SHINGLE BUREAU (CSSB). CERTAIN
EXCEPTIONS ARE MADE TO ACCOMMODATE THE TREATMENT OF
HISTORIC STRUCTURES. THE CONTRACTOR SHALL NOTIFY THE
OWNER AND/OR ARCHITECT IF DISCREPANCIES EXIST.
1.2 A REPRESENTATIVE OF FRENCH LEGATION HISTORIC SITE WILL BE
DESIGNATED FOR INSPECTION OF THE WORK.
1.3 STATE BUSINESS HOURS WILL BE OBSERVED BY THE CONTRACTOR
UNLESS ALTERNATIVE ARRANGEMENTS HAVE BEEN MADE WITH THE SITE
STAFF IN ADVANCE.
1.4 THE CONTRACTOR IS TO PROVIDE ALL MATERIALS, LABOR AND
EQUIPMENT REQUIRED TO COMPLETE THE WORK AS DESCRIBED IN THE
CONSTRUCTION DOCUMENTS.
1.5 SUBMIT COMPLETED PRODUCT INFORMATION AND SHOP DRAWINGS FOR
ALL NEW BUILDING COMPONENTS FOR APPROVAL BY ARCHITECT AND/OR
OWNER PRIOR TO COMMENCING WORK.
1.6 THE CONTRACTOR MAY UTILIZE SITE WATER AND POWER SUPPLIES AS
NEEDED FOR THE WORK AT NO COST TO THE CONTRACTOR.
1.7 THE CONTRACTOR SHALL PROVIDE TEMPORARY, PORTABLE RESTROOM
FACILITIES FOR EMPLOYEES. THE CONTRACTOR AND ITS EMPLOYEES
MAY NOT USE SITE FACILITIES.
1.8 THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SAFETY AND SHALL
COMPLY WITH ALL REQUIRED SAFETY STANDARDS AND REGULATIONS
THAT APPLY. WHERE REQUIRED, ERECT BARRIERS SCAFFOLDING AND
SIGNS FOR THE SAFE EXECUTION OF THE WORK AND TO MAINTAIN A
CLEAN, SAFE AND SECURE JOB SITE.
1.9 VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BY TAKING FIELD
MEASUREMENTS AND OBSERVATIONS. THE DIMENSIONS SHOWN ON THE
DRAWINGS ARE INTENDED TO GIVE GENERAL SIZES, SHAPES,
RELATIONSHIPS AND TO SHOW THE EXTENT OF THE WORK. INFORM THE
THC PROJECT ARCHITECT SHOULD ANY DISCREPANCIES EXIST PRIOR TO
PROCEEDING WITH WORK.
1.10 DO NOT CALCULATE MEASUREMENTS BY SCALING THE DRAWINGS. IF
ADDITIONAL INFORMATION IS NEEDED, CONTACT THE THC PROJECT
ARCHITECT.
1.11 ALL WORK SHALL BE PLUMB, SQUARE, LEVEL AND TRUE TO LINE.
PART 2 - SITE WORK
2.1 PROTECT ALL ADJACENT SURFACES AND OBJECTS FROM DAMAGE.
PROTECT ALL EXISTING TREES AND VEGETATION IN WORK AREAS.
2.2 NO EQUIPMENT WILL BE ALLOWED OFF PAVEMENT WHEN GROUND
CONDITIONS ARE WET AND SOFT IN ORDER AVOID WHEEL TRACKING AND
RUTTING. WEATHER DELAY DAYS WILL BE GRANTED WHEN WARRANTED.
2.3 COORDINATE VEHICULAR ROUTES FOR ALL WORK AND DELIVERIES WITH
THE SITE MANAGER TO LIMIT IMPACT OF THE PROJECT ON THE OVERALL
SITE. STAGE AND STORE MATERIALS, AND PARK VEHICLES AS
COORDINATED WITH THE SITE MANAGER.
2.4 REPAIR ALL CONSTRUCTION DAMAGE IN WORK AREA TO DOCUMENTED
PRE-CONSTRUCTION CONDITIONS.
2.5 WORK AREAS ARE TO REMAIN CLEAN AND FREE FROM DEBRIS.
CONSTRUCTION WASTE IS TO BE COLLECTED AT THE END OF EACH
WORKDAY AND PROPERLY DISPOSED.
PART 3 - WARRANTY
3.1 THE CONTRACTOR WARRANTS TO THE OWNER AND ARCHITECT THAT
MATERIALS AND EQUIPMENT FURNISHED UNDER THE CONTRACT WILL BE
OF GOOD QUALITY AND NEW UNLESS OTHERWISE REQUIRED OR
PERMITTED BY THE CONTRACT DOCUMENTS, THAT THE WORK WILL BE
FREE FROM DEFECTS NOT INHERENT IN THE QUALITY REQUIRED OR
PERMITTED, AND THAT THE WORK WILL CONFIRM TO THE REQUIREMENTS
OF THE CONTRACT DOCUMENTS. WORK NOT CONFORMING TO THESE
REQUIREMENTS, INCLUDING SUBSTITUTIONS NOT PROPERLY APPROVED
AND AUTHORIZED, MAY BE CONSIDERED DEFECTIVE. THE CONTRACTOR'S
WARRANTY EXCLUDES REMEDY FOR DAMAGE OR DEFECTS CAUSED BY
ABUSE, MODIFICATIONS NOT EXECUTED BY THE CONTRACTOR, IMPROPER
OR INSUFFICIENT MAINTENANCE, IMPROPER OPERATION, NORMAL WEAR
AND TEAR, AND NORMAL USAGE. IF REQUIRED BY THE ARCHITECT, THE
CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO THE KIND
AND QUALITY OF MATERIALS AND EQUIPMENT.
3.1 ALL WORK SHALL BE GUARANTEED AGAINST DEFECTIVE MATERIALS AND
WORKMANSHIP FOR A PERIOD OF (1) YEAR AFTER SUBSTANTIAL
COMPLETION OR ACCEPTANCE OF THE WORK. THE CONTRACTOR SHALL
REPAIR OR REPLACE, AT HIS OWN EXPENSE WHEN ORDERED TO DO SO,
ALL WORK THAT MAY DEVELOP DEFECTS IN MATERIAL AND
WORKMANSHIP WITHIN SAID PERIOD OF TIME.
END OF SECTION
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/14/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
General Notes
A-0.0
5/5/2026
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
07 31 29 WOOD SHAKE AND SHINGLE ROOFING
PART 1 - GENERAL
1.1 DESCRIPTION OF WORK:
A. WOOD SHAKE AND SHINGLE ROOFING INCLUDES THE REMOVAL
AND DISPOSAL OF EXISTING WOOD SHAKES OR SHINGLES,
PREPARATION OF THE ROOF SUBSTRATE, THE INSTALLATION OF
REQUIRED METAL FLASHING AND THE INSTALLATION OF NEW,
CEDAR ROOF SHAKES OR SHINGLES.
1.2 SUBMITTALS:
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA,
INSTALLATION INSTRUCTIONS AND GENERAL
RECOMMENDATIONS FOR EACH MATERIAL PROPOSED FOR USE,
INCLUDING COMPATIBILITY OF PROPOSED FASTENERS WITH FIRE
RETARDANT-TREATED SHAKES OR SHINGLES.
a. WOOD TREATMENT DATA INCLUDING CHEMICAL TREATMENT
MANUFACTURER'S INSTRUCTIONS FOR HANDLING, STORING,
INSTALLATION, AND FINISHING OF TREATED MATERIAL.
b. FOR FIRE RETARDANT-TREATED WOOD SHAKES OR SHINGLES, INCLUDE CERTIFICATION BY FULL-CELL VACUUM-PRESSURE
TREATMENT PLANT THAT STATES THE SHAKES OR SHINGLES
ARE COMPLIANT WITH APPLICABLE STANDARDS.
B. SAMPLES: FOR APPROVAL PRIOR TO ERECTING MOCKUPS
c. PROVIDE SAMPLES OF NEW WOOD SHAKES OR SHINGLES
ILLUSTRATING THE VARIETY OF WIDTHS AVAILABLE.
d. PROVIDE SAMPLES OF METAL FLASHING ILLUSTRATING THE
FINISH AND THE VARIETY OF SHAPES TO BE USED.
1.3 QUALITY ASSURANCE:
A. INSTALLER QUALIFICATIONS: A SINGLE CONTRACTOR SHALL
PERFORM THE WORK OF THIS SECTION AND SHALL BE A
CONTRACTOR EMPLOYING PEOPLE WITH NOT LESS THAN FIVE (5)
YEARS OF SUCCESSFUL EXPERIENCE IN INSTALLATION OF WOOD
SHAKE OR SHINGLE ROOFING SYSTEMS SIMILAR TO THOSE
REQUIRED FOR THIS PROJECT. THE CONTRACTOR SHALL BE A
COMPANY HAVING DONE NOT LESS THAN FIVE WOOD SHAKE OR
SHINGLE ROOFING INSTALLATIONS EVENLY SPACED OVER THE
PAST FIVE YEARS. INSTALLATION OF OTHER TYPES OF ROOFING
DOES NOT QUALIFY.
B. INDUSTRY STANDARD: EXCEPT AS OTHERWISE SHOWN OR
SPECIFIED, COMPLY WITH APPLICABLE RECOMMENDATIONS AND
DETAILS OF THE FOLLOWING:
e. “ROOF MANUAL” BY CEDAR SHAKE & SHINGLE BUREAU (CSSB), CURRENT EDITION.
f. “ARCHITECTURAL SHEET METAL MANUAL” BY THE SHEET METAL
AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA), CURRENT EDITION.
C. FIRE PERFORMANCE CHARACTERISTICS: PROVIDE PRODUCTS
THAT ARE IDENTICAL TO THOSE TESTED FOR THE FOLLOWING
FIRE PERFORMANCE CHARACTERISTICS, BY UL OR OTHER
TESTING AND INSPECTION ORGANIZATIONS ACCEPTABLE TO
AUTHORITIES HAVING JURISDICTION. EACH BUNDLE OF SHAKES
SHALL BEAR THE LABEL OR HAVE THE IDENTIFICATION MARK OF
AN APPROVED INSPECTION BUREAU OR AGENCY SHOWING THE
GRADE.
g. FIRE-RESISTANCE RATINGS: EACH BUNDLE OF SHAKES OR
SHINGLES SHALL COMPLY WITH UBC STANDARD 15-3 OR 15-4,
RESPECTIVELY. SHAKES OR SHINGLES ARE TO BE IMPREGNATED
BY THE FULL-CELL VACUUM-PRESSURE PROCESS WITH
FIRE-RETARDANT CHEMICALS, COMPLYING WITH UBC STANDARD
15-2 FOR USE ON CLASS A, B, OR C ROOFS.
1.4 PERFORMANCE REQUIRED:
A. REVIEW EXISTING CONDITIONS, COMPARE TO THE CONTRACT
DOCUMENTS AND REPORT ANY PERCEIVED CONDITIONS WHICH
WOULD HINDER THE INSTALLATION OF A PERMANENTLY
WATERTIGHT, SECURELY ATTACHED ROOF SYSTEM.
B. SURVEY AND TESTING: WORK OF THIS CONTRACT INCLUDES
SURVEYING ALL ROOF DECK AND DOCUMENTING SPECIFIC
DEFECTS. REPLACE ADDITIONAL DEFECTIVE WORK IN
ACCORDANCE WITH CONTRACT DOCUMENTS.
1.5 MOCK-UPS:
A. FIELD-CONSTRUCTED MOCK-UP: PRIOR TO INSTALLATION, ERECT
MOCK-UPS FOR EACH FORM OF CONSTRUCTION AND FINISH
REQUIRED TO VERIFY SELECTIONS MADE UNDER SAMPLE
SUBMITTALS AND TO DEMONSTRATE AESTHETIC EFFECTS AS
WELL AS QUALITIES OF MATERIALS AND EXECUTION. BUILD
MOCK-UPS TO COMPLY WITH THE FOLLOWING REQUIREMENTS,
USING MATERIALS INDICATED FOR FINAL UNIT OF WORK.
1. MOCK-UP OF EAVE, RAKE, AND RIDGE DETAIL, SHOWING
UNDERLAYMENT, VENTILATION MEMBRANE AND ASSOCIATED
FLASHING.
2. MOCK-UP OF EACH TYPE OF ROOF PENETRATION SHOWING
VENT, UNDERLAYMENT, VENTILATION MEMBRANE AND
ASSOCIATED FLASHING.
3. MOCK-UP INSTALLATION OF LIGHTNING PROTECTION SYSTEM TO
DEMONSTRATE INTEGRATION WITH ROOF COMPONENTS.
B. BUILD MOCK-UPS ON SITE IN LOCATION AND SIZE AS DIRECTED
BY ARCHITECT. NOTIFY ARCHITECT AT LEAST ONE WEEK IN
ADVANCE OF THE SCHEDULED SITE VISIT WHEN MOCK-UP WILL
BE READY FOR REVIEW.
C. DEMONSTRATE THE PROPOSED RANGE OF AESTHETIC EFFECTS
AND WORKMANSHIP. MOCK-UP SHALL SHOW PROPER ASSEMBLY
OF MATERIALS PER DETAILS, INCLUDING BUT NOT LIMITED TO,
EXPOSURE, LAP, JOINTS, FELTS, FASTENERS, AND SHAKES.
1. OBTAIN ARCHITECT'S WRITTEN ACCEPTANCE OF MOCK-UP
BEFORE START OF FINAL WORK.
2. RETAIN AND MAINTAIN MOCK-UP DURING CONSTRUCTION IN
UNDISTURBED CONDITION AS A STANDARD FOR JUDGING
COMPLETED UNIT OF WORK. WHEN DIRECTED BY ARCHITECT,
DEMOLISH AND REMOVE MOCKUP FROM PROJECT SITE.
1.6 DELIVERY, STORAGE, AND HANDLING:
A. DELIVER MATERIALS TO PROJECT SITE IN MANUFACTURER'S
UNOPENED BUNDLES OR CONTAINERS WITH LABELS INTACT.
B. HANDLE AND STORE MATERIALS AT PROJECT SITE TO PREVENT
WATER DAMAGE, STAINING, OR OTHER PHYSICAL DAMAGE.
COMPLY WITH MANUFACTURERS' RECOMMENDATIONS FOR
JOB-SITE STORAGE, HANDLING AND PROTECTION.
1.7 PROJECT CONDITIONS:
A. PROCEED WITH WORK ONLY WHEN EXISTING AND FORECASTED
WEATHER CONDITIONS WILL PERMIT WORK TO BE INSTALLED IN
COMPLIANCE WITH MANUFACTURER'S RECOMMENDATIONS AND
WHEN SUBSTRATE IS COMPLETELY DRY.
B. THE CONTRACTOR SHALL BE PREPARED TO PROTECT OPENINGS
IN ROOF OR INCOMPLETE PORTIONS OF WORK FROM INCLEMENT
WEATHER.
1.8 WARRANTIES:
A. INSTALLER'S GUARANTEE: SUBMIT EXECUTED COPY OF ROOFING
INSTALLER'S GUARANTEE STATING THAT THE WORK OF THIS
SECTION SHALL BE FREE FROM LEAKS AND OTHER DEFECTS FOR
FIVE (5) YEARS AFTER DATE OF SUBSTANTIAL COMPLETION AND
THAT THE ROOFING INSTALLER WILL CORRECT ANY LEAKS OR
DEFECTS OCCURRING WITHIN THE FIVE-YEAR WARRANTY
PERIOD AT NO ADDITIONAL COST TO THE OWNER. THE
INSTALLER'S GUARANTEE SHALL BE SIGNED BY AN AUTHORIZED
REPRESENTATIVE OF INSTALLER, ON FORM WHICH IS
ACCEPTABLE TO OWNER'S REPRESENTATIVE.
B. ROOFING INSTALLER'S GUARANTEE: PROVIDE THE ROOFING
INSTALLER'S GUARANTEE FOR APPROVAL BY OWNER AND
INCLUDE A COPY IN THE PROJECT CLOSEOUT DOCUMENTATION.
C. PRODUCT WARRANTY: WOOD SHAKE WARRANTY PERIOD SHALL
BE A MINIMUM OF TWENTY-FIVE (25) YEARS FROM DATE OF
SUBSTANTIAL COMPLETION.
PART 2 - PRODUCTS
2.1 WOOD SHAKES:
A. WOOD SHAKES: PREMIUM GRADE CERTI-SPLIT HANDSPLIT
SHAKES (SPLIT FACES AND SAWN BACKS) KILN-DRIED WESTERN
RED CEDAR SHAKES, TREATED WITH CERTI-GUARD FIRE
RETARDANT, OR EQUAL AS APPROVED IN WRITING BY
ARCHITECT.
a. LENGTH AND THICKNESS: [18] INCHES LONG, 1/2 INCH THICK
AT BUTT
b. WIDTHS: MINIMUM [4] INCHES, MAXIMUM [9] INCHES
c. EXPOSURE/REVEAL: [5] INCHES
d. STARTER COURSE: 15 INCHES LONG
e. ROOFING RIDGE/HIP CAPS: SITE-MADE, “BOSTON-CAPPED”
RIDGE/HIP WITH
f. ALTERNATING OVERLAPS.
g. GRADE: PREMIUM (CLEAR HEARTWOOD; 100% EDGE GRAIN;
NO DEFECTS)
h. PROVIDE FIRE RETARDANT-TREATED UNITS IN PACKAGES
BEARING UL CLASS "C" BLUE CERTI-GUARD LABEL.
2.2 UNDERLAYMENT:
A. W.R. GRACE-ULTRA SELF-ADHERING MEMBRANE AS MANUF. BY
GRACE PRODUCTS (WWW.GRACE.COM), OR EQUAL, OVER ENTIRE
ROOF DECK.
2.3 INTERLAYMENT:
A. FELT INTERLAYMENT: 30# ASPHALT-SATURATED ORGANIC FELTS,
UNPERFORATED: CONFORMING TO THE REQUIREMENTS OF
ASTMD226, TYPE II, NO. 30, 36" WIDE ROLLS, ASBESTOS FREE.
NOTE: FELT INTERLAYMENT IS TO BE INSTALLED ABOVE CLOSED
ATTIC SPACES ONLY. IT IS NOT TO BE USED WHERE THE
UNDERSIDE OF THE ROOF IS VISIBLE FROM OCCUPIED ROOMS
BELOW.
2.4 VENTILATION MEMBRANE:
A. "CEDAR BREATHER" AS MANUF. BY BENJAMIN OBDYKE (800)
346-7655 OR APPROVED DETAIL
2.5 FASTENERS
A. APPROVAL: ALL FASTENERS MUST BE APPROVED BY TREATMENT
COMPANY FOR USE WITH FIRE RETARDANT-TREATED SHAKES.
B. NAILS FOR SHAKES: STAINLESS STEEL 6D BOX NAILS W/
RINGSHANK (VERIFY MIN. 3/4" EMBEDMENT INTO ROOF
SHEATHING). ALTERNATE FASTENERS FOR SHAKES: STAINLESS
STEEL TYPE 304 16 GAUGE STAPLES (7/16" W x 1 1/2" L).
C. NAILS FOR FELT: HOT-DIPPED GALVANIZED NAILS OR TYPE 304
OR TYPE 316 STAINLESS STEEL NAILS WITH MINIMUM NO.
13-GAGE, 7/32-INCH HEAD THROUGH METAL DISKS.
ELECTROPLATED, BRIGHT STEEL OR BLUE STEEL FASTENERS
ARE NOT ACCEPTABLE.
D. NAILS FOR FLASHING: AS RECOMMENDED BY FLASHING
MANUFACTURER.
2.6 METAL FLASHING:
A. ALL SHEET METAL FLASHING TO BE 26 GA, MINIMUM GALVALUME
METAL.
B. RIDGE CAP: ROUNDED CAP WITH 6” LEGS.
C. VALLEY FLASHING: FLAT SHEET METAL FLASHING WITH NO
CENTER, V-GROOVE.
D. VERTICAL FLASHING AND COUNTER-FLASHING: AS DETAILED IN
THE DRAWINGS.
PART 3 - EXECUTION
3.1 INSPECTION:
A. EXAMINE SUBSTRATE FOR COMPLIANCE WITH REQUIREMENTS FOR
SUBSTRATES, INSTALLATION TOLERANCES, AND OTHER CONDITIONS
AFFECTING PERFORMANCE OF WORK OF THIS SECTION. DO NOT
PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS
HAVE BEEN CORRECTED IN A MANNER ACCEPTABLE TO THE
/ARCHITECT.
1. FIELD MEASURE EXISTING EAVES, RAKES, AND RIDGES.
2. NOTIFY ARCHITECT OF ANY IRREGULARITIES IN ROOF DECK
CONSTRUCTION, INCLUDING ASYMMETRY, SAGGING, BOWING,
OR OTHER DEFLECTION.
B. PRE-INSTALLATION CONFERENCE: CONDUCT CONFERENCE AT
PROJECT SITE TO COMPLY WITH REQUIREMENTS OF CONTRACT.
SUCH A MEETING WOULD PREFERABLY OCCUR IN CONJUNCTION WITH
MOCK-UP REVIEW.
3.2 INSTALLATION, GENERAL:
A. COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
RECOMMENDATIONS, BUT NOT LESS THAN RECOMMENDED BY THE
FOLLOWING:
1. CEDAR SHAKE AND SHINGLE BUREAU "DESIGN AND APPLICATION
MANUAL FOR NEW ROOF CONSTRUCTION."
2. NATIONAL ROOFING CONTRACTORS ASSOCIATION "THE NRCA
STEEP ROOFING MANUAL," SECTION "WOOD SHINGLE AND WOOD
SHAKE ROOFING."
B. PROVIDE AND INSTALL TEMPORARY PLASTIC SHEET BARRIER AT
ATTIC FLOOR TO CONTAIN AND COLLECT DEBRIS IN ATTIC SPACE
DURING DEMOLITION. REMOVE ALL ROOF MATERIAL AND DEBRIS
FROM ATTIC.
C. NAILING SURFACE MUST BE CLEAN, SMOOTH, DRY AND MUST REMAIN
DRY AFTER APPLICATION. VERIFY ALL DRAWING DIMENSIONS BY
TAKING FIELD MEASUREMENTS AND ASSUME RESPONSIBILITY FOR
SUCH MEASUREMENTS.
D. CLEAN SUBSTRATES OF PROJECTIONS AND SUBSTANCES
DETRIMENTAL TO APPLICATION. SURFACES TO RECEIVE SHAKES ARE
TO BE CLEAN, EVEN, SMOOTH, DRY AND FREE FROM ACTIVE ROT OR
FUNGI ATTACK.
E. COORDINATE INSTALLATION WITH FLASHING AND OTHER ADJOINING
WORK TO ENSURE PROPER SEQUENCING.
3.3 WOOD SHAKE ROOFING INSTALLATION - PLYWOOD/OSB DECKING
A. PLYWOOD DECKING: INSTALL NEW PLYWOOD DECKING OVER ALL
ROOF AREAS AS DETAILED IN THE DRAWINGS.
B. SELF-ADHERING UNDERLAYMENT: APPLY A SINGLE LAYER OF
SELF-ADHERING UNDERLAYMENT DIRECTLY TO ALL EXPOSED DECK
AREAS INCLUDING ALL RIDGES PER MANUFACTURER'S INSTRUCTIONS:
1. LAPPING: INSTALL WITH MINIMUM SIDE LAPS OF 3.5” AND END
LAPS OF 6”.
2. SECURE ALL MEMBRANE EDGES AND OVERLAPS WITH A 2” STEEL
ROLLER.
3. FASTEN UNDERLAYMENT AT SLOPES EXCEEDING 5:12 AS
RECOMMENDED BY MANUFACTURER.
4. DO NOT LEAVE UNDERLAYMENT EXPOSED LONGER THAN TIME
RECOMMENDED BY MANUFACTURER. ALL MEMBRANE LEFT
EXPOSED LONGER THAN THE MANUFACTURER'S RECOMMENDED
TIME WILL BE REMOVED AND REPLACED AT CONTRACTOR'S
EXPENSE. APPLICATION OF ADDITIONAL MEMBRANE LAYER ON
TOP OF PREVIOUSLY EXPOSED MEMBRANE IS NOT ACCEPTABLE.
C. FLASHING: INSTALL FLASHING AS INDICATED AND IN ACCORDANCE
WITH DETAILS AND RECOMMENDATIONS OF THE WOOD SHINGLE AND
WOOD SHAKE SECTION OF "THE NRCA STEEP ROOFING MANUAL."
D. FELT INTERLAYMENT: APPLY 18-INCH-WIDE LAYERS OF FELT
HORIZONTALLY WITH EACH COURSE OF WOOD SHAKES. THE BOTTOM
EDGE OF THE FELT SHOULD BE POSITIONED ABOVE THE BUTT OF THE
SHAKE AT A DISTANCE EQUAL TO TWICE THE WEATHER EXPOSURE
PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. FASTEN FELT
WITH ENOUGH ROOFING NAILS OR NONCORROSIVE STAPLES TO HOLD
INTERLAYMENT IN PLACE UNTIL WOOD SHAKE APPLICATION.
E. VENTILATION MEMBRANE: INSTALL PER MANUFACTURER'S WRITTEN
INSTRUCTIONS.
F. INSTALL WOOD SHAKES, BEGINNING AT LOWER END WITH A DOUBLE
LAYER STARTER COURSE, PROJECTING WOOD SHAKES 1-1/2 INCHES
BEYOND FASCIA/VERGE BOARD. SPACE ADJOINING WOOD SHAKES 3/8
INCH TO 5/8 INCH APART, NAILING EACH WOOD SHAKE WITH TWO
NAILS SPACED 3/4 INCH TO 1 INCH FROM EDGE OF SHAKE AND 1-1/2
INCHES TO 2 INCHES ABOVE BUTT LINE OF SUBSEQUENT COURSE.
STAGGER EDGE JOINTS A MINIMUM OF 1-1/2 INCHES IN SUCCEEDING
COURSES. PREVENT ALIGNMENT OF VERTICAL JOINTS IN EVERY THIRD
COURSE. DRIVE NAILS TIGHT TO TOP SURFACE OF SHAKE WITHOUT
CRUSHING WOOD. DO NOT DRIVE FLUSH WITH SURFACE OF SHAKE.
1. WEATHER EXPOSURE: [5] INCHES FOR 18-INCH-LONG WOOD
SHAKES.
2. RIDGES AND EDGES: CUT AND FIT WOOD SHAKES USING
SITE-MADE, “BOSTON-CAPPED” RIDGES WITH ALTERNATING
OVERLAPS AND 6-INCH WIDTHS. CUT EDGES TO PROVIDE
MAXIMUM WEATHER PROTECTION WITH 5-INCH MINIMUM WIDTHS.
INSTALL FASTENERS OF SUFFICIENT LENGTH TO PENETRATE
LATH/DECK AS SPECIFIED.
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Wood Shake Roofing Specifications
A-0.1
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
OR PERMIT PURPOSES
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Wood Shake Roofing Specifications
A-0.2
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
3.4 WOOD SHAKE ROOF INSTALLATION - ROOF LATHE/SHEATHING
BOARDS
G. ROOF LATHE OR SHEATHING BOARDS: REPLACE ROTTED OR BROKEN
BOARDS WITH NEW, MATCHING EXISTING BOARD WIDTH, THICKNESS
AND EDGE STYLE (DIMENSIONAL LUMBER OR LIVE EDGE BOARDS).
H. FLASHING: INSTALL FLASHING AS INDICATED AND IN ACCORDANCE
WITH DETAILS AND RECOMMENDATIONS OF THE WOOD SHINGLE AND
WOOD SHAKE SECTION OF "THE NRCA STEEP ROOFING MANUAL."
I. FELT INTERLAYMENT (AT CLOSED ATTICS ONLY): APPLY 18-INCH-WIDE
LAYERS OF FELT HORIZONTALLY WITH EACH COURSE OF WOOD
SHAKES. THE BOTTOM EDGE OF THE FELT SHOULD BE POSITIONED
ABOVE THE BUTT OF THE SHAKE AT A DISTANCE EQUAL TO TWICE THE
WEATHER EXPOSURE PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS. FASTEN FELT WITH ENOUGH ROOFING NAILS OR
NONCORROSIVE STAPLES TO HOLD INTERLAYMENT IN PLACE UNTIL
WOOD SHAKE APPLICATION.
J. INSTALL WOOD SHAKES, BEGINNING AT LOWER END WITH A DOUBLE
LAYER STARTER COURSE, PROJECTING WOOD SHAKES 1-1/2 INCHES
BEYOND FASCIA/VERGE BOARD. SPACE ADJOINING WOOD SHAKES 3/8
INCH TO 5/8 INCH APART, NAILING EACH WOOD SHAKE WITH TWO
NAILS SPACED 3/4 INCH TO 1 INCH FROM EDGE OF SHAKE AND 1-1/2
INCHES TO 2 INCHES ABOVE BUTT LINE OF SUBSEQUENT COURSE.
STAGGER EDGE JOINTS A MINIMUM OF 1-1/2 INCHES IN SUCCEEDING
COURSES. PREVENT ALIGNMENT OF VERTICAL JOINTS IN EVERY THIRD
COURSE. DRIVE NAILS TIGHT TO TOP SURFACE OF SHAKE WITHOUT
CRUSHING WOOD. DO NOT DRIVE FLUSH WITH SURFACE OF SHAKE.
1. WEATHER EXPOSURE: [5] INCHES FOR 18-INCH-LONG WOOD
SHAKES.
2. RIDGES AND EDGES: CUT AND FIT WOOD SHAKES USING
SITE-MADE, [“BOSTON-CAPPED”] RIDGES WITH ALTERNATING
OVERLAPS AND 6-INCH WIDTHS. CUT EDGES TO PROVIDE
MAXIMUM WEATHER PROTECTION WITH 5-INCH MINIMUM WIDTHS.
INSTALL FASTENERS OF SUFFICIENT LENGTH TO PENETRATE
LATH/DECK AS SPECIFIED.
3.5 CLEANING AND PROTECTION:
A. REMOVE AND DISCARD EXISTING CEDAR DEBRIS FROM ROOF AND
SITE. ENSURE THAT ALL REMOVED FASTENERS ARE COLLECTED FROM
THE GROUND AND ATTIC SPACE.
3.5. EXTRA STOCK:
A. PROVIDE A MINIMUM OF 10% OF INSTALLED QUANTITY OF
SHAKES USED FOR EACH BUILDING. PROVIDE TO OWNER IN
CLEARLY LABELED BUNDLES OR CONTAINERS, AND STORE IN A
DRY, PROTECTED, AND VENTILATED LOCATION TO BE
DETERMINED BY OWNER.
END OF SECTION
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
M B
AC
AC
SA
N
M
AR
C O
S
ST
R
EE
T
EAST 8TH STREET
EM
BA
SS
Y
D R
IV
E
ALLEY
N O
R
TH
EA
ST
G
AT
E
SO
U
TH
W
ES
T
G
AT
E
NORTHWEST
GATE
SO
U
TH
EA
ST
G
AT
E
EAST 8TH STREET
N
KITCHEN
LEGATION
HOUSE
PARKING
PRIVY
Site Plan
SCALE: 1" = 50'-0"1
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Site Plan
A-1.0
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
STANDING
SEAM ROOF
(NIC)
CHIMNEY
CHIMNEY
DORMER
DORMER
SEE 5/A-8.1
DORMER
DORMER
RIDGE
RIDGE
RIDGE
RIDGE
R
ID
G E
RID
GE
RIDGE
RID
GE
RIDGE
RIDGESEE 6/A-8.1
RIDGE
SEE 6/A-8.1
'-2
1 4"
29'-101 2"13'-93
4"
43'-81 4"
3' -1
11 4"
6'-7"
3' -1
11 4"
6'-7"
3' -4
1 2"
4'-103 4"
3' -4
1 2"
4'-103 4"
REMOVE EXISTING CEDAR
SHAKE ROOF COMPLETE;
REPAIR/REPLACE SPACER
BOARDS AS NECESSARY,
SEE 1/A-8.1; REFER TO
SPECIFICATIONS
ALL DIMENSIONS ARE
FOR REFERENCE ONLY.
FIELD VERIFY.
A-7.0
Legation House Roof Plan
SCALE: 3/16" = 1'-0"1 N
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Legation House Roof Plan
A-3.0
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
R
ID
G E
C H
AN
G
E
IN
S
LO
PE
CHIMNEY
SEE 4/A-8.0
9'-1" 9'-1"
'-1
'-1
3 4"
7'-1"
'-1
11 4"
18'-21 4"
25'-31 4"
ALL DIMENSIONS ARE
FOR REFERENCE ONLY.
FIELD VERIFY.
REMOVE EXISTING CEDAR
SHAKE ROOF COMPLETE;
REPAIR/REPLACE PLYWOOD
AS NECESSARY; REFER TO
SPECIFICATIONS
4'-2"
4' -6
ALL DIMENSIONS ARE
FOR REFERENCE ONLY.
FIELD VERIFY.
REMOVE EXISTING CEDAR
SHAKE ROOF COMPLETE;
REPAIR/REPLACE PLYWOOD
AS NECESSARY; REFER TO
SPECIFICATIONS
Kitchen Roof Plan
SCALE: 3/16" = 1'-0"1 N
Privy Roof Plan
SCALE: 3/16" = 1'-0"2 N
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Kitchen & Privy Roof Plans
A-3.1
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
10'-8 12" F.F.E.
0'-0" F.F.E.
REINSTALL EXISITNG
LIGHTNING RODS
SEE 4/A-8.1
Legation Front Elevation
SCALE: 3/16" = 1'-0"1
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Legation Front Elevation
A-4.0
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
10'-8 12" F.F.E.
0'-0" F.F.E.
REINSTALL EXISITNG
LIGHTNING RODS
REPAIR DAMAGE
FROM SQUIRRELS
REPAIR/REPLACE
SIDING @ DORMERS
REPAIR/REPLACE
SIDING @ DORMERS
Legation Right Side Elevation
SCALE: 3/16" = 1'-0"1
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Legation Right Side Elevation
A-4.1
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
REINSTALL EXISITNG
LIGHTNING RODS
DOWNSPOUT,
GUTTER NOT SHOWN
FOR CLARITY, TYP.
REPAIR/REPLACE
WINDOW SILL
Legation Back Elevation
SCALE: 3/16" = 1'-0"1
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Legation Back Elevation
A-4.2
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
REINSTALL EXISITNG
LIGHTNING RODS
RESEAL
CHIMNEY
FLASHING
SEE 3/A-8.1
REPAIR/REPLACE
SIDING @ DORMERS
RAILING ATTACHED
@ ROOF
SEE 2/A-8.1
REPAIR/REPLACE
SIDING @ DORMERS
Legation Left Side Elevation
SCALE: 3/16" = 1'-0"1
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Legation Left Side Elevation
A-4.3
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
3" x 4" ATTIC JSTS
3" x 4" RAFTER
HISTORIC CORNICE
COPPER GUTTER
NEW WOOD SHAKES TO
MATCH EXISTING
16 OZ. COPPER EDGE FLASHING
INSPECT EXIST'G S.A.U. AND
REPLACE AS NECCESSARY
EXTEND OVER COPPER
FLASHING
EXIST'G 3/4" PWD TO REMAIN
REPAIR/REPLACE
DAMAGED LATH TO
MATCH EXISTING
Legation House Roof Detail
SCALE: 1 1/2" = 1'-0"1
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Details
A-7.0
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
Aerial View of Legation House & Kitchen NO SCALE1 Legation House, Kitchen, & Privy
NO SCALE2 Legation House
NO SCALE3
Kitchen @ Chimney NO SCALE4 Front of Kitchen
NO SCALE5 Privy
NO SCALE5
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Existing Photographs
A-8.0
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
Underside of Legation House Roof NO SCALE1 Railing Support @ Metal Roof
NO SCALE2 Legation House Chimney
NO SCALE3
Existing Lightning Rod NO SCALE4 Dormer
NO SCALE5 Metal Roof/Shake Roof Junction
NO SCALE6
J:
\1
Fr en ch
L eg at io n\ Ar ch ite ct ur e\ H
SD
-2
5-
H ou se a nd K itc he n R oo fs
\3 D es ig n Ph as e\
TH
C in te rn al d es ig n do cs
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
AT
T S
XETE FO
SA
D A
N
IE
L R
. VALENZU
E
LA
2 16 0 1
R
EG
IS
TE
RED ARCHITEC
T
St at e H is to ric S ite
4/22/2026
Ho us e & Ki tc he n R oo f R ep la ce m en t Fr en ch
L eg at io n
Sa n
M ar co s S tre et
, A us tin , T
X
HSD-2025-016
AT, EU
Existing Photographs
A-8.1
SUBMITTAL
PRELIMINARY FOR
REVIEW ONLY
THESE DOCUMENTS ARE
FOR CONCEPT DESIGN
AND NOT INTENDED FOR
CONSTRUCTION BIDDING
| Sheets and Views |
| French_Legation_Roof_Repair-COVER |
| French_Legation_Roof_Repair-A-0.0 |
| French_Legation_Roof_Repair-A-0.1 |
| French_Legation_Roof_Repair-A-0.2 |
| French_Legation_Roof_Repair-A-1.0 |
| French_Legation_Roof_Repair-A-3.0 |
| French_Legation_Roof_Repair-A-3.1 |
| French_Legation_Roof_Repair-A-4.0 |
| French_Legation_Roof_Repair-A-4.1 |
| French_Legation_Roof_Repair-A-4.2 |
| French_Legation_Roof_Repair-A-4.3 |
| French_Legation_Roof_Repair-A-7.0 |
| French_Legation_Roof_Repair-A-8.0 |
| French_Legation_Roof_Repair-A-8.1 |
File details come from the government source that posted it. Updated .